Sidewalk and road upgrades at Kilauea Point, Kauai, HI
You would build a sidewalk, resurface and widen Kolo and Kilauea Roads for about 1.70 miles to the Kilauea Point overlook on Kauai.
Official title: HI FLAP CR562(1) Kilauea Point
- Deadline
- Dec 17, 2:00 PM MT
- 22 days left
- Last time
- $2.6M
- Likely Goodfellow Bros, LLC
- Place
- HI
- Buyer: 6982AF Central Federal Lands Divisi
What they're buying
The work also includes guardrail, curbs, two mini-roundabouts, drainage structures and utility adjustments. Contract value and period are not stated.
Top catches
“Response deadline: 2026-12-17T14:00:00-07:00” SAM.gov record
The record gives 2:00 PM at a -07:00 offset, which is not Hawaii time. Confirm the exact cutoff on a Hawaii clock and submit early.
“Based on the testing completed on samples collected throughout the Project corridor, the subgrade would require a subexcavation depth ranging from 2 to 6 feet.” Pavement Design Report_09-2023.pdf, page 15
The pavement report says the subgrade may need 2 to 6 feet removed, with only partial removal budgeted. Check how the contract pays for unsuitable soil before you price the road work.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 4 of 30 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Sidewalk along the existing roadway from the Kuhio Highway intersection to the refuge overlook
- Pavement rehabilitation and resurfacing, with full-depth pavement on aggregate base where the road is widened
- Reconstruct the existing overlook turnaround
- Guardrail, curb and gutter, two mini-roundabouts, striping and pedestrian crossings
- Precast drainage structures (catch basins and drywells), with shop drawings submitted for CO review
- Utility adjustments; the notice calls them minor, but the plans show many water, power and telecom relocations
Who did it before
$2.6M
on the contract that likely holds this work now: Goodfellow Bros, LLC. It ended Apr 14, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Deadline uses a -07:00 offset. The record gives 2:00 PM at a -07:00 offset, which is not Hawaii time. Confirm the exact cutoff on a Hawaii clock and submit early.
- Deep subgrade removal may be needed. The pavement report says the subgrade may need 2 to 6 feet removed, with only partial removal budgeted. Check how the contract pays for unsuitable soil before you price the road work.
- Utility owner needs notice and an inspector. Hawaiian Telcom requires advance notice before excavation near its facilities, and an inspector on site for some work. Schedule that into your work plan and price the wait time.“a minimum of 3 days prior to excavation, bracing or backfilling of Hawaiian Telcom's structures or facilities.” HI FLAP CR 562(1) Plans.2026.10.01.pdf, page 172
- Two different inspector phone numbers. The plans give Rick Ramones at (808) 651-2281 on one sheet and at 808-651-2260 on another. Call to confirm the right number before you schedule work near telecom facilities.“Contact Hawaiian Tel inspector Rick Ramones at (808) 651-2281” HI FLAP CR 562(1) Plans.2026.10.01.pdf, page 152
- Soil report is over three years old. The pavement design report is dated September 2023, and its borings were drilled in February 2022. Ask the designer to confirm the recommendations still apply before you rely on them for pricing.“A substantial period of time has passed since the date of this report.” Pavement Design Report_09-2023.pdf, page 18
- Project length differs between documents. The notice says about 1.70 miles, and the pavement report says about 1.72 miles. Check the length against the plans before you price paving and sidewalk quantities.“The total project length is approximately 1.70 miles.” Notice text
Key terms
| Who can bid | Open to all businesses (no set-aside)The notice gives no size standard. Check the solicitation PDF, which we could not review.SAM.gov record |
|---|---|
| Contract type | Road and sidewalk constructionThe notice does not say whether the contract is fixed-price or another type.Notice text |
How to respond
- Where to send: Not stated in the provided text. Read the solicitation PDF on SAM.gov, which we could not review.
- Format and required forms: Not stated in the provided text.
- Deadline: Thursday, December 17, 2026, 2:00 PM at a -07:00 offset, as written. Confirm the cutoff on a Hawaii clock and send early.
- Before you price: read the subgrade, drainage shop drawing and utility notes in the plans and the pavement report.
Attached files
From SAM.gov. Download links open the original files.
- 6982AF27B000008. HI FLAP CR562(1) Kilauea Point.pdf Not read: over our length limit.
- Kolo Horizontal Alignment.pdfSurvey alignment data for Kolo Road; only part was provided. Read it for layout, no form to fill in. Read in part.
- Pavement Design Report_09-2023.pdfA 2023 geotechnical pavement design report with soil findings and pavement recommendations; only part was provided. Read it for pricing, no form to fill in. Read in part.
- FP-14_Eng.pdf Not read: over our length limit.
- Kilauea Horizontal Alignment.pdfSurvey alignment data for Kilauea Road; only part was provided. Read it for layout, no form to fill in. Read in part.
- Schedule A Grading Summary.pdf Scanned image, not read.
- HI FLAP CR 562(1)_Kilauea Hyd Report_2026.10.01.pdf Not read: over our length limit.
- HI FLAP CR 562(1) Plans.2026.10.01.pdfConstruction plan sheets, including drainage, utility and detail sheets; only part was provided. Read them to price the work, no form to fill in. Read in part.
22 more files from a ZIP archive
- XYZ Reports for grade finishing stakes/Blue Tops_L 168 50-182 49.27.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Blue Tops_L 501 42.63-502 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Blue Tops_R 168 54.31-177 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Blue Tops_R 501 42.63-504 00.00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Red Tops 102 00-108 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Red Tops 126 00-127 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Red Tops 128 50-168 00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Red Tops 168 50-182 49.27.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Red Tops 501 42.63-504 00.00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade 102 00-108 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade 126 00-127 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_L 128 50-168 00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_L 168 50-172 67.72.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_L 173 00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_L 173 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_L 174 00-182 49.27.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_L 501 42.63-502 50.00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_R 128 50-168 00.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_R 168 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_R 168 54.31-177 50.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_R 178 00-182 49.27.xtb Could not be read.
- XYZ Reports for grade finishing stakes/Subgrade_R 501 45.63-504 00.00.xtb Could not be read.
Download the archive from SAM.gov.
Not stated in what we read
- Estimated value of the contract: Not stated.
- Contract period and completion time: Not stated.
- How to submit, where, and which forms are required: Not stated. The main solicitation PDF was left out and we could not review it, so you must read it.
- Award basis and evaluation method: Not stated.
- Questions deadline and whether a site visit is required: Not stated.
- The grade stake files and the Schedule A Grading Summary could not be read. You must review them.
Notice text
Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook.
The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists.
Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.
As published on SAM.gov.
Contacts
- Stephanie Navarro, cflcontracts@dot.gov
- Ryan Phillips, cflacquisitions@dot.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Federal Highway Administration for the same kind of work (NAICS 237310, service code Y1LB) in Hawaii that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Hi NOAA Malo(1) Mauna Loa Access Rd Construction Contract for Repairs to Mauna Loa RoadwayGoodfellow Bros, LLC · 6982AF26C000002 | $2,600,000 | Apr 14, 2026ended | HI |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 17, 2:00 PM MT22 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237310, highway, street, and bridge construction, soonest deadline first.
- Departmental OfficesWaterman canal gate for Wheeler refuge, Decatur, AL
- Department of the ArmyRoads, parking and grounds renovation, Detroit, MI
- Departmental OfficesRoad and bridge repair at national parks nationwide
- Department of the NavyService road realignment and roundabout, Camp Lejeune, NC
- Federal Highway AdministrationThree bridges and a culvert on SR 35, Mimbres, NM
- Federal Highway AdministrationThree bridges and road rebuild in Arches National Park, UT
- Forest ServiceRoad and trailhead upkeep, Little Missouri Grassland, ND
- Department of the Air ForceTaxiway repairs at North Auxiliary Airfield, SC
Free · at most one email a morning
Get new notices from Federal Highway Administration by email
Each morning we'll send the new solicitations and sources-sought notices from Federal Highway Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy