1. Opportunities
  2. Department of Transportation
  3. Federal Highway Administration
  4. 69056726B000011

Re-pave Riley Creek campground roads, Denali Park, AK

You would re-pave about 2.02 miles of roads in the Riley Creek Campground in Denali National Park, Alaska, including milling, new base and asphalt, drainage work, and pavement striping.

Official title: AK NPS DENA 10(64), Re-pave Riley Creek CG Roads

Deadline
Dec 22, 2:00 PM PT
27 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
$22.5M
Likely Glacier Construction Inc
Place
Fairbanks, AK
Buyer: 690567 Western Federal Lands Div

What they're buying

Work must be completed by 09/26/2027, and the notice gives a price range of $5,000,000 to $10,000,000.

Top catches

Paper bids only, no email
“Electronic bids will not be accepted.” IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 1

Send a printed, signed bid to the address on SF 1442 in Vancouver, WA. Plan delivery so it arrives before 1400 local time on 12/22/2026.

Bid bond required or bid rejected
“Bids received without a valid bid bond will be rejected.” IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 3

Attach an original SF 24 bid bond with the Power of Attorney attached. The bond amount comes from FAR 52.228-1, which was not in the part we reviewed, so confirm the amount before you bid.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 8 of 28 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Mill 15,000 square yards of pavement 2 inches deep, then place 4,500 tons of Type 1 asphalt concrete with 30 tons of prime coat and 15 tons of tack coat.
  • Excavate 6,000 cubic yards and subexcavate 1,500 cubic yards. Place 4,000 cubic yards of roadway aggregate and 850 cubic yards of recycled aggregate base, with 4,500 square yards of geogrid and 21,500 square yards of separation geotextile.
  • Install 190 feet of standard underdrain, adjust 10 manholes, clean 5 culverts, install 12 removable bollards, and add 1,700 feet of fiber roll erosion control.
  • Stripe about 6,360 feet of double yellow centerline, 840 feet of 12-inch white, 1,200 feet of 4-inch white, and 840 feet of 8-inch white, plus 2 sign systems and 1 accessibility symbol.
  • Provide traffic control: 800 flagger hours, 100 traffic control supervisor days, barricades, drums, tubular markers, and warning lights.
  • Provide rental equipment for 40 hours each (dump truck, wheel loader, bulldozer, motor grader, excavator, chain saw), 80 hours of general labor, and a residential housing unit for 6 months.

Who did it before

$22.5M

on the contract that likely holds this work now: Glacier Construction Inc. It ended Nov 9, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Paper bids only, no email. Send a printed, signed bid to the address on SF 1442 in Vancouver, WA. Plan delivery so it arrives before 1400 local time on 12/22/2026.
  • Bid bond required or bid rejected. Attach an original SF 24 bid bond with the Power of Attorney attached. The bond amount comes from FAR 52.228-1, which was not in the part we reviewed, so confirm the amount before you bid.
  • 10% price factor for large business. If you are a large business ($45 million or more in average gross receipts) and a HUBZone small business also bids, 10% is added to your apparent low bid for evaluation. A low large-business bidder must also submit a subcontracting plan before award.“we will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a HUBZone small business” IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 17
  • Tour bus and flagging limits. Coordinate lane closures with the park tour bus schedule and do not hold tour buses more than 30 minutes. Flagging hours are limited, so price the flaggers for those hours only.“Do not delay transit or tour buses for more than 30 minutes.” IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 216
  • Fire water tank truck required. You must keep a tank truck or trailer with at least 300 gallons of water on site during the fire period and close the gap to the work area within 10 minutes round trip. Price the truck, pump and hose the section requires.“The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water during yarding, loading, land clearing, right of way clearing and mechanical treatment of slash.” IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 233
  • Six months of housing to furnish. You must furnish and maintain one housing unit within 15 miles of the project for 6 months, with power, water, sewage, internet and satellite TV. Price the unit, utilities and setup as a pay item.“Furnish and maintain one residential housing units located within 15 miles of the project.” IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 225

Key terms

Who can bidOpen to all; full and open, no set-asideLarge businesses face a possible 10% price factor and a subcontracting plan. See catches.Notice text
Contract periodComplete by 09/26/2027; start within 10 days of notice to proceedThe completion date assumes notice to proceed by 03/01/2027.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 22
How they chooseLowest responsible conforming price, with price-related factors onlyThe government awards without discussions. A 10% factor can apply to a large business low bid.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 48
How to submitPrinted bid to FHWA Western Federal Lands Division, Vancouver, WAElectronic and fax bids are not accepted. Email is used only to modify or withdraw a bid.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 1
Questions dueClose of business five business days before the due dateTechnical questions must be in writing to wfl.plans-spec@dot.gov. Answers are posted on SAM.gov.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 16
Estimated value$5,000,000 to $10,000,000 (price range)The notice gives a price range, not an exact estimate.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 23
Contract typeFirm fixed-priceYou enter unit prices for each bid item, and some items are lump sums.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 49
Site visitViewing encouraged; no government toursSnow may block viewing, so the notice asks bidders to view the site in fall if possible.IFB_69056726B000011_AK NPS DENA 10(64).pdf, page 16

How to respond

  1. Print the bid, complete and sign the SF 1442 and the bid schedule with a unit price and amount for every item, and initial any corrections.
  2. Attach an original SF 24 bid bond with the Power of Attorney, plus an Authority to Sign form for each person who signs the SF 1442 and the bond.
  3. Complete the Representations and Certifications on page B-1, and include your Unique Entity Identifier and CAGE code. Make sure your SAM.gov registration is current.
  4. Mark the envelope with solicitation number 69056726B000011, the project name, and Bid Enclosed in the lower left corner. Deliver it to FHWA Western Federal Lands Division, 610 E Fifth Street, Vancouver, WA 98661 so it arrives before 1400 local time on 12/22/2026.
  5. To modify or withdraw a bid, email WFL.Contracts@dot.gov before the deadline and call 360.619.7520 to confirm receipt. Other changes must be in the printed bid.

Attached files

From SAM.gov. Download links open the original files.

  • IFB_69056726B000011_AK NPS DENA 10(64).pdfThe invitation for bids with the SF 1442, bid schedule, bid bond form, certifications and special contract requirements; you must fill in, sign and return the SF 1442, bid schedule, bid bond and authority forms. Read in part (pages 1–51 and 200–235 of 235).
  • dena10-64_plans-IFB.pdfPlan sheets with the summary of quantities, survey control and drainage tables; read it to price the work, and you do not sign it. Read.
26 more files from a ZIP archive, 6 read
  • dena10-64_BHIM_Nov2022.pdf Not read: over our length limit.
  • dena10-64_control-points.xlsx Not read: over our length limit.
  • dena10-64_existing-ground-surface.xml Could not be read.
  • dena10-64_FLH_Permit_Load_Request.pdfA blank oversize or overweight load permit request; the notice says no government-provided permits exist, so fill it in only for your own heavy-load moves. Read.
  • dena10-64_GEO_GR0325.pdf Not read: over our length limit.
  • dena10-64_GEO_GR0425.pdf Not read: over our length limit.
  • dena10-64_GEO_PM1026.pdf Not read: over our length limit.
  • dena10-64_proposed-alignment_ALI_APPR_Caribou.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_DRWY_Mercantile.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_LOOP_Bear.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_LOOP_Caribou.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_LOOP_Wolf.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_MAIN_Access.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_MAIN_MP1460.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_PARK_USPS.xml Could not be read.
  • dena10-64_proposed-alignment_ALI_PATH_Connector.xml Could not be read.
  • dena10-64_proposed-horizontal-alignment_ALI_APPR_Caribou.pdf Not read: over our length limit.
  • dena10-64_proposed-horizontal-alignment_ALI_DRWY_Mercantile.pdfHorizontal alignment drawing for the Mercantile driveway; read it only, since our text extract is garbled. Read.
  • dena10-64_proposed-horizontal-alignment_ALI_LOOP_Bear.pdf Not read: over our length limit.
  • dena10-64_proposed-horizontal-alignment_ALI_LOOP_Caribou.pdf Not read: over our length limit.
  • dena10-64_proposed-horizontal-alignment_ALI_LOOP_Wolf.pdf Not read: over our length limit.
  • dena10-64_proposed-horizontal-alignment_ALI_MAIN_Access.pdfHorizontal alignment drawing for the main access road; read it only, since our text extract is garbled. Read.
  • dena10-64_proposed-horizontal-alignment_ALI_MAIN_MP1460.pdfHorizontal alignment drawing for the main road at MP 1460; read it only, since our text extract is garbled. Read.
  • dena10-64_proposed-horizontal-alignment_ALI_PARK_USPS.pdfHorizontal alignment drawing for the park and Post Office area; read it only, since our text extract is garbled. Read.
  • dena10-64_proposed-horizontal-alignment_ALI_PATH_Connector.pdf Not read: over our length limit.
  • dena10-64_WEF_Nov2022.pdfA blank Denali National Park wolf encounter report form; the notice does not say contractors must fill it in, so read it for site safety context. Read.

Download the archive from SAM.gov.

Not stated in what we read

  • Number of paper copies of the bid: the copies line on the SF 1442 is blank.
  • Pages 52 to 199 of the solicitation were not provided, including the Division 100 to 150 specifications and the clauses on payment and changes. We could not review them; you must read them on SAM.gov.
  • Geotechnical reports (GEO GR0325, GR0425, PM1026), the BHIM file and the control points spreadsheet were left out for length. We could not review them; you must read them on SAM.gov before you price the work.
  • Several survey and alignment XML files, including the existing ground surface file, could not be read. We could not review them; you must read them on SAM.gov.
  • Whether a pre-bid meeting or mandatory site visit is required: not stated. The notice only encourages viewing the site.
  • Campground and Denali Park Road closure dates during construction: not stated beyond the general coordination rule.

Notice text

Invitation for Bids (IFB) for Construction Project AK NPS DENA 10(64), Re-pave Riley Creek CG Roads The IFB, plans, and physical data are posted under Attachments/Links. Note: This project is being advertised as Full and Open INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Federal Highway Administration for the same kind of work (NAICS 237310, service code Y1LB) in Alaska that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Federal Highway Administration by email

Each morning we'll send the new solicitations and sources-sought notices from Federal Highway Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy