Central utility plant operations, Boulder, CO
NIST is buying around-the-clock operation and preventive maintenance of the Central Utility Plant in Boulder, CO, plus preventive maintenance at the Fort Collins, CO and Kekaha, HI field sites, with repairs bought on separate time-and-materials lines.
Official title: CUP Preventative Maintenance and Repair, NIST, Boulder, CO
- Deadline
- Dec 9, 3:00 PM MT
- 14 days left
- Who can bid
- Small businesses
- Size standard for NAICS 811310: $12.5 million in average annual receipts · Who qualifies
- Last time
- $13.8M
- Likely Peak Facility Solutions LLC
- Place
- Boulder, CO
- Buyer: Dept of Commerce NIST
What they're buying
The notice is a draft, the response deadline is Wednesday, December 9, 2026 at 15:00 (-07:00), and the contract length is not stated.
Top catches
“This is a draft solicitation. The actual solicitation will be posted shortly.” Notice text
The documents are drafts and the final solicitation is not posted yet. Ask questions on the draft now, then price and write your bid from the final version only.
“We also anticipate providing a reasonable question and answer period after the solicitation is released.” Notice text
The response date is Wednesday, December 9, 2026 at 15:00 (-07:00), but the final solicitation and its question period are not out yet. Plan for less time to price the work, and ask the contracting officer in writing whether the date will move. Likely, not stated outright.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 40 of 75 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Run the Central Utility Plant in Building 42, Boulder, 24/7/365, supplying steam, chilled water and laboratory-grade compressed air to Buildings 1, 2, 3, 24 and 81.
- Preventive maintenance on 416 assets at all three sites, about 1,083.25 work orders per year after nesting.
- Preventive maintenance at WWV/WWVB Fort Collins, CO (67 assets) and WWVH Kekaha, HI (48 assets).
- Daily rounds of mechanical rooms, daily logs, daily meter readings, and a monthly report by the 5th business day.
- Boiler water chemistry testing, a boiler inspection between July 1 and August 31, and annual boiler tuning.
- Monthly steam trap blowdowns and annual trap testing, plus a 15-minute response to after-hours alarms at Boulder.
Who did it before
$13.8M
on the contract that likely holds this work now: Peak Facility Solutions LLC. It ends Feb 24, 2027.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Draft solicitation, not final. The documents are drafts and the final solicitation is not posted yet. Ask questions on the draft now, then price and write your bid from the final version only.
- Deadline set before final solicitation. The response date is Wednesday, December 9, 2026 at 15:00 (-07:00), but the final solicitation and its question period are not out yet. Plan for less time to price the work, and ask the contracting officer in writing whether the date will move.
- Stationary engineer certificate conflict. Section 2.1.4 allows 180 days to get the Denver certificate, but section 3 requires a valid certificate for each shift supervisor and 3.1.5 requires a current one on duty at all times. Confirm that every engineer you name already holds the certificate before you bid.“It is required that one person per shift shall serve as the shift supervisor and shall possess a valid Stationary Engineers Certificate from the City and County of Denver” 01 CUP PWS 11-05-2026.xlsx
- Badging paperwork due 45 days early. Badging paperwork is due 45 days before the contract effective date, but the site rules allow 30 days after notice to proceed, so the two dates conflict. Badges can take weeks to months, so confirm the date with the contracting officer before award.“Contractor shall submit required badging paperwork for employees to NIST 45 days prior to effective date of the contract or any personnel changes during the life of the contract.” 01 CUP PWS 11-05-2026.xlsx
- Factory-certified technicians only. Chillers, air compressors and air dryers can be serviced only by factory-certified Carrier or Ingersoll Rand technicians. The air compressor job plan is subcontracted through Ingersoll Rand, so price that labor and confirm you can get it.“NIST is requiring all maintenance performed on these units be performed only by factory certified Carrier and Ingersoll Rand technicians.” 01 CUP PWS 11-05-2026.xlsx
Key terms
| Who can bid | Small businesses only (total set-aside)NAICS 811310. The size standard is not in the text provided.SAM.gov record |
|---|---|
| Contract type | Firm-fixed price plus time-and-materials repair linesPerformance-based service contract. Repairs outside maintenance are billed on separate time-and-materials lines.Notice text |
How to respond
- Watch SAM.gov for the final solicitation and build your bid from it, not from this draft.
- Send questions on the draft to the primary point of contact, with a copy to the alternate. Their names and addresses are not stated in the text provided.
- Submit your response by Wednesday, December 9, 2026 at 15:00 (-07:00). How to submit is not stated, so confirm the method in the final solicitation.
- Include a staffing plan and a draft safety plan with your initial proposal, as PWS sections 1.2 and 2.4.1 require.
- Price the 24/7 staffing, the factory-certified technician work and the 30-day transition overlap before you decide to bid.
Attached files
From SAM.gov. Download links open the original files.
- 1333ND27R0001 DRAFT CUP 19NOV2026.pdf Not read: over our length limit.
- 04 Safety Plan Checklist.pdf Not read: over our length limit.
- 06 WAGE DETERMINATION.pdfPlaceholder wage determination with no usable rates; you must confirm the real rates yourself. Read in part.
- 01 CUP PWS 11-05-2026.xlsxMain performance work statement covering scope, staffing and response rules; you must read and price it. Read in part.
- 05 Boulder General Contractor Requirements Rev D.pdfGeneral site rules for contractors at NIST Boulder covering hours, badging and permits; you must follow them. Read in part.
70 more files from ZIP archives, 37 read
- Job Plans/JP-AC-4Y.docx Not read: over our length limit.
- Job Plans/JP-AC-A.docxAnnual job plan for air compressors, subcontracted through Ingersoll Rand; read it to price the work. Read in part.
- Job Plans/JP-AC-Q.docx Not read: over our length limit.
- Job Plans/JP-ACCU-Q.docxQuarterly job plan for air-cooled condensing units; read it to price the work. Read in part.
- Job Plans/JP-ACCU-S.docxSemi-annual job plan for air-cooled condensing units; read it to price the work. Read in part.
- Job Plans/JP-AHU-M.docxMonthly job plan for air handling units; read it to price the work. Read in part.
- Job Plans/JP-AHU-Q.docx Not read: over our length limit.
- Job Plans/JP-AHU-S.docxSemi-annual job plan for air handling units, including the monthly and quarterly tasks. Read in part.
- Job Plans/JP-BLR-A.docx Not read: over our length limit.
- Job Plans/JP-BLR-M.docxMonthly job plan for boilers; read it to price the work. Read in part.
- Job Plans/JP-BLR-S.docx Not read: over our length limit.
- Job Plans/JP-CCH-A.docxAnnual job plan for chillers; a certified Carrier technician is required. Read in part.
- Job Plans/JP-CCH-Q.docxQuarterly job plan for chillers; a certified Carrier technician is required. Read in part.
- Job Plans/JP-CCH-S.docxSemi-annual job plan for chillers; a certified Carrier technician is required. Read in part.
- Job Plans/JP-CRAC-Q.docx Not read: over our length limit.
- Job Plans/JP-CT-A.docxAnnual job plan for cooling towers; read it to price the work. Read in part.
- Job Plans/JP-CT-M.docxMonthly job plan for cooling towers; read it to price the work. Read in part.
- Job Plans/JP-CT-Q.docxQuarterly job plan for cooling towers; read it to price the work. Read in part.
- Job Plans/JP-CTS-M.docx Not read: over our length limit.
- Job Plans/JP-DA-A.docx Not read: over our length limit.
- Job Plans/JP-DOOR-A.docxAnnual job plan for 11 exterior and 9 interior doors at the Hawaii site. Read in part.
- Job Plans/JP-DRY-Q.docx Not read: over our length limit.
- Job Plans/JP-EF-A.docx Not read: over our length limit.
- Job Plans/JP-EF-M.docxMonthly job plan for exhaust fans; read it to price the work. Read in part.
- Job Plans/JP-EF-S.docx Not read: over our length limit.
- Job Plans/JP-EMG-A.docx Not read: over our length limit.
- Job Plans/JP-EMG-M.docx Not read: over our length limit.
- Job Plans/JP-ERV-Q.docxQuarterly job plan for rooftop energy recovery units; read it to price the work. Read in part.
- Job Plans/JP-ERV-S.docxSemi-annual job plan for rooftop energy recovery units; read it to price the work. Read in part.
- Job Plans/JP-EVU-Q.docx Not read: over our length limit.
- Job Plans/JP-FCU-A.docxAnnual job plan for fan coil units; read it to price the work. Read in part.
- Job Plans/JP-FCU-Q.docxQuarterly job plan for fan coil units; read it to price the work. Read in part.
- Job Plans/JP-FCU-S.docxSemi-annual job plan for fan coil units; read it to price the work. Read in part.
- Job Plans/JP-HX-A.docx Not read: over our length limit.
- Job Plans/JP-IH-S.docxSemi-annual job plan for intake hoods; read it to price the work. Read in part.
- Job Plans/JP-Lakos-A.docx Not read: over our length limit.
- Job Plans/JP-Legionella-A.docx Not read: over our length limit.
- Job Plans/JP-LIGHT-S.docx Not read: over our length limit.
- Job Plans/JP-MAU-A.docx Not read: over our length limit.
- Job Plans/JP-MAU-Q.docxQuarterly job plan for make-up air units; read it to price the work. Read in part.
- Job Plans/JP-MAU-S.docxSemi-annual job plan for make-up air units; read it to price the work. Read in part.
- Job Plans/JP-PAC-Q.docx Not read: over our length limit.
- Job Plans/JP-PAC-S.docx Not read: over our length limit.
- Job Plans/JP-PMP-A.docxAnnual job plan for pumps; read it to price the work. Read in part.
- Job Plans/JP-PMP-S.docxSemi-annual job plan for pumps; read it to price the work. Read in part.
- Job Plans/JP-RD-A.docx Not read: over our length limit.
- Job Plans/JP-RO-A.docxAnnual job plan for the reverse osmosis system at the Hawaii site. Read in part.
- Job Plans/JP-RUD-A.docx Not read: over our length limit.
- Job Plans/JP-SEPTIC-4Y.docx Not read: over our length limit.
- Job Plans/JP-SOLAR-A.docx Not read: over our length limit.
- Job Plans/JP-SOLAR-S.docxSemi-annual job plan for the solar array at the Hawaii site. Read in part.
- Job Plans/JP-STEAM-A.docx Not read: over our length limit.
- Job Plans/JP-TS-5Y.docx Not read: over our length limit.
- Job Plans/JP-TS-A.docx Not read: over our length limit.
- Job Plans/JP-UH-A.docx Not read: over our length limit.
- Job Plans/JP-VALVE-A.docx Not read: over our length limit.
- Job Plans/JP-VFD-A.docx Not read: over our length limit.
- Job Plans/JP-WAC-Q.docx Not read: over our length limit.
- Job Plans/JP-WH-A.docx Not read: over our length limit.
- Job Plans/JP-WS-M.docxMonthly job plan for water softeners; read it to price the work. Read in part.
- PWS Attachments/Attachment 1 CUP_Contract_Asset_PM_List.xlsxAsset and preventive maintenance list that sets the work to price; you must price from it. Read in part.
- PWS Attachments/Attachment 12 Lighting Summary WWVh Field Site Kekaha, HI.xlsxLighting fixture summary for Kekaha; only part was provided, so you must read the full file. Read in part.
- PWS Attachments/Attachment 2 CUP Monthly Report 6-10-2025.xlsxBlank monthly report template that the contractor must complete and submit. Read in part.
- PWS Attachments/Attachment 3 Mechanical Rooms.xlsxList of mechanical rooms for rounds; only part was provided, so you must read the full list. Read in part.
- PWS Attachments/Attachment 5 CUP Daily Report Logs.xlsxBlank daily log sheets that the contractor must fill in each shift. Read in part.
- PWS Attachments/Attachment CUP Heat Exchanger Information.pdfHeat exchanger asset information; only the opening lines were provided, so you must read the full file. Read in part.
- PWS Attachments/CUP Daily Report Logs.xlsxSame daily log template as Attachment 5; the contractor must fill it in each shift. Read in part.
- PWS Attachments/CUP Monthly Report 6-10-2025.xlsxBlank monthly report template that the contractor must complete and submit. Read in part.
- PWS Attachments/PWS Attach 13 - Transition Requirements.pdfRules for the 30-day handover between contractors; you must follow them if awarded. Read in part.
- PWS Attachments/PWS Attachment 11 Emergency Generator Information.docxList of emergency generators; only part was provided, so you must read the full file. Read in part.
Not stated in what we read
- Estimated contract value or budget.
- Length of the base period, start date, and number of option years.
- Award basis, such as lowest price or best value, and how proposals are scored.
- How and where to submit, and the name and contact details of the point of contact.
- Who holds the contract now and whether the current contractor is competing.
- Actual wage rates. The wage determination in the file is a placeholder and only mentions a collective bargaining agreement for the current contract.
Notice text
ALL DOCUMENTS ARE IN DRAFT STATUS!!!!!!! Notice: This is a draft solicitation. The actual solicitation will be posted shortly. In the meantime, please submit questions relating to the draft solicitation to the primary point of contact listed below, with a copy to the alternative point of contact. This will help us identify potential improvements to the solicitation which we anticipate having very few substantive changes when compared to the draft solicitation.
We also anticipate providing a reasonable question and answer period after the solicitation is released. Thank you! This procurement is for preventative maintenance and repair of Central Utility Plant (CUP) on the NIST Boulder, CO Campus, WWV/WWVB Fort Collins, CO campus, and WWV/WWVH Kekaha, HI: This is a Performance Based Service Contract for the services identified in this Performance Work Statement (PWS). The contract will have Firm-Fixed Price (FFP) line items for the following tasks: 24/7/365 Operation and Maintenance Services at the Central Utility Plant (CUP) in Boulder, CO. Preventative and Scheduled Maintenance at the WWV/WWVB Field Site in Ft. Collins, CO. Preventative and Scheduled Maintenance at the WWV/WWVH Field Site in Kekaha, HI.
As published on SAM.gov.
Contacts
- Shawn Borisow, shawn.borisow@nist.gov
- Julie Morris, julie.morris@nist.gov, 3034976504
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at National Institute of Standards and Technology for the same kind of work (NAICS 811310, service code Z1JZ) in Colorado that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Operations, Maintenance and Repair Services of the Central Utility Plant NIST BoulderPeak Facility Solutions LLC · 1333ND21CNB190017 | $13,767,361 | Feb 24, 2027in 2 months | CO |
| FMD Commercial and Industrial Machinery and Equipment Maintenance, Inspection and Repair Services at the NIST Boulder Campus.Atmr, Inc · 1333ND22PNB190441 | $302,564 | Sep 30, 2027in 10 months | CO |
| OU19-FY26-084-New Generator and Ats Preventative Maintenance, NIST, Boulder, CoAtmr, Inc · 1333ND26CNB190026 | $149,194 | Sep 30, 2027in 10 months | CO |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 3:00 PM MT14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 811310, commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance, soonest deadline first.
- US Coast GuardReplace crane turntable bolts at Cape May, NJ
- Department of the ArmyHalon fire bottle testing at Jacksonville Air Guard, FL
- Department of the NavyFlow meter verification at Pearl Harbor shipyard, HI
- Department of the Air ForceReplace gate valve frame at Flag Lake, Barksdale AFB, LA
- Department of the ArmyMaterial handling and industrial equipment repair
- Department of the Air ForceRepair of Sciaky spot welder at Tinker AFB, OK
- Department of the NavyFire extinguisher hydrostatic testing at Iwakuni, Japan
- Department of the ArmyDiesel rotary UPS maintenance at USAG Humphreys
Free · at most one email a morning
Get new notices from National Institute of Standards and Technology by email
Each morning we'll send the new solicitations and sources-sought notices from National Institute of Standards and Technology, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy