Water damage repairs at FAA ARSR site, Morales, TX
The Federal Aviation Administration (FAA) wants a contractor to reseal and repair the exterior of an ARSR equipment building, replace exterior doors and fans, fix water-damaged walls and ceilings, and repaint, at a site about 12 miles south of Hallettsville, TX.
Official title: Morales, TX (QNA) ARSR - Repair/Replace Building and Exterior Items to Correct Water Damage, Prevent Water Intrusion
- Deadline
- Dec 23, 5:00 PM CT
- 32 days left
- Who can bid
- Small businesses
- Size standard for NAICS 236220: $45 million in average annual receipts · Who qualifies
- Last time
- $4.26M
- Likely Sergents Mechanical Systems Inc
- Place
- TX
- Buyer: 6973GH Franchise Acquisition Svcs
What they're buying
The notice does not give a contract length or value.
Top catches
“GOVERNMENT FURNISHED MATERIAL (GFM)” 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf, page 26
Sections 01 11 00 and 09 65 00 say you furnish the new floor tile, but a photo example says the Government furnishes it. Ask the Contracting Officer which applies before you price the flooring.
“airless spray applied 2 coats of ZRC cold galvanizing high zinc rich compound or approved equivalent or better.” 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf, page 158
Section 09 90 00 calls for two coats of zinc-rich compound on galvanized cable tray. Sections 01 11 00 and 09 91 13.42 call for three coats of Rust Grip. Ask the RE/COR which coating to price.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 2 of 7 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Power wash the building exterior, then apply two coats of water repellent to the CMU walls and concrete foundation.
- Remove and reseal all exterior joints, including eight vertical CMU wall control joints.
- Replace two attic exhaust fans with controls and weatherhoods, and replace one UPS room wall fan.
- Replace exterior door hardware, lock cylinders, sweeps and gasketing, and add panic hardware on two rooms.
- Replace damaged and mold-stained ceiling tiles and vinyl floor tile with 4-inch base, and repair plywood and gypsum joints.
- Paint metal siding, doors and about 24 steel bollards, and coat the cable trays. Field verify all quantities before ordering.
Who did it before
$4.26M
on the contract that likely holds this work now: Sergents Mechanical Systems Inc. It ends Dec 31, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Flooring supply conflict. Sections 01 11 00 and 09 65 00 say you furnish the new floor tile, but a photo example says the Government furnishes it. Ask the Contracting Officer which applies before you price the flooring.
- Cable tray coating conflicts. Section 09 90 00 calls for two coats of zinc-rich compound on galvanized cable tray. Sections 01 11 00 and 09 91 13.42 call for three coats of Rust Grip. Ask the RE/COR which coating to price.
- Limited work hours. Regular work is allowed Monday to Friday, 0700 to 1600 hours. Weekend and overtime work needs advance approval. Price for a slower schedule and for days lost waiting on approval.“Regular Work Hours: Monday – Friday from 0700 – 1600 hours.” 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf, page 12
- Locksmith cost on you. You must price and pay a GSA-certified locksmith to remove and reinstall the Equipment Room main door lock and Hoffman box. Get a locksmith quote before you bid.“Contractor must include their bid cost to coordinate and pay for a GSA-certified locksmith to remove it and reinstall it in the new door.” 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf, page 8
- Ceiling tile count differs. Section 01 11 00 asks for 6 extra ceiling tiles for FAA use, but Section 09 51 00 asks for 12. Ask the RE/COR which number to price.“Near the end of construction contract, provide 12 new ceiling tiles” 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf, page 148
- 72-hour utility notice. Utility interruptions need 72 hours notice to the RE/COR and written permission before work starts. Plan any shutdowns early and do not count on short-notice outages.“Notify the RE/COR 72 Hours prior to proposed utility interruptions or outage.” 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf, page 12
Key terms
| Who can bid | Small businesses only (total set-aside)The size standard for NAICS 236220 is not stated in the notice. Check it on SAM.gov before you bid.SAM.gov record |
|---|---|
| Contract type | Construction repair workCoded under NAICS 236220 and PSC Z2BC in the SAM.gov record.SAM.gov record |
How to respond
- Where to send: Not stated in the notice text or SAM.gov record.
- Format and required contents: Not stated in the text provided.
- Due: Wednesday, December 23, 2026, 17:00 (UTC-06:00), per the SAM.gov record.
- Before you send anything, read Amendment 1 on SAM.gov, because it replaces the original scope of work.
Attached files
- 1703883 QNA ARSR Scope of Work Repair Building Morales TX 2026 Sept 22.pdf Older version, not read.
- 6973GH-27-R-00042.pdf Not read: over our length limit.
- 1703883 QNA ARSR Amendment 1 Repair Building Morales TX 2026 Sept 22.pdf Not read: over our length limit.
- SECTION 01 01 11 Summary of Work QNA ARSR Morales TX 2026 September 22.pdf Not read: over our length limit.
- 1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdfProject specifications that set the work, materials and rules; you must read and price them, and pages 69-144 were not provided to this review. Read in part (pages 1–68 and 145–178 of 178).
- SECTION 08 71 00 Door Hardware with Schedule QNA ARSR 2026 Sept 22.pdf Not read: over our length limit.
- QNA ARSR DESIGN DRAWINGS JCN 1703883.pdfDesign drawing set; the text we could read shows only engineer signature stamps, so you must read the drawings yourself for layout and dimensions. Read.
Not stated in what we read
- Amendment 1 to the Scope of Work, which replaces the original scope file: you could not review it here, and you must read it on SAM.gov before you price.
- Specification pages 69-144 and Section 08 71 00 Door Hardware with Schedule, which may cover water repellent, joint sealants and door hardware: you could not review them, and you must read them on SAM.gov.
- Contract length: the notice says only that work must finish within the duration approved in the contract schedule.
- Estimated value or budget for the contract.
- How and where to submit your offer, and what it must include.
- How offers are judged, and any license, bonding, insurance or security clearance you need.
Notice text
Contractor shall provide all plant, labor, materials and equipment necessary to fully meet all requirements of this Summary of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled: JCN 1703883. QNA ARSR. Repair Building and Exterior Items, Correct Water Damage and Prevent Water Intrusion, Morales (Hallettsville) TX. Project Identification: JCN 1703883 QNA ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX. a. Project Location: about 12 miles south of Hallettsville TX. b. Access road through 2nd gate on left pass bridge off CR-12. c. Coordinates are 29°20'28.71"N, 96°52'19.69"W or 29.341420, -96.871910
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Edward Wright, edward.b.wright@faa.gov, 4059540693
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Federal Aviation Administration for the same kind of work (NAICS 236220, service code Z2BC) in Texas that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Replace Chillers 100, 200, and 300 at Houston Artcc.Sergents Mechanical Systems Inc · 697DCK25C00282 | $4,263,236 | Dec 31, 2026in 1 month | TX |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 23, 5:00 PM CT32 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of the NavyBoat maintenance facility, Buliluyan, Palawan, Philippines
- Department of the ArmyGIS lab for Maun, Botswana
- Department of Veterans AffairsBathroom renovation in Building 103, Danville, IL
- Departmental OfficesMN-FWS Tamarac VC Parking Seal Coat
- Departmental OfficesDeck handrail and stair replacement, Fergus Falls, MN
- Department of the ArmyBuilding 129 lunch and locker room rebuild, McAlester, OK
- Public Buildings ServiceUSCG ISA Tenant Improvement Construction Project
- Department of Veterans AffairsProject 629-25-104 ED Suicide Risk Mitigation Fence
Free · at most one email a morning
Get new notices from Federal Aviation Administration by email
Each morning we'll send the new solicitations and sources-sought notices from Federal Aviation Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy