Building 129 lunch and locker room rebuild, McAlester, OK
The Army wants written capability statements from firms that can design and build a modernized Building 129, the lunch and locker room facility at McAlester Army Ammunition Plant in Oklahoma.
Official title: Design and Construction of a Modernized Facility (Building 129 Lunch and Locker Room Facility) at McAlester Army Ammunition Plant (MCAAP)
- Deadline
- Nov 23, 12:00 PM CT
- 2 days left
- Who can respond
- Any business
- Market research, not a bid
- Last time
- $8.85M
- Likely Southwind Construction Services, LLC
- Place
- Mcalester, OK
- Buyer: W6QK ACC-RI
What they're buying
This is a sources sought notice, not a bid: it gathers information for a later request for solutions, and the contract vehicle may be an other transaction agreement.
Top catches
“New Response Date: 30 November 2026, 10:00 AM CDT” Notice text
Amendment 0003 moves the response date to 30 November 2026, 10:00 AM CDT. The SAM.gov record and the Q&A still show Monday, 23 November 2026 at 12:00 PM, with a -06:00 offset. Confirm the date with the contracting officer and plan to meet the earlier date until then.
“Additional information regarding SSN can be found in attachments” Notice text
The Statement of Work, the site visit requirements in Attachment 0004 and the corrected Sources Sought Notice are scanned images and could not be reviewed here. You must open and read them before you respond.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 4 of 7 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish the east wing of existing Building 129, including foundations, with backfill to grade (base scope).
- Build a two-story pre-engineered metal building with foundations, finished interiors and utility systems (base scope).
- Option 1: renovate the existing ground floor and central block, including finished interiors and utility systems.
- Option 2: demolish the west wing and build a one-story pre-engineered metal building instead.
- Site work where walls are removed: compacted low volume change structural backfill and soil retaining walls.
- The existing building is about 24,310 square feet inside. The drawings are marked concept development, so quantities may change.
Who did it before
$8.85M
on the contract that likely holds this work now: Southwind Construction Services, LLC. It ends Jan 11, 2027.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Two different deadlines. Amendment 0003 moves the response date to 30 November 2026, 10:00 AM CDT. The SAM.gov record and the Q&A still show Monday, 23 November 2026 at 12:00 PM, with a -06:00 offset. Confirm the date with the contracting officer and plan to meet the earlier date until then.
- Key attachments could not be read. The Statement of Work, the site visit requirements in Attachment 0004 and the corrected Sources Sought Notice are scanned images and could not be reviewed here. You must open and read them before you respond.
- Site visit needs advance details. If you attend the 9 December site visit, send each attendee's name, email, phone, company, reason, visit date, foreign national status and nationality at least 72 hours ahead. Bring Real ID compliant identification.“please respond to the ACC-RI specialist with the following information at least 72 hours prior to the intended site visit” Attachment 0004.1 - Site Visit Requirements.pdf, page 1
- Deal type may change. The Government may use an other transaction agreement instead of a standard contract, and the approach could change. Terms, payment and rules may differ from what you expect, so ask for the terms before you price.“The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA)” Notice text
- Options change the price. The drawings are marked concept development. They show a base scope plus Option 1, which keeps the central block, and Option 2, which builds a one-story building after demolishing the west wing. Ask which options you must price.“OPTION 2: ONE-STORY PRE-ENGINEERED METAL BUILDING STRUCTURE AND” Attachment 0003 - Project_Designs.pdf, page 2
Key terms
| Who can bid | Open to many types of firms; no set-aside statedSet-aside is listed as Not stated. The size standard for NAICS 236220 is not in the text provided.Notice text |
|---|---|
| How they choose | Based on capabilities shown in the follow-on requestThis notice is a market survey. Identify your capabilities in writing.Notice text |
| How to submit | Email the PDF to Jessica Parr and Christina Joniak by the deadlineJessica Parr: jessica.m.parr2.civ@army.mil. Christina Joniak: christina.l.joniak2.civ@army.mil.Amendment 0005 - Government Responses to Industry Questions.pdf, page 2 |
| Contract type | Possibly an other transaction agreement (OTA), not a standard contractThe Government says the approach may change. A follow-on request for solutions is planned.Notice text |
| Site visit | Wednesday, 9 December 2026, requested 0900 to 1100Whether attendance is mandatory is not stated. You must send attendee details at least 72 hours ahead.Amendment 0005 - Government Responses to Industry Questions.pdf, page 1 |
How to respond
- Confirm the due date with the contracting officer first. The notice shows 30 November 2026, 10:00 AM CDT in Amendment 0003 and 23 November 2026, 12:00 PM in the SAM.gov record.
- Prepare a PDF with a cover sheet, an intent to bid and a capabilities quad chart. Use Arial 12 (tables, diagrams and charts may use Calibri 10). Keep Sections 1 and 2 at 8.5 x 11 inches. The quad chart may be up to 8.5 x 14 legal size, not 11 x 17.
- Email the PDF to Jessica Parr at jessica.m.parr2.civ@army.mil and Christina Joniak at christina.l.joniak2.civ@army.mil by the deadline. Subject line and file size limit: Not stated.
- If you plan to attend the site visit on 9 December 2026, email each attendee's details to the same contacts at least 72 hours before the visit. Bring Real ID compliant identification.
- Read the Statement of Work and the other scanned files that could not be reviewed here before you submit.
Attached files
- Attachment 0004.2 - MF190-20 MCAAP.pdfWe could not review this file. The text we extracted is only a PDF viewer message, so you must open the file yourself and read it. Read.
- Attachment 0003 - Project_Designs.pdfConcept drawings for the Building 129 renovation, including the base scope and two options. You read it for scope and size; you do not fill it in. Read.
- Attachment 0004 - Site Visit Requirements.pdf Scanned image, not read.
- Amendment 0005 - Government Responses to Industry Questions.pdfGovernment answers to industry questions dated 20 November 2026. It confirms the submission contents, the site visit date and where to send documents. You read it; you do not fill it in. Read.
- Sources Sought Notice (SSN)_Corrected.pdf Scanned image, not read.
- Attachment 0002 - Statement of Work.pdf Scanned image, not read.
- Attachment 0004.1 - Site Visit Requirements.pdfInstructions for visitors to McAlester Army Ammunition Plant, including the attendee details you must send and the ID rules. If you attend, you must fill in the gate pass form it mentions; that form is not in the file list. This is a read and act document, not one to sign here. Read.
Not stated in what we read
- Which deadline controls: 30 November 2026, 10:00 AM CDT in Amendment 0003, or 23 November 2026 in the SAM.gov record and Q&A.
- Estimated value or budget for the project.
- Period of performance and construction schedule.
- Set-aside status and size standard for NAICS 236220.
- Contents of the Statement of Work, the scanned site visit requirements and the corrected Sources Sought Notice, which could not be read here.
- Whether the site visit is mandatory and whether any pre-bid meeting or question deadline applies.
Notice text
AMENDMENT 0003 Amendment 0003 hereby issues against Sources Sought Notice W519TC-27-R-B129. Changes: Response Date: From original language: Original Response Date: 23 November 2026, 12:00 PM CDT To revised language: New Response Date: 30 November 2026, 10:00 AM CDT Submission Structure and Format: From original language: Responses shall be submitted in PDF format with a minimum acceptable font size of 12 Arial (tables, diagrams, and charts may use 10 Calibri). Submissions shall be structured into the distinct sections outlined below. To revised language: Responses shall be submitted in PDF format with a minimum acceptable font size of 12 Arial (tables, diagrams and charts may use 10 Calibri) Submissions shall be structured into the distinct sections outlined below. Section 1 and 2 page size not to exceed 8.5x11 standard. Capabilities Quad Chart not to exceed standard legal size 8.5x14. Industry Question & Answers Attachment 0005 - Government Responses to Industry Questions is added as an attachment / document to answer industry questions. All terms and conditions remain unchanged. ****************************************************************************************************************************************************** AMENDMENT 0002 Amendment 0002 hereby issued against Sources Sought Notice W519TC-27-R-B129. Changes: From Original language: Submission Instructions, Delivery: Responses shall be submitted electronically via e-mail to the POCs listed below no later than 12:00 PM CDT on the 5th calendar day following official publication. To Revised language: Submission Instructions, Delivery: Responses shall be submitted electronically via e-mail to the POCs listed below no later than 12:00 PM CDT on 23 NOVEMBER 2026 the 5th business day following official publication. All terms and conditions remain unchanged. ****************************************************************************************************************************************************** AMENDMENT 0001 Amendment 0001 is hereby issued against Sources Sought Notice W519TC-27-R-B129.Changes: From Original language: Description: The Army Contracting Command–Rock Island (ACC-RI), on behalf of the Project Lead Joint Services (PL JS) and the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of Defense physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on Request for Solutions (RFS) that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) to satisfy this requirement. This authority allows the Department of Defense to carry out repair and construction projects for facilities outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The Government's intent is to award the proposed transaction(s) based on the capabilities demonstrated in response to the follow-on RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, non-traditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of Defense. To Revised Language: Description: The Army Contracting Command–Rock Island (ACC-RI), on behalf of the Project Lead Joint Services (PL JS) and the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of War physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on solicitation, request for solutions, request for quote that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants, 10 U.S.C § 4022 Authority of the Department of Defense to carry out certain prototype projects, and Federal Acquisition Regulation (FAR) 12, Acquisition of Commercial Products and Services to satisfy this requirement. The Other Transaction authorities allow the Department of War to carry out repair and construction projects for facilities, prototype projects outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The U.S Government is seeking input from interested parties related to the strategy considerations. Please provide input under separate cover to the points of contact listed below. Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants Stand-Alone Other Transaction Agreement (OTA) 10 U.S.C. § 4022 Authority of the Department of Defense to carry out certain prototype projects Federal Acquisition Regulation (FAR) 12, Acquisition of Commercial Products and Services The Government's intent is to award the proposed transaction(s) based on the capabilities demonstrated in response to the follow-on RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, non-traditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of War. All terms and conditions remain unchanged. ****************************************************************************************************************************************************** DESCRIPTION: The Army Contracting Command-Rock Island (ACC-RI), on behalf of the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of Defense physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on Request for Solutions (RFS) that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) to satisfy this requirement. This authority allows the Department of Defense to carry out repair and construction projects for facilities outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The United States Governement's (Government) intends to award the proposed transaction(s) based on the capabilities demonstrated in response to the RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, nontraditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of Defense. ATTACHMENTS Additional information regarding SSN can be found in attachments
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Jessica Parr, jessica.m.parr2.civ@army.mil
- Christina Joniak, christina.l.joniak2.civ@army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Army for the same kind of work (NAICS 236220, service code Z2JZ) in Oklahoma that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Repair Roofs at Fort Sill, Ok. Group 2 Roofs Include B0500, 1603, 1712 and 1718.Southwind Construction Services, LLC · W912BV24F0319 | $8,851,468 | Jan 11, 2027in 1 month | OK |
| Fort Sill Roof Repairs (B912, B1605, & B1606), Fort Sill, Oklahoma. Roofs Are Clay Tile With a Portion of B912 Being a Flat Roof.Trumble Construction LLC · W912BV24F0390 | $4,133,049 | Sep 19, 2026ended | OK |
| OK001, JOC Repair HVAC, Fire, LightingPatriot Strategies, LLC · W911SA26FA055 | $214,411 | Jan 30, 2027in 2 months | OK |
| Building 6050 Repair - Water and Parapet Damage at Fort Sill, Oklahoma.Tatitlek Universal Services Inc · W912BV25C0019 | $1,270,595 | Aug 26, 2026ended | OK |
| Please See Section As Follows: Section 00 00 00 Procurement and Contracting Requirementsgeneral Amplification of RequirementsFederal Constructors, Inc. · W50S8T25CA011 | $9,547,882 | Jun 1, 2027in 6 months | OK |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 23, 12:00 PM CT2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of the NavyBoat maintenance facility, Buliluyan, Palawan, Philippines
- Department of the ArmyGIS lab for Maun, Botswana
- Department of Veterans AffairsBathroom renovation in Building 103, Danville, IL
- Departmental OfficesMN-FWS Tamarac VC Parking Seal Coat
- Departmental OfficesDeck handrail and stair replacement, Fergus Falls, MN
- Public Buildings ServiceUSCG ISA Tenant Improvement Construction Project
- Department of Veterans AffairsProject 629-25-104 ED Suicide Risk Mitigation Fence
- Department of Veterans AffairsReplace dental vacuum piping at VA, North Las Vegas, NV
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy