Replace dental vacuum piping at VA, North Las Vegas, NV

You would replace the dental vacuum piping and related systems at the VA Southern Nevada Healthcare System in North Las Vegas, NV, in about 180 calendar days.

Official title: Z1DZ--Replace Dental Vacuum Piping

Deadline
Nov 23, 12:00 PM PT
2 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Las Vegas, NV
Buyer: 261-Network Contract Office 21 (36C261)

What they're buying

It is a price-only, firm-fixed quote open only to certified SDVOSB firms.

Top catches

Deadline time zone is unclear
“by12:00 PM PDT on November 23, 2026” Notice text

The notice says 12:00 PM PDT, the record says -08:00 and Amendment 0003 says 12:00 PST. Treat 11:00 AM Pacific as your cutoff, since 12:00 PM PDT is earlier than 12:00 PM PST.

Use only the newest RFQ
“Quotes submitted with outdated documents will not be considered.” S06 Amendment 36C26127Q0072 0004 11-18-26.pdf, page 2

Quotes on outdated documents will not be considered, and all amendments must be acknowledged. Amendment 0002 warns that missing acknowledgment may lead to rejection. Use RFQ revised 11-18-2026 only and list amendments 0001 to 0004 on the offer form.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 15 of 22 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Demolish and remove the existing dental vacuum piping and existing pumps. VA says the existing system will be demolished in its entirety.
  • Furnish and install a complete new dental vacuum system: six vacuum pumps, two 80-gallon separator tanks and new controls, per sheet P-001.
  • Route new piping from the basement pumps through the first floor (Pulmonary Suite and Eye Clinic) to the second-floor dental suite and the rooftop exhaust.
  • Keep the dental suite running by closing one bay at a time, following the phasing plans. Interruptions must be after 6 pm and back in service by 6 am.
  • Connect and program the new system with the existing building automation system (BAS), then provide third-party verification and recertification of the system and all connected outlets.
  • Firestopping, closing unused roof penetrations with 2-hour firestop, and roof restoration. Asbestos abatement only if asbestos is found.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline time zone is unclear. The notice says 12:00 PM PDT, the record says -08:00 and Amendment 0003 says 12:00 PST. Treat 11:00 AM Pacific as your cutoff, since 12:00 PM PDT is earlier than 12:00 PM PST.
  • Use only the newest RFQ. Quotes on outdated documents will not be considered, and all amendments must be acknowledged. Amendment 0002 warns that missing acknowledgment may lead to rejection. Use RFQ revised 11-18-2026 only and list amendments 0001 to 0004 on the offer form.
  • SDVOSB status must be verified. A quote is rejected if your SDVOSB status cannot be verified at submission and before award. Check your VetCert listing now. The limits on subcontracting clause (52.219-14) is listed, but its terms are not in the text we received.“Quotes will only be accepted from certified SDVOSB contractors” Notice text
  • Two wage determinations in play. The RFQ names the July 29, 2026 wage determination. Amendment 0003 gives an updated one dated November 5, 2026, and neither was readable in our text. Get both and price labor only after you know which one governs.“Applicable Wage Determination: NV20260091 dated July 29,2026 is applicable for this solicitation and resulting award.” Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026.pdf, page 1
  • 45-day Pulmonary Suite hard deadline. Pulmonary Suite work must finish in a strict 45-day window. VA says liquidated damages of $1,715 per day apply if it slips. The window starts when VA turns the first Pulmonary phase over to you, so plan crews, inspections and any weekend approvals to fit it.“All work in this suite must be completed within a strict 45-day window” Attachment - SOW revised 10-08-26 36C26127Q0072.pdf, page 4
  • Base quote includes new pumps. Although the title says piping, the base quote also covers a full new vacuum system: six pumps, two 80-gallon separator tanks, new controls and building automation system (BAS) integration with the existing Johnson Controls equipment. Price the equipment and the Johnson Controls work, not only pipe.“The base bid shall include a complete new dental vacuum system, including six (6) vacuum pumps, two (2) 80-gallon separator tanks, and new controls, as scheduled on Sheet P-001.” S06 VA Response to RFIs Solicitation No. 36C26127Q0072 final.pdf, page 1

Key terms

Who can bidCertified SDVOSB firms onlyMust be verified in VetCert and registered in SAM.GOV at submission and before award.Notice text
Contract period180 calendar days from Notice to ProceedThe SOW says this includes pre-construction, testing, inspections and commissioning.Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026.pdf, page 1
How they chooseLowest price, awarded without discussionsPrice only. The Contracting Officer may hold discussions only if they later find them necessary.Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026.pdf, page 1
How to submitEmail only to David Rovner, copy Charee HarrisUse RFQ revised 11-18-2026 and acknowledge all amendments.Notice text
Questions dueClosed: 12:00 PM PDT on November 02, 2026Questions can no longer be submitted. VA answers are in the RFI response file.Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026.pdf, page 1
Estimated valueMagnitude between $1,000,000 and $5,000,000This is a size band only. No estimate or budget is stated.Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026.pdf, page 1
Contract typeFirm-fixed price constructionYour price must cover all supervision, labor, materials, equipment, overhead and profit.Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026.pdf, page 1
Site visitPre-quote visit held Oct 26, 2026; no second visitOther site visits are only by appointment with the COR.S06 VA Response to RFIs Solicitation No. 36C26127Q0072 final.pdf, page 4

How to respond

  1. Before you quote, confirm you are a certified SDVOSB in VetCert and registered in SAM.GOV with a current Online Representations and Certifications record.
  2. Fill in the Quote Pricing Breakdown with labor, material, overhead, profit, bonds and insurance. Show subcontractor pricing and third-party inspections as separate line items.
  3. Complete the offer side of SF 1442 using RFQ revised 11-18-2026. Item 17 must allow at least 60 calendar days, and you must list amendments 0001 to 0004 and sign.
  4. Email the quote to David.rovner@va.gov with a copy to charee.harris@va.gov by 12:00 PM PDT on Monday, November 23, 2026. Send it before 11:00 AM Pacific. File format and size limits: Not stated.
  5. If you win, email the payment and performance bonds and certificate of insurance within 10 calendar days of award. Only emailed bonds are accepted.

Attached files

Not stated in what we read

  • The government budget or estimate for the job. Only a size band of $1 million to $5 million is stated.
  • The final wage rates. The wage determinations were not readable in the text we received.
  • Whether a bid guarantee is required. The check box for it is unclear in the text we received.
  • How the $1,715 per day liquidated damages rate applies to the full 180-day completion date. Our text cuts off before this.
  • The drawings, stamped drawings and SOW Appendices C to E, which we could not read. Review them before you price.
  • Limits on email file size and format for the quote. Not stated.

Notice text

This is a Combined Synopsis/Solicitationfor a construction requirement to ReplaceDental Vacuum Piping for the VA Las VegasMedical Center (SNVAHCS) located in NorthLas Vegas, NV. Quotes shall be submittedonly by email to David Rovner, ContractSpecialist at email: David.rovner@va.govand cc d to Charee Harris, ContractingOfficer at email Charee.Harris@va.gov , by12:00 PM PDT on November 23, 2026.Quoters are advised to pay special atten-tion to the sub mission instructions specified in FAR 52.212-1 Instructions to OfferorsCommercial Products and CommercialServices. Quoters are advised to pay specialattention to the sub mission instructionsspecified in Instructions to Quoters 36C26127Q0072. This requirement is a total set-aside for eligible SDVOSB contractorsand will be solicited as a price only procurement. Quotes will only be accepted from certified SDVOSB contractors who are registered in SAM.GOV and SBA's VETCERT at the time the offer is submitted and prior to award. The applicable North American Industry Classification System (NAICS) Code is 236220 Commercial and Institutional Building Construction, and the small busi-ess size standard is $45 Million. IAW FAR36.204, the magnitude of the project is be-tween $1,000,000.00 and $5,000,000. 00.The duration of this project is approxi-mately 180 calendar days from the Notice to Proceed (NTP). **Any quotes received from quoters not mentioned above will not be accepted.** Potential Quoters must beregistered in the System for AwardManagement (SAM) to be eligible for anaward (See Internet Sitehttps://www.sam.gov/portal/public/SAM/).Potential Quoters must also have a current Online Representations and Certification Application on file with SAM. See www.Sam.gov , Solicitation No.36C26127Q0072 if interested. Amendment 0001 was posted to SAM.gov on 10-28-2026. Amendment 0002 was posted to SAM.gov on 11-10-2026. Amendment 0003 was posted to SAM.gov on 11-16-2026. Amendment 0004 was posted to SAM.gov on 11-18-2026 with Solicitation RFQ 36C26127Q0072_1 revised 11-18-2026. RFQ due date has been extended to 11-23-2026 by 12:00 PM PT.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy