1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. FA2396-27-9CTBD

Bomber-themed hallway makeover at Wright-Patterson AFB, OH

You would design and install bomber-themed wall graphics, heraldry shields, painting, and four ceiling-hung scale models of the B-52, B-1, B-2, and B-21 in one 2nd floor hallway of Building 556 at Wright-Patterson AFB, Ohio.

Official title: AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)

Deadline
Dec 4, 11:59 PM ET
9 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
OH
Buyer: FA8652 AFRL HQ AFRL/PK

What they're buying

The full project must finish within 90 calendar days of award under an other transaction agreement with milestone payments.

Top catches

Deadline time conflicts
“Response deadline: 2026-12-04T23:59:00-05:00” SAM.gov record

The SAM.gov record says 23:59 -05:00 on 4 December, but the AOI says 17:00 EST on the same day. Send your proposal well before 17:00 EST and ask the Agreements Officer which time governs.

Schedule stages add up to 180 days
“Stage 3 Physical Implementation & Closeout (90 days)” AOI Final OT Bombers.pdf, page 1

Stages of 30, 60, and 90 days total 180 days, but the whole project must finish within 90 days. Ask the Agreements Officer which limit governs before you build your milestone price and schedule.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 2 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design plan and Site-Specific Heritage Hall Plan for the hallway, due within 30 calendar days
  • Four ceiling-suspended scale models (B-52, B-1, B-2, B-21) in UV-resistant, thermally stable materials, with rated hardware and verified head and egress clearance
  • Graphics, decals, heraldry shields, painting, and architectural finishes, with commercial architectural-grade adhesives and edge sealing
  • Deliverables: kickoff meeting in 10 days, material sourcing check in 60 days, installation and closeout report in 90 days
  • On-site installation within 30 calendar days, daily debris and dust cleanup, and work within 0800–1700 duty hours
  • Compliance with OSHA 29 CFR 1910, NFPA 101, Davis-Bacon wage rates, and weekly certified payrolls (WH-347)

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline time conflicts. The SAM.gov record says 23:59 -05:00 on 4 December, but the AOI says 17:00 EST on the same day. Send your proposal well before 17:00 EST and ask the Agreements Officer which time governs.
  • Schedule stages add up to 180 days. Stages of 30, 60, and 90 days total 180 days, but the whole project must finish within 90 days. Ask the Agreements Officer which limit governs before you build your milestone price and schedule.
  • Prior Wright-Patterson work is mandatory. Your proposal must document prior visual-enhancement or space-optimization work at Wright-Patterson AFB. If you lack that record, the notice does not show a path around it, so decide before you spend time on a proposal.“enhancement/space optimization projects at Wright-Patterson AFB, OH (PWS 1.1).” AOI Final OT Bombers.pdf, page 4
  • Prevailing wages and certified payrolls apply. Painting and decorating crews must be paid at least the prevailing rates in wage determination OH20260081, and you must submit weekly certified payrolls. The rate sheet was not available to review, so get it and price labor from it.“all laborers and mechanics shall be paid not less than the prevailing wage rates contained in Department of Labor Wage Determination OH20260081” 2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf, page 3
  • Work capped at obligated funds. You may not perform work beyond the funding obligated on the award, and that amount is not stated. Payment comes only after accepted milestones, within 30 days of acceptance. Ask for the funding amount and milestone schedule before you price.“The Participant is not authorized to perform work that exceeds the available obligated funding.” 2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf, page 2
  • Citizenship and badge checks. All personnel must be U.S. citizens. Unescorted staff need Tier 1 background checks, or you must send escort rosters 48 hours ahead to the AOR, who is not named until award. Start personnel paperwork early.“100% U.S. Citizenship required.” AOI Final OT Bombers.pdf, page 3

Key terms

Who can bidOpen to commercial firms (no set-aside)Mandatory: documented prior visual-enhancement work at Wright-Patterson AFB. Personnel must be 100% U.S. citizens.SAM.gov record
Contract period90 calendar days from effective dateThe effective date is upon final signature. On-site installation may not exceed 30 calendar days.2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf, page 1
How they chooseBest technical capability and fair price, after a down-selectStep 1 proposals are scored on the Section 4.0 criteria. The top-ranked offeror is then invited to negotiate the final order directly.AOI Final OT Bombers.pdf, page 4
How to submitEmail a PDF of no more than 5 pages to AFRL.2808a.inbox@us.af.milSubject line: AOI FA2396-27-9-CTBD – Bombers Directorate Hallway Project – [Company Name].AOI Final OT Bombers.pdf, page 1
Estimated valueAbout $100,000.00 (implied, not a stated ceiling)The AOI says its thresholds reflect a $100,000.00 project. No obligated funding amount is stated.AOI Final OT Bombers.pdf, page 2
Contract typeFirm-fixed-price milestone other transaction agreementThe articles say it is not a procurement contract, so FAR and DFARS generally do not apply unless specifically incorporated.2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf, page 1
Site visitWalkthrough offered; date not statedRSVP and security roster are due at least three business days before the visit. Attendees need valid U.S. government photo ID.AOI Final OT Bombers.pdf, page 4

How to respond

  1. Prepare one PDF of no more than five pages, not counting the title page. Cover the technical and graphic concept, mandatory qualifications, execution and disruption plan, and firm-fixed-price milestone schedule by the three gates.
  2. Email the PDF to AFRL.2808a.inbox@us.af.mil with the subject line 'AOI FA2396-27-9-CTBD – Bombers Directorate Hallway Project – [Company Name]' before 17:00 EST on Friday, 04 December 2026.
  3. If you plan to attend the site walkthrough, email your RSVP and security roster to the same address at least three business days before the visit. Bring valid U.S. government photo ID.
  4. Before award, submit a written CMMC Level 1 self-assessment and attestation to the Agreements Officer. Other required forms or signatures for the proposal: Not stated.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Obligated funding amount or total price ceiling
  • Date and time of the site walkthrough, and the questions deadline
  • Wage rates in OH20260081 and Attachment E, which could not be reviewed
  • Contents of the Performance Work Statement dated 13 Nov 2026 and the diagram file, which could not be reviewed; you must read them on SAM.gov
  • Parent RISE notice FA8652279-RISE, which the AOI says to review, was not provided
  • Name and contact of the Agreements Officer's Representative, who is designated only after award

Notice text

This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria. To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio.

This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures. Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days).

On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy