1. Opportunities
  2. Department of Veterans Affairs
  3. 36C24127Q0030

UPS replacement and maintenance at Manchester VA, NH

The Manchester VA Medical Center wants a contractor to replace its end-of-life Eaton Powerware 80 kVA UPS with an Eaton UPS and extended battery cabinet, then provide preventive maintenance, standby and emergency labor, parts, and training for a base year plus four option years.

Official title: J061--Eaton Powerware System Replacement

Deadline
Nov 30, 5:00 PM ET
5 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Manchester, NH
Buyer: 241-Network Contract Office 01 (36C241)

What they're buying

Only verified Service-Disabled Veteran-Owned Small Businesses may bid.

Top catches

Due date conflicts across documents
“Submit quotations via email to Shawn.Lawrence@va.gov no later than November 26, 2026 at 5:00 PM EST.” 36C24127Q0030.docx

The base solicitation file says quotes are due November 26, 2026, which is tomorrow. The SAM.gov record and the later versions say November 30, 2026. Email the contract specialist today to confirm the date, and aim to submit by the earlier date.

Subcontracting cap for SDVOSB
“The concern will not pay more than 50% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.” 36C24127Q0030.docx

You may not pay more than half of the government's payments to subcontractors that are not similarly situated. Sign and return the VAAR 852.219-75 certificate with your quote, or the government will not evaluate or award.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 4 of 12 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Preventive maintenance and inspections of the UPS and batteries, 4 times a year (quarterly and annual), with a written monthly schedule to the COR.
  • Standby labor for large electrical shutdowns, 48 hours a year, staffed within two weeks of notice.
  • Emergency labor, 32 hours a year, with on-site response within 4 hours.
  • Non-routine parts and materials, carried at a government not-to-exceed amount of $2,500 a year.
  • Replace the existing 80 kVA Eaton Powerware UPS in kind with an Eaton UPS and extended battery cabinet, plus start-up, in the base year.
  • Annual training on daily maintenance inspections, including a basic Eaton course.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Due date conflicts across documents. The base solicitation file says quotes are due November 26, 2026, which is tomorrow. The SAM.gov record and the later versions say November 30, 2026. Email the contract specialist today to confirm the date, and aim to submit by the earlier date.
  • Subcontracting cap for SDVOSB. You may not pay more than half of the government's payments to subcontractors that are not similarly situated. Sign and return the VAAR 852.219-75 certificate with your quote, or the government will not evaluate or award.
  • Eaton-certified technicians required. The VA says PM technicians must be factory-certified or Eaton-authorized, except for minor work such as filter changes. If your staff are not Eaton-certified, you must subcontract that work, and it counts toward the 50% cap.“Due to the complex nature of the product and criticality - Yes” 36C24127Q0030_3.docx
  • Replacement size conflicts: 60 or 80 kVA. The SOW specifies a 60 kVA replacement, but the Q&A says the existing unit is 80 kVA and should be replaced in kind. Ask the contract specialist to confirm the rating before you price the UPS.“Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design.” 36C24127Q0030_3.docx
  • Labor rates set by unread wage file. The Service Contract Labor Standards apply, so the wage determination sets your labor costs. We could not read that attachment, so you must read it before you price the labor lines.“This is a recurring service contract exceeding $2,500 performed in the United States; the Service Contract Labor Standards (SCLS/SCA) apply.” 36C24127Q0030.docx
  • Parts limit conflicts with SOW. The price sheet sets parts at $2,500 a year not-to-exceed, but the SOW allows $500 per item per visit. Price the line at $2,500 as the note directs, and ask which limit governs.“The Contractor shall supply parts and materials ($500 per equipment item per visit) as needed for upgrades, replacement, and repairs.” 36C24127Q0030.docx

Key terms

Who can bidService-Disabled Veteran-Owned Small Businesses onlySize standard for NAICS 811310 is $12.5 million, per the notice. You must be a verified SDVOSB.36C24127Q0030.docx
Contract periodBase year January 4, 2027 to January 3, 2028, plus four 12-month option yearsOption years are exercised only if the government chooses to exercise them.36C24127Q0030.docx
How they chooseMost advantageous to the government, price and other factors consideredPrice is the total of all line items, including option years. The relative weight of other factors is not stated.36C24127Q0030.docx
How to submitEmail to Shawn.Lawrence@va.govThe signed VAAR 852.219-75 certificate must be returned with the quote.
Questions dueNovember 19, 2026, 5:00 PM EST (passed)Questions were due by email to the contract specialist. This date has passed.
Contract typeCommercial services, request for quotation (RFQ)Quotes are requested. No written solicitation document will be issued.36C24127Q0030.docx
Site visitMonday, November 16, 2026, 9:00 AM EST (passed)Attendance was optional. The notice of intent to attend was due November 12, 2026. Both dates have passed.36C24127Q0030.docx

How to respond

  1. Before November 26, 2026, email Shawn.Lawrence@va.gov to confirm the due date, since the documents disagree.
  2. Send your quote by email to Shawn.Lawrence@va.gov by the confirmed time, 5:00 PM EST. File format and size limit: Not stated.
  3. Include the solicitation number, your company name, address, phone and UEI, and your statement on the contract terms in 52.212-4. Include the signed VAAR 852.219-75 certificate.
  4. Include qualification and certification details for your staff and any subcontractors, including the Eaton-authorized partner.
  5. Fill in unit and extended prices for the base year and option years 1 to 4. Carry the $2,500 parts line as shown, and hold your prices for 60 calendar days.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value of the contract: Not stated, and the price lines are blank.
  • Relative weight of the evaluation factors: the clause refers to a Section 7 that is not in the text.
  • Whether a maintenance bypass sidecar must be supplied with the UPS. The Q&A does not say.
  • Whether start-up is priced separately. The start-up scope is in Attachment A, which we could not read.
  • Personnel vetting requirements: Attachment D is referenced but was not provided.
  • Several scanned files were not readable, including the wage determination, Attachment A, manuals, drawings and the UPS guide specification. You must read them yourself before pricing.

Notice text

36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton? Due to the complex nature of the product and criticality - Yes Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance? See answer to RFI 1 Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures?

Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician. Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton? Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician. Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications?

The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model. Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)? Yes, See photos. Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5?

The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance. What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA. Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design. What are the existing input voltage and output voltage? Current system: Eaton Powerware 9390-80 Model 80 AC IN: 208VAC 3W 60Hz 3Phase 240A AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA DC: 384-480Vdc 204A Please provide a photo of the existing unit's data plate.

See attached photos Please provide photos of the full system (standing back) and of the battery cabinet and batteries. See attached photos Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP. Confirmed What is the current battery run time, and what run time is required for the replacement? 60 minutes would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System attached Will the VA be paying invoices on a Net-30/45/60 schedule? The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy