Salt barn replacement at Batavia VA Medical Center, NY
The VA wants a contractor to demolish an existing salt barn and build a new one at the Batavia VA Medical Center, including concrete walls and pad, a 30 by 60 foot steel roof, and electrical work.
Official title: Y1DA--NRM-CONST | 528A4-27-202 Salt Barn Batavia | FY27 NRM
- Deadline
- Dec 7, 11:00 AM ET
- 12 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: 242-Network Contract Office 02 (36C242)
What they're buying
Plan for 240 calendar days from notice to proceed, but the bid pricing sheet says 420 days.
Top catches
“This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set aside procurement” 36C24227B0008_1.docx
The SAM.gov record shows no set-aside, but the solicitation is limited to SBA-certified SDVOSBs. Bid only if you are registered in SAM and certified as an SDVOSB in SBA's search at the time you bid.
“BID due TIME IS 10:30AM EASTERN MONDAY DECEMBER 7 2026” 36C24227B0008 0001.docx
Amendment 0001 sets the bid due time at 10:30 AM Eastern, but the SAM.gov record shows 11:00 AM. Treat 10:30 AM as the cutoff, email your bid well before then, and confirm the time with the contracting officer.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 8 of 35 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish the existing salt barn, its concrete pad and a downed tree, then remove all debris from VA property.
- Excavate, place 18 inches of crushed stone with geotextile, and build a new asphalt driveway that ties into existing asphalt.
- Pour 12-inch concrete walls on three sides with footers below the frost line, a 5,000 psi air-entrained slab, and two coats of sealer, with third-party testing.
- Install a 30 by 60 foot steel roof on anchors set into the walls, with the north end closed and roof panels designed to the Steel Master R30-15 drawings or an approved equal.
- Provide electrical work: a 100-amp, 3-phase, 208/120 volt NEMA 4X panel, junction boxes, conduit and conductors, eight LED strip lights, and motion sensors.
- Install lightning protection to NFPA 780, UL 96A and LPI 175, and run a utility survey with electromagnetic and ground penetrating radar before digging.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- SDVOSB set-aside conflicts with SAM. The SAM.gov record shows no set-aside, but the solicitation is limited to SBA-certified SDVOSBs. Bid only if you are registered in SAM and certified as an SDVOSB in SBA's search at the time you bid.
- Bid time differs by source. Amendment 0001 sets the bid due time at 10:30 AM Eastern, but the SAM.gov record shows 11:00 AM. Treat 10:30 AM as the cutoff, email your bid well before then, and confirm the time with the contracting officer.
- Contract period conflicts: 240 vs 420 days. The scope and the SF 1442 say 240 days, but the bid pricing sheet says 420 days. Ask the contracting officer in writing which period applies before you price labor, equipment and overhead.“The Contract period of performance for Base Bid construction shall be 420 calendar days from Notice to Proceed (NTP).” 36C24227B0008_1.docx
- Only site visit has passed. The only pre-bid site visit was Tuesday, November 17, 2026 at 10 AM, and it has passed. If you did not attend, ask the contracting officer in writing whether you can see the site before you price the work.“NOTE: NO OTHER SITE VISITS WILL BE ALLOWED.” 36C24227B0008_1.docx
- Bid bond required at 20 percent. Any bid over $150,000 needs a bid bond of at least 20 percent of the bid price, capped at $3,000,000. For a bid near the $500,000 to $1,000,000 range, that is roughly $100,000 to $200,000, so talk to your surety before bid day.“A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.” 36C24227B0008_1.docx
- Certificates must come with the bid. The Buy American certificate, the limitations on subcontracting certificate and the safety and EMR information must be submitted with your bid. The VA says offers without the limitations on subcontracting certificate are not considered.“The signed certificates must be received with the bid” 36C24227B0008_1.docx
Key terms
| Who can bid | SBA-certified service-disabled veteran-owned small businesses (SDVOSB) onlyThe SAM.gov record does not state a set-aside, but the solicitation does.36C24227B0008_1.docx |
|---|---|
| Contract period | 240 calendar days from Notice to ProceedThe bid pricing sheet says 420 calendar days from Notice to Proceed.36C24227B0008_1.docx |
| How to submit | Email to nicholas.winne@va.govNo hand-carried or mailed bids will be accepted.36C24227B0008_1.docx |
| Questions due | Monday, November 30, 2026, 12 PM (time zone not stated)Send questions in writing to nicholas.winne@va.gov.36C24227B0008_1.docx |
| Estimated value | Between $500,000 and $1,000,000This is the magnitude of construction stated in the solicitation.36C24227B0008_1.docx |
| Contract type | Firm fixed priceThe government contemplates a firm fixed price contract.36C24227B0008_1.docx |
| Site visit | Passed: Tuesday, November 17, 2026, 10 AMThe sign-in sheet is a scanned PDF that we could not read.36C24227B0008_1.docx |
How to respond
- Sign and acknowledge amendments 0001 and 0002 and include the acknowledgment with your bid.
- Email the complete bid to nicholas.winne@va.gov so it is timestamped before 10:30 AM Eastern on Monday, December 7, 2026, and include a copy of the bid bond.
- Include the completed bid sheet, signed FAR 52.225-2 Buy American certificate, signed VAAR 852.219-75 limitations on subcontracting certificate, and your safety and environmental violation statement with EMR letter on insurer letterhead.
- Send any written questions to Nicholas Winne by 12 PM on Monday, November 30, 2026. The bid opening is at 11:00 AM Eastern on Microsoft Teams, or by phone at 1-347-566-4838 with conference ID 237 354 567#.
Attached files
From SAM.gov. Download links open the original files.
- 36C24227B0008 0002.docxAmendment 0002 posting the site visit sign-in sheet; you must read it and acknowledge it. Read.
- FAR 52.225-2 Buy American Certification.pdfBuy American certificate that you must complete, list any foreign end products, and sign with your bid. Read.
- 852.236-72_Performance of Work by the Contractor - effective 01 Oct 2026.docxClause requiring a statement of the work you will perform with your own forces, submitted with your schedule; you must read and comply. Read.
- 852.236-80_Subcontracts and Work Coordination - effective 01 Oct 2026.docx Not read: over our length limit.
- Salt Barn Batavia Sign in Sheet.pdf Scanned image, not read.
- 852.232-70 Payments Under Fixed-Price Construction Contracts Without NAS-CPM- effective 01 Oct 2026.docx Not read: over our length limit.
- 36C24227B0008_1.docxThe solicitation with the SF 1442, bid pricing sheet, certifications and scope of work; you must complete and sign the forms and price the work. Only the start was provided. Read in part.
- 36C24227B0008 0001.docxAmendment 0001 changing the bid due time to 10:30 AM and the opening to 11 AM; you must acknowledge it. Read.
27 more files from ZIP archives, 3 read
- 03 30 00 CIP concrete.docx Not read: over our length limit.
- 07 92 00 joint sealants.docx Not read: over our length limit.
- 010000-GENERAL REQUIREMENTS.docxGeneral requirements covering site visits by appointment, badges, utility interruption notice, phasing and warranty; you must read and price it. Read.
- 013323-SHOP DRAWINGS.docx Not read: over our length limit.
- 013526-SAFETY.docx Not read: over our length limit.
- 014529 Testing and Lab Services.docx Not read: over our length limit.
- 015719-Temp Enviro Controls.docx Not read: over our length limit.
- 017419-CONSTRUCTION WASTE MANAGEMENT.docx Not read: over our length limit.
- 022113-SITE SURVEYS.docxSurvey requirements for utilities and accuracy, including GPS-marked drawings of buried utilities; you must follow it and price it. Read.
- 024100-DEMOLITION.docx Not read: over our length limit.
- 260511-REQ FOR ELEC INSTALL.docx Not read: over our length limit.
- 260519-LOW VOLTAGE POWER COND AND CABLE.docx Not read: over our length limit.
- 260526-GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.docx Not read: over our length limit.
- 260533-RACEWAY AND BOXES FOR ELECTRICAL.docx Not read: over our length limit.
- 260541-UNDERGROUND ELECTRICAL.docx Not read: over our length limit.
- 262416-PANELBOARDS.docx Not read: over our length limit.
- 264100-LIGHTNING PROTECTION.docx Not read: over our length limit.
- 312011 Earthwork Short Form.docx Not read: over our length limit.
- 321216-ASPHALT.docx Not read: over our length limit.
- 01321615-PROJECT SCHEDULES.docx Not read: over our length limit.
- GalvalumePlusSpec.pdf Not read: over our length limit.
- SteelMaster Buildings Spec EW.pdfRoof manufacturer specification for steel, coatings and hardware, which you must price to or match with an approved equal. Only part was provided. Read.
- CS101-CIVIL SITE PLAN-Site New.pdf Not read: over our length limit.
- CD101-CIVIL SITE PLAN-Site Demo.pdf Not read: over our length limit.
- R30-15 Profile Drawing.pdf Scanned image, not read.
- R30-15 Connector Drawing.pdf Scanned image, not read.
- CS601 - CIVIL SITE DETAILS-Layout.pdf Not read: over our length limit.
Not stated in what we read
- Whether the site is on the north or south side of the Batavia campus, since the scope says both.
- Whether you can still see the site after the November 17 visit, and what the sign-in sheet in amendment 0002 says.
- Which wage determination applies to this work, if any, since it is not in the provided text.
- Liquidated damages, payment terms and how award is made, since these sections were not provided.
- Civil site plans CS-101, CD-101 and CS-601 and the Steel Master profile and connector drawings were not reviewed. You must read them before pricing.
Notice text
SITE VISIT SIGN IN SHEET
As published on SAM.gov.
Contacts
- Nicholas Winne, Contracting Officer, nicholas.winne@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 7, 11:00 AM ET12 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of the Air ForceBase repair and minor construction, Wright-Patterson AFB, OH
- Department of the ArmyMaintenance building at C and D Canal, Chesapeake City, MD
- Department of the NavyLab and test building at Philadelphia Navy Yard, PA
- Forest ServiceNew lookout cab and power at Barillas Peak, NM
- Department of Veterans AffairsParking garage repair and redesign in Reno, Nevada
- Department of the Air ForceEnlisted dormitory construction at Kirtland AFB, NM
- Public Buildings ServiceKitchenette refresh at Weinberger Courthouse, San Diego, CA
- Department of Veterans AffairsFY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy