Material handling equipment maintenance, Anchorage, AK
The Defense Logistics Agency (DLA) Disposition Services in Anchorage, Alaska wants preventive and corrective maintenance for 12 pieces of material handling equipment, including forklifts and front-end loaders.
Official title: DLA DS_ANCHORAGE MHE MAINTENANCE SERVICES
- Deadline
- Dec 11, 3:00 PM ET
- 16 days left
- Last time
- $128K
- Likely Mobile Techs LLC
- Place
- Anchorage, AK
- Buyer: DLA Disposition Services - Ebs
What they're buying
The contract is one 12-month base period plus two 12-month options.
Top catches
“Prior to removal of any MHE from USG premises, the Contractor shall sign DoW Form 1149, transferring liability of the equipment to the Contractor for the duration of the maintenance.” Att 1. PWS Anchorage MHE_R1.pdf, page 7
Once you sign DoW Form 1149, you carry liability for the machine while it is off base. Plan for transport costs and the risk of damage, and ask the contracting officer what coverage is expected.
“This requirement is a Firm-Fixed-Price IDIQ time-and-materials contract.” Notice text
The notice calls this firm-fixed-price, then calls it time-and-materials. The price schedule also mixes unit prices for parts with hourly labor. Ask the contracting officer how each line will be priced and paid before you fill in your prices.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 6 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- One preventive maintenance service on each of 12 machines, including a fork inspection to ANSI/ITSDF standard.
- Limited technical inspection, fluid checks, lube, and load tests to original equipment manufacturer (OEM) specifications. Battery and charger checks on electric units.
- Corrective repairs: assessment within 7 business days, written estimate within 5 business days, and repair within 7 business days after approval and parts arrival.
- OEM replacement parts only, with no markup and no rebuilt parts. Price 80 unscheduled labor hours per period.
- Written PM sheet within 5 business days, a sticker on each machine, and a weekly corrective maintenance status email to the contracting officer's representative (COR).
- Spill cleanup at no cost to the government, reported immediately, with a written report within 24 hours. Hazardous waste goes in approved containers.
Who did it before
$128K
on the contract that likely holds this work now: Mobile Techs LLC. It ends May 31, 2027.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Equipment leaves site under your liability. Once you sign DoW Form 1149, you carry liability for the machine while it is off base. Plan for transport costs and the risk of damage, and ask the contracting officer what coverage is expected.
- Contract type is stated two ways. The notice calls this firm-fixed-price, then calls it time-and-materials. The price schedule also mixes unit prices for parts with hourly labor. Ask the contracting officer how each line will be priced and paid before you fill in your prices.
- References must send their own surveys. DLA will not contact your references, and a reference survey not received by the closing date is not considered. Ask each reference now to email its survey to june.lee@dla.mil with SP4510-27-Q-1005 in the subject line.“The offeror is responsible for ensuring references submit past performance surveys; the US Government will not be contacting references for purposes of obtaining the survey.” Att 1. PWS Anchorage MHE_R1.pdf, page 15
- Past performance outweighs price. DLA weighs past performance well above price, and price is not scored numerically. A firm with no past performance is given a Neutral rating, so weak or missing references can lose the award even at a low price.“Past performance is significantly more important than price.” Att 1. PWS Anchorage MHE_R1.pdf, page 17
- Holiday rules differ between documents. The wage determination requires at least twelve paid holidays, including Good Friday and Washington's Birthday. The PWS lists 11 holidays when service is not required and omits those two. Price paid holidays under the wage determination and ask which list applies.“A minimum of twelve paid holidays per year” Att 6. WD_Anchorage MHE.pdf, page 6
- Deadline is stated in EST. The notice gives the deadline in EST, but the work site is in Alaska. Send your quote early and confirm the time zone with the contact so a late email does not miss the cut-off.“All quotes and additional required documentation are to be received no later than 03:00 PM (EST), Dec 11, 2026.” Notice text
Key terms
| Who can bid | Open to all businesses. No set-aside.The notice states a small business size standard of $12.5million for NAICS 811310.Notice text |
|---|---|
| Contract period | One 12-month base period plus two 12-month optionsTotal period of performance, including options, may not exceed three years.Notice text |
| How they choose | Best value. Past performance is significantly more important than price.Price is evaluated but not scored numerically.Att 1. PWS Anchorage MHE_R1.pdf, page 17 |
| How to submit | Email to june.lee@dla.mil in two volumesVolume 1: certifications and price schedule. Volume 2: past performance.Notice text |
| Questions due | Friday, Nov 27, 2026, 3:00 PM ESTQuestions by email only. Answers are posted as an SAM.gov amendment.Notice text |
| Contract type | Firm-fixed-price IDIQ time-and-materialsThe notice also calls it firm-fixed-price (FFP). See the catches.Notice text |
How to respond
- Email one electronic copy of your quote to june.lee@dla.mil by Friday, Dec 11, 2026, 3:00 PM EST. The notice does not state a file size limit or a subject line for the quote.
- Volume 1: your FAR 52.212-1(b) information except (b)(10), plus the completed Price Schedule (Attachment 2). Volume 2: your past performance, listing up to four references from the last 6 years with the fields in section 1.4(b).
- Ask each reference to email its completed Attachment 4 survey to june.lee@dla.mil with SP4510-27-Q-1005 in the subject heading before the closing date. If you have no past performance, say so in Volume 2.
- Send any questions by email to june.lee@dla.mil by Friday, Nov 27, 2026, 3:00 PM EST. Answers are posted as an SAM.gov amendment. Questions received after that are answered only with firms that have submitted a quote.
Attached files
From SAM.gov. Download links open the original files.
- Att 4. Past Performance Questionaire_Anchorage MHE.docThe past performance survey. You complete Part I and give it to each reference, who completes Part II and sends it to DLA directly. Your references must sign and return it. Read.
- Att 3. Equipment List_Anchorage MHE.xlsxThe list of 12 machines with make, model, year, meter reading, and annual hours. Read it to size your preventive maintenance and check your skills. You do not sign it. Read.
- Att 2. Price Schedule_Anchorage MHE.xlsxThe price schedule with the CLINs for each period. You must fill in your prices and return it with Volume 1. Parts are prefilled at a price of 1 per unit. Read.
- Att 1. PWS Anchorage MHE_R1.pdfThe performance work statement that sets the maintenance duties, service levels, and proposal instructions. Read it in full. You do not sign it. Read.
- Att 6. WD_Anchorage MHE.pdfThe Service Contract Act wage determination for Anchorage and Matanuska-Susitna counties. Read it and price the listed wages, fringe benefits, and holidays. You do not sign it. Read.
- Att 5. DLA DS Anchorage Location.xlsxThe site address for the Anchorage location. Read it only. Read.
Not stated in what we read
- Estimated total value of the contract. The notice caps the maximum at 150% of an estimated value that it does not give.
- Whether a site visit or pre-bid meeting is required.
- Which wage determination classification applies to your mechanics and technicians.
- Whether wage increases can be passed on in the option years. Clause 52.222-43 is listed, but the notice does not say how it works.
- Whether the warehouse sweeper line (CLIN 0006) covers the floor scrubber on the equipment list.
- When payment is due after an invoice is submitted through WAWF.
Notice text
DLA Disposition Services - Anchorage, Material Handling Equipment (MHE) Maintenance and Repair This is a combined synopsis/solicitation for commercial items/services prepared in accordance with FAR 12, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. The solicitation number is SP4510-27-Q-1005 and is being issued as a request for quotation (RFQ). The required equipment is per the attached specifications, including its delivery timeframes.
This procurement is designated as full and open competition (unrestricted) under NAICS 811310 with a small business size standard of $12.5million in support of DLA Disposition Services in Alaska. The Government intends to award a Firm-Fixed-Price (FFP) contract consisting of one (1) 12-month base period and two (2) 12-month option periods. The total period of performance, including all options, shall not exceed three (3) years. This requirement is a Firm-Fixed-Price IDIQ time-and-materials contract.
Pricing must be Fixed Price & Time and Materials Price for the entirety of services quoted. All questions related to this acquisition shall be submitted via email to june.lee@dla.mil and are to be received no later than 03:00 PM (EST), Nov 27, 2026. All questions will not be answered via telephone. Answers will be submitted to SAM.gov as an amendment to the solicitation. All questions that occur after the cut-off, but are considered to be significant to the requirement, will be accepted and discussed only with those vendors that have submitted a quote.
Quotes shall be submitted via email to june.lee@dla.mil. All quotes and additional required documentation are to be received no later than 03:00 PM (EST), Dec 11, 2026. See Attachment for the Price Schedule and Specifications/Additional Terms. All contractor performance shall be in a safe manner, and in compliance with all applicable Federal, state, and local laws and regulations, and all installation policies. Any/all required documentation and service-related requirements including installation access are the responsibility of the contractor, with coordination as necessary with the site POC. Deliveries must be made during normal installation work hours which are available from the above POC, excluding Federal holidays.
Notes: Addendum to 52.212-2 Evaluation – Commercial Items and FAR 52.212-01 Fill-in coverage listed at the end of the PWS. Any award made off this solicitation will be published on www.sam.gov. Offers are advised to frequently check www.sam.gov for any modifications to the solicitation and for the system award notice. Unsuccessful offerors will not be notified separately of their unsuccessful proposals. The following contract provisions and clauses apply to this acquisition 252.201-7000 Contracting Officer's Representative Dec-91 252.203-7000 Requirements Relating to Compensation of Former DoD Officials Sep-11 252.203-7002 Requirement to Inform Employees of Whistleblower Rights Dec-22 252.203-7005 Representation Relating to Compensation of Former DoD Officials Sep-22 252.204-7004 Antiterrorism Awareness Training for Contractors Jan-23 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls Oct-16 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013, Rev 1) May-24 252.204-7016 Covered Defense Telecommunications Equipment or Services--Representation Dec-19 252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services--Representation May-21 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services Jan-23 252.204-7022 Expediting Contract Closeout May-21 252.204-7024 Notice on the use of the Supplier Performance Risk System Mar-23 252.211-7003 Item Unique Identification and Valuation Jan-23 252.223-7008 Prohibition of Hexavalent Chromium Jan-23 252.225-7000 Buy American--Balance of Payments Program Certificate--Basic Feb-24 252.225-7001 Buy American and Balance of Payments Program--Basic Feb-24 252.225-7012 Preference for Certain Domestic Commodities Apr-22 252.225-7048 Export-Controlled Items Jun-13 252.225-7055 Representation Regarding Business Operations with the Maduro Regime May-22 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime Jan-23 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region–Representation Jun-23 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region Jun-23 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports Dec-18 252.232-7006 Wide Area WorkFlow Payment Instructions Jan-23 252.232-7010 Levies on Contract Payments Dec-06 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel Jan-23 252.243-7002 Requests for Equitable Adjustment Dec-22 252.246-7008 Sources of Electronic Parts Jan-23 252.244-7999 Subcontracts for Commercial Products or Commercial Services (DEVIATION 2026-O0015) Jan-25 252.246-7003 Notification of Potential Safety Issues Jan-2023 252.246-7008 Sources of Electronic Parts Jan-2023 252.247-7023 Transportation of Supplies by Sea--Basic Oct-24 52.203-6 Restrictions on Subcontractor Sales to the Government--Alternate I Nov-21 52.203-3 Gratuities Apr-84 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions Sep-24 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements Jan-17 52.204-7 System for Award Management Nov-24 52.204-9 Personal Identity Verification of Contractor Personnel Jan-11 52.204-13 System for Award Management Maintenance Oct-18 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment Jan-25 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations Nov-15 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment Jan-25 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services Sep-23 52.212-2 Evaluation—Commercial Products and Commercial Services Nov-21 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services--Alternate I Nov-21 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services--Alternate I Nov-21 52.216-18 Ordering Aug-20 52.216-19 Order Limitations Oct-95 52.216-22 Indefinite Quantity Oct-95 52.216-31 T&M/LH Proposal Requirements—Commercial Acquisition Nov-21 52.217-8 Option to Extend Services Nov-99 52.217-9 Option to Extend the Term of the Contract Mar-00 52.219-14 Limitations on Subcontracting (DEVIATION 2021-O0008) Sep-21 52.219-28 Post-Award Small Business Program Representation Jan-25 52.222-3 Convict Labor Jun-03 52.222-35 Equal Opportunity for Veterans Jun-20 52.222-36 Equal Opportunity for Workers with Disabilities Jun-20 52.222-37 Employment Reports on Veterans Jun-20 52.222-41 Service Contract Labor Standards Aug-18 52.222-42 Statement of Equivalent Rates for Federal Hires May-14 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts) Aug-18 52.222-50 Combating Trafficking in Persons Oct-25 52.222-54 Employment Eligibility Verification Jan-25 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 Jan-22 52.222-62 Paid Sick Leave Under Executive Order 13706 Jan-22 52.222-90 Addressing DEI Discrimination by Federal Contractors Apr-26 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons May-24 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners May-24 52.223-23 Sustainable Products and Services (DEVIATION) Mar-25 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving May-24 52.232-33 Payment by Electronic Funds Transfer—System for Award Management Oct-18 52.232-40 Providing Accelerated Payments to Small Business Subcontractors Mar-23 52.233-3 Protest after Award Aug-96 52.233-4 Applicable Law for Breach of Contract Claim Oct-04 52.240-90 Security Prohibitions and Exclusions Representations and Certifications Dec-25 52.240-91 Security Prohibitions and Exclusions Dec-25 52.240-93 Basic Safeguarding of Covered Contractor Information Systems Dec-25 52.244-6 Subcontracts for Commercial Products and Commercial Services Oct-25 5452.233-9001 Disputes – agreement to use alternative dispute resolution Jun-20 C02 Manufacturing phase-out or discontinuation of production, diminishing sources, and obsolete materials or components Dec-16 C03 Contractor retention of supply chain traceability documentation Sep-16 L06 Agency Protests Dec-16 L09 Reverse Auction Oct-16 H14 Contractor Personnel Security Requirements Dec-21 H16 Operations Security (OPSEC) For On-site Contractors Dec-21
As published on SAM.gov.
Contacts
- June Lee, june.lee@dla.mil, 4457374996
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Defense Logistics Agency for the same kind of work (NAICS 811310, service code J039) in Alaska that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| FDR WEST_0427 FY26 AnchorageMobile Techs LLC · SP451026F0072 | $128,250 | May 31, 2027in 6 months | AK |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 11, 3:00 PM ET16 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 811310, commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance, soonest deadline first.
- US Coast GuardReplace crane turntable bolts at Cape May, NJ
- Department of the ArmyHalon fire bottle testing at Jacksonville Air Guard, FL
- Department of the NavyFlow meter verification at Pearl Harbor shipyard, HI
- Department of the Air ForceReplace gate valve frame at Flag Lake, Barksdale AFB, LA
- Department of the ArmyMaterial handling and industrial equipment repair
- Department of the Air ForceRepair of Sciaky spot welder at Tinker AFB, OK
- Department of the NavyFire extinguisher hydrostatic testing at Iwakuni, Japan
- Department of the ArmyDiesel rotary UPS maintenance at USAG Humphreys
Free · at most one email a morning
Get new notices from Defense Logistics Agency by email
Each morning we'll send the new solicitations and sources-sought notices from Defense Logistics Agency, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy