1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. FA460826QS053

Gate valve frame replacement, Flag Lake, Barksdale AFB, LA

The Air Force wants two rusted vertical frame pieces and one horizontal brace replaced on the Flag Lake gate valve at Barksdale AFB, Louisiana, over a 90-day period.

Official title: Gate Valve Frame Replacement

Deadline
Dec 14, 1:00 PM CT
18 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Barksdale AFB, LA
Buyer: FA4608 2 Cons LGC

What they're buying

The government supplies the new frame parts, and you supply labor, tools, removal, reinstallation, the operational check, cleanup and off-base disposal.

Top catches

Deadline conflicts; may be tomorrow
“by 1:00 PM Central Daylight Time (CDT), Friday, 27 Nov 2026” Combined Synopsis Solicitation - FA4608QS053.pdf, page 1

The SAM record gives Monday, 14 Dec 2026 at 1:00 PM (-06:00), but the RFQ gives 1:00 PM CDT on Friday, 27 Nov 2026, which is tomorrow. Call the contract specialist now to confirm the date and time before you spend time on a quote.

Quote by email only
“Quotes must be submitted via email to the Contract Specialist and Contracting Officer listed below by” Combined Synopsis Solicitation - FA4608QS053.pdf, page 1

The notice accepts quotes only by email to two named people, and the RFQ makes following up on receipt your responsibility. Send your quote early, confirm it was received, and keep proof of sending.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 3 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove the electric motor-driven actuator and the top headrail, then unbolt the frame from the concrete headwall.
  • Drill bolt holes to attach the retained headrail to the new vertical pieces, then reattach the frame and actuator per the gate manufacturer's specifications.
  • Install the two vertical frame pieces and one horizontal brace that the government furnishes, with the hardware it provides.
  • Haul away the three removed pieces of corroded steel angle iron and all demolished material for lawful off-base disposal.
  • Run a joint operational check with the Government point of contact: full open to full close without binding, and a proper seal at closure.
  • Leave the site, shoreline and access paths in equal or better condition than at the start, with tools, staging and debris removed.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline conflicts; may be tomorrow. The SAM record gives Monday, 14 Dec 2026 at 1:00 PM (-06:00), but the RFQ gives 1:00 PM CDT on Friday, 27 Nov 2026, which is tomorrow. Call the contract specialist now to confirm the date and time before you spend time on a quote.
  • Quote by email only. The notice accepts quotes only by email to two named people, and the RFQ makes following up on receipt your responsibility. Send your quote early, confirm it was received, and keep proof of sending.
  • Service Contract Act wages apply. The attached wage determination sets minimum hourly rates for Bossier, Caddo and De Soto counties, plus fringe benefits such as $5.92 per hour health and welfare and paid holidays. Price your labor at or above these rates, and ask the contracting officer to confirm this is the right wage determination, since its header shows FA460827P0001.“HEALTH & WELFARE: $5.92 per hour, up to 40 hours per week” Attachment 2 - Wage Determination.pdf, page 5
  • Base access letter needed first. If your workers will be on base, you must send the contracting officer a request on company letterhead listing the contract number, site, dates and each worker's name. Failure to comply may result in withholding of final payment, so send this before work starts.“The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base.” Combined Synopsis Solicitation - FA4608QS053.pdf, page 8
  • Price first, technical plan second. The award line says price and technical best value, yet price is ranked first and only the three lowest offers get technical review. A two-page technical plan is still required with every quote, so plan time to write it.“Lowest three (3) offers will undergo technical evaluation.” Combined Synopsis Solicitation - FA4608QS053.pdf, page 3
  • Disposal and cleanup are yours. You must haul away the removed corroded steel off base at your cost, because base dumpsters are not allowed. The government supplies only the new frame pieces and hardware, so price tools, logistics, cleanup and disposal yourself.“The Contractor shall not utilize Government dumpsters or base waste receptacles for disposal.” Attachment 1 - Statement of Work.pdf, page 1

Key terms

Who can bidAny size; no set-asideYour quote must state your SAM UEI and agreement with all terms.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1
Contract period90 DaysThe start date is not stated, and the text does not say whether the days are calendar days.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1
How they choosePrice and technical, best valuePrice is ranked first. Only the three lowest-priced offers get technical review.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1
How to submitEmail to the contract specialist and contracting officerInclude a technical plan of no more than two pages with your quote.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1

How to respond

  1. Call Contract Specialist Michael Lipscomb at (318) 456-6840 before you start, and confirm whether the due date is Friday, 27 Nov 2026 or Monday, 14 Dec 2026 and which time zone applies.
  2. Email your quote to Michael Lipscomb at michael.lipscomb.2@us.af.mil and Contracting Officer Thomas Hutchins at thomas.hutchins.2@us.af.mil before the confirmed time, and keep the sent email as proof.
  3. Include your company name, address, phone and email, your SAM UEI, a technical plan of no more than two pages on how you will replace the two vertical frame pieces and one horizontal brace, your price for CLIN 0001, and a statement that you agree to all terms and amendments.
  4. Hold your prices for 60 calendar days from the due date. File format and size limits: Not stated.
  5. Before award, send the contracting officer your base access request on company letterhead with the names of the workers who will be on site.

Attached files

From SAM.gov. Download links open the original files.

  • Attachment 2 - Wage Determination.pdfThis is the Service Contract Act wage determination with Louisiana hourly rates and fringe benefits. Read it and use it to price labor; the offer requires that you review it. Read.
  • Combined Synopsis Solicitation - FA4608QS053.pdfThis is the request for quotes, with the due date, submission rules, evaluation terms and clauses. Read it, and state in your quote that you agree to its terms. Read.
  • Attachment 1 - Statement of Work.pdfThis is the statement of work covering the removal, reinstallation, cleanup, disposal and operational check. Read it and price all of it; no form is signed. Read.

Not stated in what we read

  • Estimated value or budget for the work: Not stated.
  • Start date for the 90-day period, and whether the days are calendar days: Not stated.
  • Contract pricing type, such as fixed price: Not stated.
  • Name and contact details of the Government point of contact who will run the inspection and operational check: Not stated.
  • Which county the base work site is in, so you know which wage rows apply: Not stated.
  • When and where the government will hand over the new frame pieces and hardware: Not stated.

Notice text

The purpose of this requirement is to replace two (2) rusted vertical frame pieces and one (1) horizontal brace of the original gate valve assembly. Work requires temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications.

Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure. The contractor shall provide all logistics, labor, tools, and the lawful disposal of all materials and removed components IAW Attachment 1, Statement of Work, Dated 01 Sep 2026.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy