Forest road reconstruction on Robinette Road, Hope, AK
Reconstruction of Robinette Road (1.54 miles) and a 0.31-mile spur near Hope, AK, in the Chugach National Forest.
Official title: Cripple Creek Veg Management Roads Reconstruction
- Deadline
- Dec 4, 5:00 PM PT
- 9 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237310: $45 million in average annual receipts · Who qualifies
- Last time
- $378K
- Likely Island Enterprises Inc
- Place
- Anchorage, AK
- Buyer: USDA-FS, Csa Northwest 7
What they're buying
Work covers clearing, grading, drainage and base aggregate, with an option for 5,300 cubic yards of road surfacing. All work must be finished by 10/31/2027.
Top catches
“how to submit the guarantee with an emailed quote” Amendment 00001 - 1240BJ27Q0009.pdf, page 2
The offer form names a physical office for sealed offers, but the Q&A mentions an emailed quote. Call the contracting officer, Traci Jackson, at 360-939-3840 to confirm how to deliver the offer and guarantee before the deadline.
“Section F is the correct schedule.” Amendment 00001 - 1240BJ27Q0009.pdf, page 2
The offer form says start within 10 days and finish within 310 days of notice to proceed. Section F says start within 14 days and finish by 10/31/2027, and the amendment says Section F governs. Price the Section F dates and ask the contracting officer to confirm the end date, since the continuation sheet estimate reads 10/29/2027.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 6 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Clear and grub 1.54 miles of Robinette Road using the scatter and deck method.
- Excavate 300 cubic yards for the curve realignment and 96 cubic yards of armored dip drainage, and endhaul unsuitable material to disposal sites inside the project area.
- Grade 1.54 miles of Robinette Road and 0.31 miles of the spur road.
- Place 550 cubic yards of 6-inch pitrun for subgrade reinforcement and 100 cubic yards of Grading A subbase for the switchback, using certified weed-free commercial material.
- Option item: place 5,300 cubic yards of road surfacing, 4,300 cubic yards on Robinette Road and 1,000 on the spur.
- Seed and mulch all disturbed areas, provide temporary traffic control, and mobilize (lump sum items).
Who did it before
$378K
on the contract that likely holds this work now: Island Enterprises Inc. It ended Feb 27, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Submission method is unclear. The offer form names a physical office for sealed offers, but the Q&A mentions an emailed quote. Call the contracting officer, Traci Jackson, at 360-939-3840 to confirm how to deliver the offer and guarantee before the deadline.
- Two different performance schedules. The offer form says start within 10 days and finish within 310 days of notice to proceed. Section F says start within 14 days and finish by 10/31/2027, and the amendment says Section F governs. Price the Section F dates and ask the contracting officer to confirm the end date, since the continuation sheet estimate reads 10/29/2027.
- Spur grading may be base or option. The schedule lists 0.31 miles of spur grading under option items, but the amendment says it is in the base items. Ask the contracting officer which is correct before you set your base price.“The 0.31 miles of grading is in the Base Items for the spur.” Amendment 00001 - 1240BJ27Q0009.pdf, page 2
- Bid guarantee and bonds required. An offer guarantee is required, but its amount and accepted forms are not stated in the provided text. You must also furnish performance and payment bonds within 14 calendar days after award, so check your bonding capacity before you submit.“the required bid guarantee amount, acceptable forms” Amendment 00001 - 1240BJ27Q0009.pdf, page 2
- No clearing May 1 to July 15. You may not clear, skid, haul trees or burn during the migratory bird breeding season, May 1 through July 15. This period likely overlaps much of your work window, so plan clearing for other months and price any delay.“Contractor shall refrain from any vegetation clearing, site preparation,” Amendment 00001 - 1240BJ27Q0009.pdf, page 3
- Limitations on subcontracting apply. This is a small business set-aside, and the limitations on subcontracting clause is included. Most of the work must be done by your own workforce, and the required percentage is not stated, so confirm it before you plan subcontracted work.“52.219-14 Limitations on Subcontracting (Nov 2025)” 1240BJ27Q0009.pdf, page 9
Key terms
| Who can bid | Small businesses only (total small business set-aside)The size standard for NAICS 237310 is not stated in the provided text.SAM.gov record |
|---|---|
| Contract period | Start within 14 calendar days of notice to proceed; finish by 10/31/2027Amendment 0001 says this Section F schedule governs over the offer form's 10 and 310 days.1240BJ27Q0009.pdf, page 6 |
| How they choose | Based on the value of the proposalAmendment 0001 says options will be exercised only when funded. Other evaluation rules are not stated.Amendment 00001 - 1240BJ27Q0009.pdf, page 2 |
| How to submit | Sealed offer delivered to Chugach NF Supervisor's Office, Anchorage; emailed quote method unclearThe offer form asks for the original and 1 copy. The amendment Q&A mentions an emailed quote, but no email address appears in the provided text.1240BJ27Q0009.pdf, page 1 |
| Questions due | Closed 11/20/2026Answers were posted in Amendment 0001 on 11/23/2026.Notice text |
| Contract type | Unit-price construction contract, paid on measured workQuantities marked with an asterisk are contract quantities. The others are paid on actual quantities.1240BJ27Q0009.pdf, page 5 |
How to respond
- Sign Amendment 0001 (SF 30), attach the signed copy to your package, and list amendment 0001 dated 11/23/2026 in item 19 of the offer form.
- Fill in unit prices and totals for every base item and the option items on the offer form (SF 1442), then complete and sign items 20a to 20c.
- Include the bid guarantee. Its amount and accepted form are not stated in the provided text, so confirm them with the contracting officer first.
- Deliver the original and 1 copy to USDA Forest Service, Chugach NF Supervisor's Office, 161 East 1st Avenue, Door 8, Anchorage, AK 99501. An emailed quote is mentioned, but the email address is not stated.
- Mark the envelope with your name and address, solicitation number 1240BJ27Q0009, and the due date and time, and make sure it arrives by 5:00 p.m. Pacific Time on December 4, 2026.
Attached files
From SAM.gov. Download links open the original files.
- 1240BJ27Q0009.pdfThe solicitation with the offer form, schedule of items, statement of work and clauses. You must fill in unit prices, sign the offer form and return it. Read in part.
- Amendment 00001 - 1240BJ27Q0009.pdfAmendment 0001 posts the answers to questions and changes how the schedule reads. You must sign it and attach it to your offer. Read in part.
- Attachment 2 Project Specifications CC FSSS.pdfForest Service supplemental specifications for clearing, excavation, grading and drainage. You only need to read it for methods and tolerances; no form to sign. Only part was provided. Read in part.
- Attachment 4 Wage Determinations.pdfWage rate tables for workers on this job. The text we received is garbled, so we could not review it. You must read it yourself. Read in part.
- Attachment 3 Project Drawings CC Plans Full Set.pdfPlan sheets with the summary of estimated quantities and the worklist. You need them for pricing; no form to sign. Only part was provided. Read in part.
- Attachment 1 Project Specifications List.pdfIndex of the project specifications that apply. You only need to read it; no form to sign. Part of it was provided. Read in part.
Not stated in what we read
- Estimated contract value in dollars is not stated.
- The size standard for NAICS 237310 and whether your company qualifies under it are not stated.
- The bid guarantee amount and accepted forms are not stated; the Q&A confirmed the question without figures.
- Whether and when the option road surfacing will be funded is not stated beyond the phrase 'if/when we obtain funding'.
- The percentage of work you must perform yourself under the subcontracting limit is not stated.
- The wage rates in Attachment 4 could not be reviewed; you must read that file yourself.
Notice text
Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT Amendment POSTED 11/23/2026 with Q&A
As published on SAM.gov.
Contacts
- Traci Jackson, Traci.jackson@usda.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Forest Service for the same kind of work (NAICS 237310, service code Z2LB) in Alaska that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| The Project Consists of Constructing a New Trailhead Parking Lot and Watershed Improvements on the Tongass National Forest.Island Enterprises Inc · 1240BJ23F0029 | $377,688 | Feb 27, 2026ended | AK |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 4, 5:00 PM PT9 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237310, highway, street, and bridge construction, soonest deadline first.
- Departmental OfficesWaterman canal gate for Wheeler refuge, Decatur, AL
- Department of the ArmyRoads, parking and grounds renovation, Detroit, MI
- Departmental OfficesRoad and bridge repair at national parks nationwide
- Department of the NavyService road realignment and roundabout, Camp Lejeune, NC
- Federal Highway AdministrationThree bridges and road rebuild in Arches National Park, UT
- Federal Highway AdministrationThree bridges and a culvert on SR 35, Mimbres, NM
- Forest ServiceRoad and trailhead upkeep, Little Missouri Grassland, ND
- Department of the Air ForceTaxiway repairs at North Auxiliary Airfield, SC
Free · at most one email a morning
Get new notices from Forest Service by email
Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy