1. Opportunities
  2. Department of Veterans Affairs
  3. 36C24227B0008

Salt barn replacement at Batavia VA Medical Center, NY

The VA wants a contractor to demolish an existing salt barn and build a new one at the Batavia VA Medical Center, including concrete walls and pad, a 30 by 60 foot steel roof, and electrical work.

Official title: Y1DA--NRM-CONST | 528A4-27-202 Salt Barn Batavia | FY27 NRM

Deadline
Dec 7, 11:00 AM ET
12 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: 242-Network Contract Office 02 (36C242)

What they're buying

Plan for 240 calendar days from notice to proceed, but the bid pricing sheet says 420 days.

Top catches

SDVOSB set-aside conflicts with SAM
“This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set aside procurement” 36C24227B0008_1.docx

The SAM.gov record shows no set-aside, but the solicitation is limited to SBA-certified SDVOSBs. Bid only if you are registered in SAM and certified as an SDVOSB in SBA's search at the time you bid.

Bid time differs by source
“BID due TIME IS 10:30AM EASTERN MONDAY DECEMBER 7 2026” 36C24227B0008 0001.docx

Amendment 0001 sets the bid due time at 10:30 AM Eastern, but the SAM.gov record shows 11:00 AM. Treat 10:30 AM as the cutoff, email your bid well before then, and confirm the time with the contracting officer.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 8 of 35 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Demolish the existing salt barn, its concrete pad and a downed tree, then remove all debris from VA property.
  • Excavate, place 18 inches of crushed stone with geotextile, and build a new asphalt driveway that ties into existing asphalt.
  • Pour 12-inch concrete walls on three sides with footers below the frost line, a 5,000 psi air-entrained slab, and two coats of sealer, with third-party testing.
  • Install a 30 by 60 foot steel roof on anchors set into the walls, with the north end closed and roof panels designed to the Steel Master R30-15 drawings or an approved equal.
  • Provide electrical work: a 100-amp, 3-phase, 208/120 volt NEMA 4X panel, junction boxes, conduit and conductors, eight LED strip lights, and motion sensors.
  • Install lightning protection to NFPA 780, UL 96A and LPI 175, and run a utility survey with electromagnetic and ground penetrating radar before digging.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • SDVOSB set-aside conflicts with SAM. The SAM.gov record shows no set-aside, but the solicitation is limited to SBA-certified SDVOSBs. Bid only if you are registered in SAM and certified as an SDVOSB in SBA's search at the time you bid.
  • Bid time differs by source. Amendment 0001 sets the bid due time at 10:30 AM Eastern, but the SAM.gov record shows 11:00 AM. Treat 10:30 AM as the cutoff, email your bid well before then, and confirm the time with the contracting officer.
  • Contract period conflicts: 240 vs 420 days. The scope and the SF 1442 say 240 days, but the bid pricing sheet says 420 days. Ask the contracting officer in writing which period applies before you price labor, equipment and overhead.“The Contract period of performance for Base Bid construction shall be 420 calendar days from Notice to Proceed (NTP).” 36C24227B0008_1.docx
  • Only site visit has passed. The only pre-bid site visit was Tuesday, November 17, 2026 at 10 AM, and it has passed. If you did not attend, ask the contracting officer in writing whether you can see the site before you price the work.“NOTE: NO OTHER SITE VISITS WILL BE ALLOWED.” 36C24227B0008_1.docx
  • Bid bond required at 20 percent. Any bid over $150,000 needs a bid bond of at least 20 percent of the bid price, capped at $3,000,000. For a bid near the $500,000 to $1,000,000 range, that is roughly $100,000 to $200,000, so talk to your surety before bid day.“A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.” 36C24227B0008_1.docx
  • Certificates must come with the bid. The Buy American certificate, the limitations on subcontracting certificate and the safety and EMR information must be submitted with your bid. The VA says offers without the limitations on subcontracting certificate are not considered.“The signed certificates must be received with the bid” 36C24227B0008_1.docx

Key terms

Who can bidSBA-certified service-disabled veteran-owned small businesses (SDVOSB) onlyThe SAM.gov record does not state a set-aside, but the solicitation does.36C24227B0008_1.docx
Contract period240 calendar days from Notice to ProceedThe bid pricing sheet says 420 calendar days from Notice to Proceed.36C24227B0008_1.docx
How to submitEmail to nicholas.winne@va.govNo hand-carried or mailed bids will be accepted.36C24227B0008_1.docx
Questions dueMonday, November 30, 2026, 12 PM (time zone not stated)Send questions in writing to nicholas.winne@va.gov.36C24227B0008_1.docx
Estimated valueBetween $500,000 and $1,000,000This is the magnitude of construction stated in the solicitation.36C24227B0008_1.docx
Contract typeFirm fixed priceThe government contemplates a firm fixed price contract.36C24227B0008_1.docx
Site visitPassed: Tuesday, November 17, 2026, 10 AMThe sign-in sheet is a scanned PDF that we could not read.36C24227B0008_1.docx

How to respond

  1. Sign and acknowledge amendments 0001 and 0002 and include the acknowledgment with your bid.
  2. Email the complete bid to nicholas.winne@va.gov so it is timestamped before 10:30 AM Eastern on Monday, December 7, 2026, and include a copy of the bid bond.
  3. Include the completed bid sheet, signed FAR 52.225-2 Buy American certificate, signed VAAR 852.219-75 limitations on subcontracting certificate, and your safety and environmental violation statement with EMR letter on insurer letterhead.
  4. Send any written questions to Nicholas Winne by 12 PM on Monday, November 30, 2026. The bid opening is at 11:00 AM Eastern on Microsoft Teams, or by phone at 1-347-566-4838 with conference ID 237 354 567#.

Attached files

From SAM.gov. Download links open the original files.

27 more files from ZIP archives, 3 read
  • 03 30 00 CIP concrete.docx Not read: over our length limit.
  • 07 92 00 joint sealants.docx Not read: over our length limit.
  • 010000-GENERAL REQUIREMENTS.docxGeneral requirements covering site visits by appointment, badges, utility interruption notice, phasing and warranty; you must read and price it. Read.
  • 013323-SHOP DRAWINGS.docx Not read: over our length limit.
  • 013526-SAFETY.docx Not read: over our length limit.
  • 014529 Testing and Lab Services.docx Not read: over our length limit.
  • 015719-Temp Enviro Controls.docx Not read: over our length limit.
  • 017419-CONSTRUCTION WASTE MANAGEMENT.docx Not read: over our length limit.
  • 022113-SITE SURVEYS.docxSurvey requirements for utilities and accuracy, including GPS-marked drawings of buried utilities; you must follow it and price it. Read.
  • 024100-DEMOLITION.docx Not read: over our length limit.
  • 260511-REQ FOR ELEC INSTALL.docx Not read: over our length limit.
  • 260519-LOW VOLTAGE POWER COND AND CABLE.docx Not read: over our length limit.
  • 260526-GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.docx Not read: over our length limit.
  • 260533-RACEWAY AND BOXES FOR ELECTRICAL.docx Not read: over our length limit.
  • 260541-UNDERGROUND ELECTRICAL.docx Not read: over our length limit.
  • 262416-PANELBOARDS.docx Not read: over our length limit.
  • 264100-LIGHTNING PROTECTION.docx Not read: over our length limit.
  • 312011 Earthwork Short Form.docx Not read: over our length limit.
  • 321216-ASPHALT.docx Not read: over our length limit.
  • 01321615-PROJECT SCHEDULES.docx Not read: over our length limit.
  • GalvalumePlusSpec.pdf Not read: over our length limit.
  • SteelMaster Buildings Spec EW.pdfRoof manufacturer specification for steel, coatings and hardware, which you must price to or match with an approved equal. Only part was provided. Read.
  • CS101-CIVIL SITE PLAN-Site New.pdf Not read: over our length limit.
  • CD101-CIVIL SITE PLAN-Site Demo.pdf Not read: over our length limit.
  • R30-15 Profile Drawing.pdf Scanned image, not read.
  • R30-15 Connector Drawing.pdf Scanned image, not read.
  • CS601 - CIVIL SITE DETAILS-Layout.pdf Not read: over our length limit.

Download the archives from SAM.gov: archive 1, archive 2.

Not stated in what we read

  • Whether the site is on the north or south side of the Batavia campus, since the scope says both.
  • Whether you can still see the site after the November 17 visit, and what the sign-in sheet in amendment 0002 says.
  • Which wage determination applies to this work, if any, since it is not in the provided text.
  • Liquidated damages, payment terms and how award is made, since these sections were not provided.
  • Civil site plans CS-101, CD-101 and CS-601 and the Steel Master profile and connector drawings were not reviewed. You must read them before pricing.

Notice text

SITE VISIT SIGN IN SHEET

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy