1. Opportunities
  2. Department of Agriculture
  3. Forest Service
  4. 1240LT27Q0026

Pacific Crest Trail bridge replacement, Bridgeport, CA

Replace the Pacific Crest Trail bridge over the West Fork West Walker River in the Hoover Wilderness near Bridgeport, CA, with a new 6-by-35-foot glulam deck bridge.

Official title: HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Deadline
Dec 11, 5:00 PM MT
16 days left
Who can bid
Not stated
The notice names no set-aside
Last time
$799K
Likely Jeremy Harris Construction, Inc.
Place
Bridgeport, CA
Buyer: White River National Forest

What they're buying

Work is 120 calendar days, with a period of performance from July 1 to October 29, 2027.

Top catches

Set-aside status conflicts
“Small Business Set Aside is “Total Small Business set-aside.”” Notice text

The notice text says total small business set-aside, but the SAM record says Not stated. If your firm is not small for NAICS 237310, you may not be eligible, so get the contracting officer to confirm in writing before you spend time on a quote.

Experience forms were removed
“C04d Experience Questionnaire_1240LT27Q0026 - Removed” Notice text

The experience questionnaire and past performance data sheet were removed in Rev2, yet the SOW still says they judge technical acceptability. Ask the contracting officer in writing what to submit, and prepare three recent, similar projects in case the evaluation factors apply.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 5 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove and haul off the existing steel and timber bridge: four 33-foot H9 steel joists, decking and railings.
  • Design, fabricate, transport and install a 6-foot by 35-foot glulam deck panel bridge with timber railing.
  • Rebuild both approaches, install 30 linear feet of approach railing, and remove bedrock at the east approach.
  • Set timber sills on bedrock and a leveling course, with tie rods and treated railing posts as the drawings show.
  • Fly loads in by helicopter under a flight plan, with a staging area near Highway 108 and as few flights as practical.
  • Submit a construction schedule 45 days before construction, and safety, traffic control and erection plans 30 days before.

Who did it before

$799K

on the contract that likely holds this work now: Jeremy Harris Construction, Inc.. It ends Nov 30, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Set-aside status conflicts. The notice text says total small business set-aside, but the SAM record says Not stated. If your firm is not small for NAICS 237310, you may not be eligible, so get the contracting officer to confirm in writing before you spend time on a quote.
  • Experience forms were removed. The experience questionnaire and past performance data sheet were removed in Rev2, yet the SOW still says they judge technical acceptability. Ask the contracting officer in writing what to submit, and prepare three recent, similar projects in case the evaluation factors apply.
  • Temporary bypass line conflicts. The drawings schedule of items prices a temporary bypass with trail and ford crossing, but the Q&A says the contractor will not build a temporary crossing or trail. Ask which applies before you price that line.“TEMPORARY BYPASS, INCLUDING TRAIL AND FORD CROSSING” C04b R2_Drawings_PCT TRAIL BRIDGEup.pdf, page 2
  • Email or sealed copy unclear. Rev2 says to email quotes to the contracting officer, but the SF 1442 says offers go to the Ogden, UT address in Item 8. Get written confirmation of which method counts, so your quote is not rejected as late or non-compliant.“copies to perform the work required are due at the place specified in Item 8 by” C04 R2_1240LT27Q0026_SOW.pdf, page 1
  • Bid bond is 20 percent. You must post a bid bond equal to 20 percent of your quote, which is $100,000 on a $500,000 quote. Performance and payment bonds are also required within 10 calendar days after award, so talk to your surety now.“Bid Bond amount: Shall be 20% of Quote” Notice text
  • Helicopter costs fall on you. The contracting officer says landing is not assumed, so every load will be slung in. Mobilization includes the helicopter and the load limit is left to you and your helicopter service, so price flights and staging as your own costs.“The safe assumption would be that all loads will have to be slung in.” C04g R2_QA 11_05_2026_PCT_Bridge.doc

Key terms

Who can bidTotal small business set-aside (per notice text)The SAM record says Not stated. Confirm this with the contracting officer before you bid.Notice text
Contract period120 calendar days after notice to proceed; period 07/01/2027 to 10/29/2027SOW section 1.5 shows 07/01/ 2026 for the start date. Confirm.Notice text
How they chooseLowest price among technically acceptable quotesTechnical factors are pass or fail. An evaluation factors attachment describes factors used in addition to price.C04 R2_1240LT27Q0026_SOW.pdf, page 15
How to submitEmail to lonnie.root@usda.govThe SF 1442 names an Ogden, UT address for sealed offers. Confirm the method with the contracting officer.Notice text
Questions dueClosed 11/11/2026No later question date appears in the notice text. Ask the contracting officer in writing anyway.Notice text
Estimated value$500,000 to $1,000,000 (stated range)A range from the notice text, not a firm estimate or price.Notice text
Contract typeFirm fixed price, one awardYou must price all base items to be considered responsive.C04 R2_1240LT27Q0026_SOW.pdf, page 15
Site visitNot mandatory; self-guided visit allowedThe Zoom visit dates (11/03/2026 in the SOW, 11/06 in Rev1) have passed. A video link is in Rev2.C04 R2_1240LT27Q0026_SOW.pdf, page 15

How to respond

  1. Read the Schedule of Items spreadsheet (C04a R2) yourself. We could not review it. Price every line item, because a missing price can exclude your quote.
  2. Email your quote to lonnie.root@usda.gov before 17:00 MT on Friday, 12/11/2026, unless the contracting officer confirms a different method in writing.
  3. Include a technical approach covering means and methods, a flight plan, an equipment list, a schedule with a narrative, and any SOW requirement you cannot meet.
  4. Include a bid bond for 20 percent of your quote, and complete and sign the SF 1442 offer block, with an acceptance period of at least 60 calendar days after the due date.
  5. Before you submit, ask the contracting officer in writing about the set-aside status, the removed experience forms, and the temporary bypass line.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Size standard for NAICS 237310, and whether the set-aside is correct, since the SAM record says Not stated.
  • Contents of the Schedule of Items spreadsheet (C04a R2), which we could not review.
  • Whether fabrication time counts toward the 120 days. The Q&A says it does not, but SOW section 1.6 says the 120 days include fabrication.
  • Whether the 12/10/2026 anticipated award date, one day before the deadline, has moved.
  • Whether the contracting officer will provide an engineer's estimate. The Q&A says it would be requested, with no answer given.
  • Liquidated damages and penalties for late completion: not stated in the provided text.

Notice text

HUMBOLDT TRAIL BRIDGE REPLACEMENT Pacific Coast (PCT) Rev2 (11/20/26) Due Date Changed to 12/11/2026 C04d & CO4e has been Replaced with D04f and removed from SAM Link to Video showing area is added as https://usfs-public.box.com/s/1nrudtpidlbvjnrs37ffzf0mefimog21 C04a updated SOI with CO4a Rev2 Note Small Business Set Aside is “Total Small Business set-aside.” Magnitued Range are Between $500,000 and $1,000,000 Bid Bond amount: Shall be 20% of Quote Quotes Must be submitted Electronicly to CO at lonnie.root@usda.gov Revised Attachments: C04 R2_1240LT27Q0026_SOW C04a R2 SOI C04b R2_Drawings_PCT TRAIL BRIDGE CO4f_EvaluationFactors C04g R2_QA 11_05_2026_PCT_Bridge Removed Attachments: C04d Experience Questionnaire_1240LT27Q0026 - Removed C04e Past Performance Data Sheet_1240LT27Q0026 - Removed ============================================================ Rev1 Q&A Due Date: 11/11/2026 Vendor Questions must be Emailed Directly to the COR: Jordan Burge Civil Engineer - FS-IRR4-HNF-RELMHS jordan.burge@usda.gov VIRTUAL PRE-BID MEETING The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number.

A video of the site will be shared during the pre-bid, so please join via computer if possible. Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below. https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su Phone Number: (202) 650-0123 Meeting ID: 898702315# ==================================================================== HUMBOLDT TRAIL BRIDGE REPLACEMENT Pacific Coast (PCT) Forest: Humboldt-Toiyabe National Forest (HTNF) Bridgeport Ranger Station The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River.

The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access. Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience. ATTACHMENTS: C04a ScheduleOfItems_SectionB_1240LT27Q0026 C04b DesignDrawings_1240LT27Q0026 C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026 C04d Experience Questionnaire_1240LT27Q0026 - Removed C04e Past Performance Data Sheet_1240LT27Q0026 - Removed AWARD SCHEDULE: Site Visit: Friday, November 6 at 10:00am PST on Zoom Q&A Due Date: 11/11/2026 Quotes Due Date: 11/28/2026 - 1700 MT Anticipated Award Date: 12/10/2026 POP: July/01/2027 - 10/29/2027 = 120 days Contracting Officer Representative: Jordan Burge Civil Engineer - FS-IRR4-HNF-RELMHS jordan.burge@usda.gov

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Forest Service for the same kind of work (NAICS 237310, service code Y1LB) in California that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Forest Service by email

Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy