1. Opportunities
  2. Department of Veterans Affairs
  3. 36C25727Q0089

Switchgear and transformer testing at Temple and Waco, TX

You would maintain, calibrate, inspect and test switchgear, breakers and transformers, and sample transformer oil at two VA medical centers in Temple and Waco, TX.

Official title: CTX VAMC Maintenance, Calibration, Inspection, and Testing of the Electrical Power Distribution System

Deadline
Jan 13, 2027, 10:00 AM CT
49 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Temple, TX
Buyer: 257-Network Contract Office 17 (36C257)

What they're buying

The contract runs 180 calendar days after receipt of order, with a possible extension of up to 6 months.

Top catches

Sign subcontracting certificate with offer
“The formal certification must be completed, signed and returned with the offeror” 36C25727Q0089.pdf, page 25

You must fill in, sign and return the limitations on subcontracting certificate with your offer, or it is ineligible. By signing, you commit to pay no more than 50% of the service amount to firms that are not VIP-listed SDVOSBs.

Email-only, two-volume submission
“All proposals are due NLT Wednesday, January 13, 2027, at 10:00 AM CST via e-mail only to shawn.reinhart@va.gov.” 36C25727Q0089.pdf, page 28

Send both volumes by email to shawn.reinhart@va.gov, titled with the solicitation number and Proposal Submission. Late emails are not considered for award, and the notice does not say how the VA confirms receipt.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Maintenance, calibration, inspection and functional testing of switchgear, breakers and transformers at Temple and Waco (equipment lists in Attachments A and B).
  • Dissolved gas analysis and dielectric strength testing of transformer oil samples.
  • Ground resistance measurements at listed transformers and building switchboard cabinets, with corrective recommendations where values exceed NFPA 70 limits.
  • Torque of reinstalled conductors and labeling of each tested breaker and switchgear unit.
  • Provide 20 lead-acid replacement batteries and 20 trip coils at Temple and 20 at Waco.
  • Reports: four hard copies and one electronic PDF to the COR within 7 calendar days of testing at each location.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Sign subcontracting certificate with offer. You must fill in, sign and return the limitations on subcontracting certificate with your offer, or it is ineligible. By signing, you commit to pay no more than 50% of the service amount to firms that are not VIP-listed SDVOSBs.
  • Email-only, two-volume submission. Send both volumes by email to shawn.reinhart@va.gov, titled with the solicitation number and Proposal Submission. Late emails are not considered for award, and the notice does not say how the VA confirms receipt.
  • Senior engineer hours conflict. The price line shows 100 units, but the description caps the work at 10 hours total. Ask the contracting officer which is right before you price it, because the not-to-exceed amount is set only at award.“Senior Engineer - Report Preparation NTE 10 hours total over 10 days.” 36C25727Q0089.pdf, page 4
  • Waco transformer count does not match. The Waco heading says 30 transformers, but the Attachment B quantities add up to well over 30 and list breaker sizes. Ask for the exact count and locations, which the notice says the COR will give later.“Waco VAMC Transformers (Total 30 – 12.5KV/480V transformer)” 36C25727Q0089.pdf, page 18
  • Labor rates are not wage determinations. The labor rate table is for information only, and the wage determinations are only listed by reference. Pull the current Bell and McLennan County wage determinations from SAM.gov and price labor from them.“This Statement is for Information Only: It is not a Wage Determination” 36C25727Q0089.pdf, page 21

Key terms

Who can bidVIP-listed service-disabled veteran-owned small businesses only100% set-aside. Size standard shown as $12.5 Million.36C25727Q0089.pdf, page 23
Contract period180 calendar days after receipt of orderGovernment may extend services, but the total extension may not exceed 6 months.36C25727Q0089.pdf, page 1
How they chooseBest value, not lowest priceThe Government may choose a higher-priced offer if its technical advantages justify the difference.36C25727Q0089.pdf, page 33
How to submitEmail to shawn.reinhart@va.gov in two PDF volumesVolume I is the full offer. Volume II is a redacted technical approach. Technical approach is limited to 25 pages.36C25727Q0089.pdf, page 28
Questions dueWednesday, December 16, 2026, 10:00 am CSTEmail shawn.reinhart@va.gov with the title Solicitation Number, Questions.36C25727Q0089.pdf, page 28
Contract typeFirm-fixed-price commercial services under FAR Part 12Single award. Prices are all-inclusive firm fixed unit prices per line item.36C25727Q0089.pdf
Site visitNot mandatory. Waco on Dec 7, 2026 and Temple on Dec 11, 2026, both at 0900Contact the listed point of contact for each location before the visit.36C25727Q0089.pdf, page 28

How to respond

  1. Confirm your VIP listing and your SBA Small Business Search status under your UEI.
  2. Complete SF 1449 blocks 12, 17a, 30a, 30b, 30c and Section B.1.a, the B.2 price schedule, and every fill-in clause, including the subcontracting certificate.
  3. Build Volume I as one PDF in this order: signed SF 1449, Section B.1, B.2 pricing, signed fill-in clauses, technical approach (25 pages maximum), and two to three past performance examples. Do not include the PWS.
  4. Create Volume II as a fully redacted copy of the technical approach, with the required cover label and permanent black redactions.
  5. Email both volumes to shawn.reinhart@va.gov by Wednesday, January 13, 2027, 10:00 AM CST, with the solicitation number and Proposal Submission in the subject line.

Attached files

From SAM.gov. Download links open the original files.

  • 36C25727Q0089.pdfThe full solicitation with the statement of work, price schedule, clauses and submission rules; you must complete and sign the SF 1449 blocks, Section B.1, the B.2 price schedule and the fill-in clauses, and read the rest. Read.

Not stated in what we read

  • Estimated value or budget for the contract.
  • Exact Waco equipment locations and counts, which the notice says the COR will provide later.
  • Not-to-exceed amounts for the senior engineer and engineer admin lines, which the Government will enter at award.
  • Name of the current contractor or any incumbent.
  • Whether any option years exist beyond the possible extension of up to 6 months.
  • Whether past performance must fall within 3 years or 5 years, since the notice gives both.

Notice text

Maintenance, calibration, inspection, testing, grounding resistance measurement, dissolved gas analysis (DGA), labeling, and reporting for the Electrical Power Distribution Systems and components at the Central Texas Veterans Health Care System (CTVHCS) in Temple, TX and Waco, TX.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy