Arc flash study and electrical testing, Lexington, KY

The VA wants a triannual electrical study with arc flash, short-circuit and coordination analysis, plus maintenance and testing of switchgear, panels, transformers, generators and transfer switches at its Bowling and Sousley campuses in Lexington, KY.

Official title: H361--LEX Triannual Energy Study and ARC Flash Testing

Deadline
Dec 3, 11:00 AM CT
8 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Lexington, KY
Buyer: 249-Network Contract Office 9 (36C249)

What they're buying

All maintenance must be finished within 90 calendar days of contract start, and only service-disabled veteran-owned small businesses may bid.

Top catches

Due dates conflict in amendment
“Offer due date: 11/30/2026 @ 11:00 CT” 36C24927Q0038 0001.docx

The amendment gives several dates: 10/30/2026 (already past), 11/30/2026 in the cover file, and 12/03/2026 in the answers. Ask the contracting officer to confirm the date in writing before you plan your work.

Subcontracting limit not settled
“Yes, the clause is included and will be included in the order in full text for completion prior to award.” Notice text

The question asks whether 50% or 75% applies, and the answer does not say. Ask which limit applies and whether the signed certificate goes in with your quote, since both affect whether you can bid.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 6 of 27 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Triannual short-circuit, coordination and arc flash study covering the Bowling and Sousley campuses, sealed by a licensed PE if a firm prepares it (A.30)
  • Maintenance and testing of switchboards, distribution panels, medium-voltage switches and transformers, network protectors, generators and transfer switches under SOW Sections 3 and 7 and NETA MTS (A.16, A.40)
  • Energized infrared scans of panelboards, bus plugs, MCCs and transformers at both campuses (A.17)
  • Oil and coolant samples on all generators (A.10, A.20) and primary current injection testing of low-voltage power breakers and molded case breakers 225 A and up (A.37)
  • Emergency repairs under CLIN 1002, performed only after approval by the Station and the Contracting Officer (A.5)
  • Reports: a maintenance and testing report with hard and electronic copies, an arc flash study report, and a protective device study certification (A.23)

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Due dates conflict in amendment. The amendment gives several dates: 10/30/2026 (already past), 11/30/2026 in the cover file, and 12/03/2026 in the answers. Ask the contracting officer to confirm the date in writing before you plan your work.
  • Subcontracting limit not settled. The question asks whether 50% or 75% applies, and the answer does not say. Ask which limit applies and whether the signed certificate goes in with your quote, since both affect whether you can bid.
  • Lowest price wins, not best value. Award goes to the lowest price among offers that pass. Extra technical strength earns no credit, so price tight and include every required item to pass.“For this acquisition, award will be made using the Lowest Price Technically Acceptable (LPTA) methodology.” Notice text
  • Utility company charges are yours. You must find out the utility charges for the 4-hour test and feeder outage fees from the utility yourself and include them in your price. The VA has no historical charge data to share.“must include all utility costs in their pricing” Notice text
  • Emergency repair line has no set amount. CLIN 1002 holds only an estimated amount, and the total repair cost cannot be known in advance. Each repair needs prior approval, so decide how you will price this line and confirm the approval process with the contracting officer.“Although the total cost of such repairs cannot be determined in advance” Notice text
  • Test equipment and power are yours. Primary current injection testing is required on many breakers. The VA will not provide tools, equipment or power for the test, so include your own test set and its power source in your price.“The VA will not furnish tools or equipment for the inspections.” Notice text

Key terms

Who can bidSDVOSB set-aside onlySet-aside under FAR 19.14. Confirm your status before you bid.SAM.gov record
Contract periodAll maintenance done within 90 calendar days of contract startThe contract has no options (A.7). The start date is not stated.Notice text
How they chooseLowest price technically acceptable (LPTA)Award goes to the lowest-priced offer that passes technical review. Extra technical strength earns no added credit (A.24).Notice text
Site visitNov 16 and 17, 2026 (already passed); optionalSite visit attendance is not a condition of submitting a quote (A.4). Sign-in sheets will not be posted (A.15).Notice text

How to respond

  1. Check SAM.gov for amendment 36C24927Q0038+0002.docx and the original RFQ 36C24927Q0038.docx, which we could not review. You must read them before you price.
  2. Send your offer by Thursday, December 3, 2026, 11:00 AM CT, per amendment answer A.42. The method of sending is Not stated.
  3. Label the prime and any first-tier subcontractor's personnel, certifications, experience, references and past performance as prime or subcontractor (A.3).
  4. Include each worker's OEM training documents with the offer (SOW Section 6 h). The Q&A mentions a 5-file, 8 MB limit, but the answer does not confirm it.
  5. If a firm other than the switchgear maker prepares the protective device study, submit with the offer the firm name, PE name and license, software, and two references (A.30).

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Contents of amendment 36C24927Q0038+0002.docx, which we could not review; it may change the due date or other terms.
  • Where and how to send the offer, and whether the 5-file, 8 MB limit applies.
  • Contract start date, end date, and the outage window for the work.
  • Estimated contract value and the dollar amount set for CLIN 1002 (emergency repairs).
  • Whether the signed subcontracting certificate must be returned with the quote (question 2 answer not given).
  • Date of the 4-hour electrical test (A.14 says TBD).

Notice text

This amendment is to publish Questions and Answers as submitted in accordance with instruction on RFQ 36C24927Q0038 and also to extend the offer due date: 12/03/2026 @ 11:00 (CT). No other changes are made at this time. Questions and Answers Q.1. Page 1 of the solicitation lists November 30, 2027, at 11:00 AM CST, which is also the deadline currently displayed on SAM.gov. However, page 20 of the solicitation states November 30, 2026, at 11:00 AM CT. Could you please confirm the correct quote submission deadline?

A.1. See Amendment 36C24927Q0038_0001, offer due date corrected. The date and time shown on page 1 are system-generated, the solicitation deadline remains 11:00 a.m. local time for the contracting office in Murfreesboro, Tennessee. Currently (in November), CT (Central Time) or CST (Central Standard Time) are both used, but CST is technically accurate right now because Daylight Saving Time ended in early November, putting the region on Central Standard Time.

The offer due date and time is 10/30/2026 @11:00 CT. Q.2. VAAR 852.219-75 is incorporated by reference, and the requirement is solicited under NAICS 238210. Please confirm which limitation on subcontracting applies to this award: services at 50 percent, or special trade construction contractors at 75 percent. Please also confirm whether the signed certificate is to be returned with the quote. A.2. Yes, the clause is included and will be included in the order in full text for completion prior to award.

Q.3. For the technical subfactors and for past performance, please confirm whether the Government will consider the personnel, certifications, experience, references and prior studies of a proposed first-tier subcontractor together with those of the prime. A.3. Submit the information in detail as “prime” or subcontractor. FAPIIS (Federal Awardee Performance and Integrity Information System) reports will be evaluated. Q.4. Please confirm that attendance at the November 16 and 17 site visits is optional and is not a condition of submitting a quote.

A.4. Attendance is optional. Q.5. Line item 1002 covers emergency repair work if circuits cannot be energized after inspection. Please advise the pricing basis the Government wants for this line item, for example a not-to-exceed amount set by the Government, hourly rates with an estimated quantity, or a single lump sum, so that all quotes are priced on the same basis. A.5. CLIN 1002 provides an estimated amount for emergency repair funding. If emergency repairs become necessary, all repair costs and funding must be approved by the Station and the Contracting Officer (CO) before work is performed.

Although the total cost of such repairs cannot be determined in advance, including this CLIN and associated funding is necessary because the Statement of Work (SOW) requires the Contractor to perform emergency repairs when needed and supports the award of the contract. Q.6. Please confirm whether the Government will accept a partial invoice after acceptance of field testing at each campus and a final invoice after acceptance of the studies and final report.

A.6. Invoicing is in arrears, no partial invoices are to be accepted prior to all work is completed and final acceptance. Q.7. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? A.7. This is a new requirement, although this study is completed triennially the contract does not have any options. Q.8. Can our references be for work our owner performed or managed while at a prior employer?

A.8. No employee references are requested. The vendors Past performance is requested. Q.9. Is a Kentucky electrical license required, or will licenses from another state work? A.9. Need to have a master electrician on shift while work is being performed. Kentucky license is required. Q.10. SOW Section 7 calls for oil and coolant samples on "three existing generators." The attachments show at least three at Bowling and six at Sousley. Which three are included?

A.10. The VA requests oil and coolant samples on all generators. Q.11. SOW Section 6, item k says emergency repairs are paid by change order or separate PO. What should we put in CLIN 1002? Is connector replacement found during the IR scan in the base price? A.11. See A.5 for CLIN 1002. Yes, connector replacement found during the IR scan is part of the base scope. SOW Section 7 (Infra-Red Scanning) says problem connections shall be replaced with new connectors and/or tightened to the manufacturer's specifications.

Q.12. Who approves the consultant for the short-circuit, coordination and arc flash studies, and when? A.12. Technical review by the COR/Engineering Service, will approve the consultant as part of the technical acceptability evaluation. Q.13. SOW Section 6, item h asks for every worker's OEM training documents at the time of offer. With the 5-file, 8 MB limit, can we send a summary with the quote and the full documents before work starts? A.13. SOW Section 6, item h requires OEM training documentation to be submitted at the time of offer.

Per SOW Section 2, NFPA 70E qualified person certifications shall be submitted to the Contracting Officer before work begins. Q.14. Is the 4-hour test date set? A.14. TBD Q.15. Will the site visit sign-in sheets and minutes be posted? A.15. No notes or sign in sheet will be posted. Q.16. Scope – Panelboards - SOW Section 3 lists "Distribution Panels" among the equipment to be maintained and tested, while the Equipment List paragraph applies the procedures to all equipment in the attached electrical studies, which include several hundred branch panelboards.

Is hands-on maintenance and testing (e.g., torque verification, breaker testing) required on every branch panelboard, or is an energized infrared scan and visual inspection sufficient for branch panelboards, with full testing limited to distribution panels? A.16. Full maintenance and testing in accordance with SOW Section 7 and NETA MTS, including breaker testing and connection torque verification, is required for the switchboards and distribution panels listed in SOW Section 3.

For branch panelboards the required scope is an energized infrared scan, a visual inspection and exercising of the breakers. Branch-panel connections or breakers with thermal anomalies or visual defects shall be investigated and corrected per SOW Section 7 (Infra-Red Scanning). Routine de-energized torque verification and breaker testing are not required on every branch panelboard. Q.17. Scope – Panelboards - The Infra-Red Scanning section references bus plugs, panelboards, MCCs and transformers in the Main, Tower and Chiller buildings.

Does the infrared scan also apply to the panelboards in the Sousley Division buildings? A.17.Yes it does. Q.18 . Scope – Equipment Inventory - The SOW references a Government-furnished inventory of equipment to be maintained, inspected and tested. Is there an inventory beyond the arc flash study data files and 2023 test reports attached to the RFQ? If so, can it be provided? A.18. The SOW lists a Government-furnished inventory as an attachment. Per the SOW Equipment List paragraph, any equipment in the facility that is not shown in the attached studies shall also be tested and maintained.

Mark its information and location on a hard copy of the studies and turn it in with the report. Q.19. Scope – Equipment Inventory - The 2023 test reports include medium-voltage equipment not shown in the arc flash study data files (for example, Bowling Tower and Main Hospital transformers T2–T6, MV switches T1–T4 and network protectors, and the Sousley Building 68 medium-voltage switchgear). Please confirm this equipment is included in both the maintenance/testing scope and the arc flash and coordination study.

A.19. Yes. SOW Section 3 includes medium-voltage switches, medium-voltage circuit breakers, liquid-filled transformers and switchgear. The Equipment List paragraph requires testing of equipment that exists in the facility even if it is not shown in the attached studies. The arc flash study covers high- and low-voltage systems, with field-verified data, for the Bowling Chiller, Main and Tower buildings and all Sousley buildings. The short circuit and coordination study covers each protective device back to the utility and generator sources.

Q.20. Scope – Generators and Transfer Switches - The Power Generators section calls for oil and coolant sample testing of "the three existing generators." The study data shows generators serving multiple buildings at both divisions. Please identify the three generators (division, building and unit ID) included in this requirement. A.20. The Va requests oil and coolant samples on all generators. Q.21. Scope – Generators and Transfer Switches - The SOW requires ASCO transfer switches to be tested and maintained by ASCO technicians.

Can the VA provide a list of the ASCO units at each division? A.21. The majority of ATS on both campuses are from ASCO. Q.22. Schedule and Deliverables - Normal working hours are listed as 7:00 AM–4:30 PM ET in SOW Section 5 and 8:00 AM–4:30 PM ET in the Work Hours section. Please confirm which applies. A.22. 7:30 AM–4:30 PM is normal business hours. Outages should occur after hours. Q.23. Schedule and Deliverables - The general test report calls for four (4) hard copies, while the arc flash study report calls for three (3).

Please confirm the required number of hard copies for each deliverable. A.23. These are separate deliverables. Maintenance and testing report: one (1) hard copy to the Contracting Officer, plus software copy, four (4) hard copies and one (1) CD-ROM/DVD (Microsoft Word) to the Chief of Engineering Service, within seven (7) calendar days. Arc flash study report: software copy, three (3) hard copies and one (1) electronic copy on CD or DVD. Protective device study certification: four (4) copies to the Resident Engineer two weeks before final inspection.

Q.24. Evaluation - Section (ix) describes a Lowest Price Technically Acceptable process, while other language references best value and price and other factors considered (FAR 12.204). Please confirm which evaluation method will be used. A.24. "Best Value" is not an evaluation method used under Simplified Acquisition Procedures. For this acquisition, award will be made using the Lowest Price Technically Acceptable (LPTA) methodology. “Best value” is a general procurement concept that means the Government seeks the proposal that provides the greatest overall benefit in accordance with the requirements and evaluation criteria established in the solicitation.

Under FAR Part 12 Simplified Acquisition Procedures, proposals are evaluated as either technically acceptable or unacceptable. Once a proposal is determined to be technically acceptable, additional technical superiority generally does not provide added value in the evaluation. As a result, award is made to the lowest-priced, technically acceptable offeror. I believe the confusion may stem from the term "Best Value Tradeoff" found in FAR / RFO Part 15.

Which does not apply to this acquisition. Q.25. The Statement of Work lists a Government-furnished inventory of electrical equipment. Can the inventory or equipment counts by campus be provided to quoters? A.25. See A.18. The SOW does not give equipment counts by campus. Q.26. Price Schedule line 1001 lists only the Bowling Campus, but the Statement of Work covers Bowling and Sousley. Please confirm both campuses are included, and whether they should be priced as one line or separately.

A.26. Yes, SOW Section 1 covers both the Bowling Campus and the Sousley Campus. Q.27. Line 1002 (emergency repair) states additional payment is by change order. May quoters price this line as hourly rates? A.27 See A.5 Q.28. The Statement of Work makes the contractor responsible for utility company costs for the 4-hour EES test and fees for main feeder outages. Can the Government share estimated or historical utility charges for these? A.28. The Government does not have historical utility charge data available for release.

Offerors are responsible for coordinating with the utility company (KU) to determine applicable charges and must include all utility costs in their pricing, as required by the SOW. Q.29. Section 7 requires UL 96A certification where lightning protection systems exist. Which buildings at each campus have lightning protection systems? A.29. Building 39, 1, CLCs (201, 202, 204, 205), and Building 67 chiller plant at the Sousley Campus. Main and Tower Buildings at the troy bowling campus., Contractor to confirm.

Q.30. The protective device study must be prepared by the 15 kV switchgear manufacturer or an “approved consultant.” What is the approval process, and will a PE-stamped study from a qualified engineering firm be accepted? A.30. Yes. A study prepared by a qualified independent engineering firm is acceptable in lieu of the 15 kV switchgear manufacturer, provided the study is prepared under the supervision of, and sealed by, a licensed Professional Engineer (electrical).

To obtain approval, submit the following with the offer: the firm name, the responsible PE's name and license, the software to be used, and at least two references for comparable short circuit, coordination and arc flash studies completed within the past [5] years. The Contracting Officer, with input from the COR/Engineering Service, will review the submission as part of the technical acceptability evaluation. The final study shall bear the PE seal and meet all requirements of the SOW..

Q.31. The label requirements cite ANSI Z535.4-2002 and a prohibited approach distance. May labels follow current NFPA 70E, IEEE 1584-2018, and current ANSI Z535.4? A.31. Yes Q.32. The report deliverables say 4 hard copies in one section and 3 in another. Please confirm the count, and whether a USB drive is acceptable in place of CD/DVD. A.32. See A.23. The SOW specifies the electronic copy on CD-ROM or DVD. Can also send a file share link to download as long as the VA can access the files.

Q.33. Will the Government accept a schedule with field work concentrated in January and February, finishing by 3/1/2027? A.33. Per SOW Section 6, all maintenance shall be completed within 90 calendar days of the contract start date. The proposed schedule submitted with the quote will be reviewed by VAMC Engineering Service, and the Contractor shall incorporate any adjustments. Outages must be scheduled at least 2 weeks in advance and done during off-hours or weekends.

The VA would like to complete all outages before 3/1/27 if possible. Q.34. Will site visit sign-in sheets or notes be provided? A.34 See A.15. Q.35. In the Sousley Campus documentation, there are arc flash study data files in PDF format and there are arc flash study one-lines. o Is the arc flash study final report available? A.35. Yes it is uploaded. o Is the arc flash study software model available? A.35. Not available. o Does the VA want to own the software model for the 2027 study update?

A.35. Per the SOW Records Management Obligations, LVAHCS owns the rights to all data produced under this contract. The VA would like to request a copy. Q.36. In the Sousley Campus documentation, there is a one-line of CLC Phase 2. Is this the only change since the last arc flash study? A.36. Building 39 was updated around the time of the last study. At the bowling campus Tower critical ATS has been updated. 3 ATS serving the tower elevators have been replaced.

There could be some other changes as well. Q.37. In the Sousley Campus documentation, there is a maintenance report: o Have any of the recommendations from the report been implemented? A.37. Some have been implemented, contractor to confirm. Panel 2 main switchboard has been replaced. Main Vault building 3 electrical room has been replaced and has conditioned air. Main Vault B29 has been corrected. Has a new split unit. Buildings 2,3, 22, 25 switchgears have been replaced.

PMT-75 has been repaired. o Should this report be used as a guideline for the scope of the maintenance this cycle? A.37. Maintenance scope is defined by SOW Sections 3 and 7 and the latest edition of the NETA Maintenance Testing Specifications. o The report includes a lot of additional information: white papers, instruction manuals, technical articles, etc. Are those expected in the new report? A.37. SOW Section 4 requires reference materials, such as manufacturer's specifications and the coordination study, in both the hard copy and electronic reports.

White papers and technical articles are required when applicable. o It appears that the low voltage circuit breaker trip units/devices were tested via primary current injection testing. Will primary current injection testing be required? A.37. Yes, SOW Section 7 requires a high-current test and calibration to the manufacturer's time-current characteristic curves for switchgear and distribution circuit breakers. Primary current injection testing is required for all low-voltage power circuit breakers and for molded case circuit breakers rated [225] Amp and above in switchboards and distribution panels.

Breakers with electronic trip units may be tested by secondary injection where the manufacturer provides a test port, with primary injection used to verify the CT/sensor path. Motor circuit protectors shall be tested only per the manufacturer's recommendations. o Assuming primary current injection testing will be required, will the VA provide a power source for the test set (480V, single-phase, 60A or higher), or will we need to provide a generator to power the test set?

A.37. Per SOW Sections 5 and 6.i, the Contractor shall provide all tools, instruments and equipment. The VA will not furnish tools or equipment for the inspections. Q.38. For the Sousley Campus, when is the maintenance expected to be done – starting month, days of the week, hours onsite per day, day shift or night shift? A.38. The SOW does not set a starting month. Per SOW Sections 5 and 6, most work will be done at night and after normal working hours.

All power outages shall be on off-hours or weekends, and some non-disruptive work may be approved during normal hours by the COR. All work and outages must be scheduled with the COR at least 2 weeks in advance and finished within 90 calendar days of the contract start date. Q.39. For the Bowling Campus, all the same questions above apply. In addition, it was mentioned that 5-10 LV transformers have been added since the last arc flash study. Is that all that is expected to be different since the last study?

A.39. See A.37 and A.38. Per the SOW Equipment List paragraph, any equipment not shown in the attached studies shall be tested and maintained. Mark its information and location on a hard copy of the studies and turn it in with the report. Q.40. Who is responsible for ATS and Generator testing? Is that part of the maintenance scope, or were those reports included in the documentation just for informational purposes? A.40. The Contractor. Engine generators and automatic transfer switches are listed in SOW Section 3 as equipment to be maintained and tested.

SOW Section 7 includes oil and coolant sample testing of the three existing generators and full transfer switch testing. ASCO transfer switches must be tested and maintained by ASCO technicians. Q.41. The reports from the successful bidder 3 years ago seem very thorough and professional. Why would the VA want to go with someone else this time? A. 41. There is no justification for a Sole Source Acquisition. Q.42 Can we get a bid extension? A.42. Yes, I will revise the closing date and time to 12/03/2026 @11:00 AM (CT).

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy