Torpedo test lab and office, Naval Station Newport, RI
Build a 12,920 SF steel-frame torpedo test laboratory and office at Naval Station Newport, RI, with site work, utilities and parking.
Official title: P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI
- Deadline
- Dec 1, 2:00 PM ET
- 7 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Newport, RI
- Buyer: Navfacsyscom Mid-Atlantic
What they're buying
A priced option adds a 17,978 SF P1016 lab and demolishes Building 1272T, and the work runs 901 calendar days after award.
Top catches
“Response deadline: 2026-12-01T14:00:00-05:00” SAM.gov record
SAM shows 1 Dec 2026 at 2:00 PM, but Amendment 0007 set 24 Nov 2026, which is today. Email Demetrice Jenkins today to confirm the exact closing date and time before you spend more time on the bid.
“Offerors that do not include a signed Project Labor Agreement complying with the terms of FAR 52.222-33” Notice text
A signed Project Labor Agreement must come in with your price proposal, or your offer is ruled out. Start that agreement now and check that its terms let all firms and subcontractors compete, whether or not they have union agreements, as Amendment 0003 asks.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 27 of 49 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Build a 12,920 SF multi-story steel frame lab and office on a shallow foundation
- Metal standing seam roof with masonry and metal panel exterior walls
- Site work: underground stormwater retention, drainage, parking, exterior lighting and landscaping
- Mechanical, electrical and telecommunications utilities, plus Option Item 4 steam modifications
- Option for the P1016 lab (17,978 SF), including demolition of Building 1272T (548 m2)
- Priced unit lines: 3,000 CY undercut, 8,000 tons contaminated soil, 100,000 gallons contaminated water, 500 tons buried debris
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Due date conflicts with amendment. SAM shows 1 Dec 2026 at 2:00 PM, but Amendment 0007 set 24 Nov 2026, which is today. Email Demetrice Jenkins today to confirm the exact closing date and time before you spend more time on the bid.
- Signed labor agreement due with bid. A signed Project Labor Agreement must come in with your price proposal, or your offer is ruled out. Start that agreement now and check that its terms let all firms and subcontractors compete, whether or not they have union agreements, as Amendment 0003 asks.
- Asbestos work priced at full length. You must price all the listed trench cover mastic and pipe insulation as if all of it contains asbestos. Work done before NUWC approves the test results is at your cost, so build testing and approval time into your price and schedule.“assuming that 100% of the specified lengths of mastic and pipe insulation contain asbestos” 02 82 00.pdf, page 1
- Undercut line may cover all excavation. Amendment 0008 says line 0001B covers all site excavation, not only the undercut. Ask in writing whether the 3,000 CY quantity is the full excavation basis, and which sheet applies, because the price form says CD103 while an Amendment 0008 note says CD102.“but all site excavation for the project” Amendment 0008 N4008526R0178.pdf, page 4
- Submission route is unclear. The notice does not clearly name where to send sealed offers. Attachment B describes the PIEE portal, which needs a Proposal Manager role to submit, so register and get account approval early, then confirm the upload route with the contracting officer.“The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module.” Attachment B - PIEE Vendor Access Instructions.pdf, page 1
Key terms
| Who can bid | Any firm; no set-aside statedNotice says unrestricted. Project Labor Agreement and CMMC rules still apply.Notice text |
|---|---|
| Contract period | 901 calendar days after awardStart within 15 calendar days of award or notice to proceed.Solicitation - N4008526R0178.pdf, page 1 |
| How they choose | Total price, including all optionsItems 3 to 11 are checked for responsibility and not priced.Amendment 0003 N4008526R0178.pdf, page 2 |
| How to submit | Unclear; PIEE portal likelyAttachment B says a PIEE Proposal Manager role is needed to submit.Attachment B - PIEE Vendor Access Instructions.pdf, page 1 |
| Contract type | Design-bid-build constructionBase price for the whole work, plus unit price lines for soil, water and debris.Notice text |
| Site visit | 2 Sep 2026, 1000 EST (passed)Visitor request was due 28 Aug 2026. Bring photo ID, and access needs a visitor request.Amendment 0001 - N4008526R0178 .pdf, page 3 |
How to respond
- Email Demetrice Jenkins at demetrice.jenkins2.civ@us.navy.mil to confirm the closing date and time in writing, since the sources conflict.
- Register in PIEE with a Proposal Manager role and your CAGE code, and submit through PIEE unless the contracting officer names another route. The only address shown is NAVFAC Mid-Atlantic, 9324 Virginia Avenue, Norfolk, VA 23511-0395, but the notice does not clearly say where to send offers.
- Put a signed Project Labor Agreement, the Attachment H price form, a bank reference, three years of financial statements, a facilities and equipment list, and an other-work list in your price proposal. Keep your prices open for at least 120 calendar days after the due date.
- Send the original and 1 copies in sealed envelopes marked with your name, address, solicitation number N4008526R0178, and the due date and time.
- Acknowledge every amendment on the SF 30 form or in your offer, because the notice says a missing acknowledgment may result in rejection.
Attached files
From SAM.gov. Download links open the original files.
- Amendment 0001 - N4008526R0178 .pdfSets the site visit rules and the visitor request process; read it and acknowledge it. Read in part (pages 1–4 of 5).
- P-1016 Amendment 0008 - Continuation.pdfCover note listing one P1016 drawing change to the site excavation detail; read it. Read.
- P1016_Civil C-131.pdfSite layout drawing for P1016 with alternate bid items for demolition and a parking lot; read it for scope. Read.
- 02 82 00.pdfAsbestos remediation specification that you must price at full trench mastic and pipe insulation lengths; read and price it. Read in part (pages 1–2 and 29 of 29).
- 33 63 13.pdfUnderground steam distribution specification with temperature sensor and thermal test rules; read only. Read in part (pages 1–2 and 20–21 of 21).
- Attachment I - SECNAV FORM 5512.pdf Not read: over our length limit.
- Amendment 0007 N4008526R0178.pdfAdds the revised CMMC DFARS clause and moves the due date from 17 Nov to 24 Nov 2026; read and acknowledge it. Read in part (pages 1–2 of 7).
- Solicitation - N4008526R0178.pdfSF 1442 cover with the original 13 Oct 2026 due date and the 120 day acceptance rule; read it and complete the offer block. Read in part (pages 1 and 61–63 of 63).
- Amendment 0009 N4008526R0178.pdfAmendment cover page plus pre-proposal answers on CMMC scope; read the answers and acknowledge it. Read.
- 01 33 00.pdfSubmittal rules and MEP coordination meeting requirements; read only. Read in part (pages 1–2 and 20–21 of 21).
- P-1016 Amendment 0006 - Continuation.pdf Older version, not read.
- Attachment E- Historical Small Business Utilization.docx Not read: over our length limit.
- Amendment 0002 - N4008526R0178.pdf Scanned image, not read.
- Attachment A - Pre-Proposal Inquiry Log Template.xlsxForm for submitting pre-proposal questions; fill it in if you have questions. Read.
- Attachment J - WD RI20260001 7-30-2026.pdf Not read: over our length limit.
- Amendment 0005 N4008526R0178.pdfMoved the due date to 10 Nov 2026, since superseded; read only. Read.
- NUWC P-1016 - Drawings.pdf Could not be read.
- NUWC P084 - Drawings.pdf Could not be read.
- Amendment 0004 N4008526R0178.pdfShows only the blank amendment form with no visible changes; read it and acknowledge it. Read.
- 00 01 15.pdfList of P084 drawings; read it to see which sheets apply. Read in part (pages 1–5 and 13–15 of 15).
- Amendment 0003 N4008526R0178.pdfAdds the signed Project Labor Agreement rule and the financial and facilities items to submit; read and acknowledge it. Read.
- Amendment 0004 PPI Responses.pdf Older version, not read.
- 07 27 10 Building Air Barrier System.pdf Not read: over our length limit.
- Attachment H -Price Proposal Form_Rev 1.docx Older version, not read.
- NUWC P-1016 - Specifications.pdfPartial P1016 specification with crane testing and training rules; read only. Read in part (pages 1–3 and 2656–2657 of 2657).
- High Performance and Sustainable Building Checklist.pdf Scanned image, not read.
- 28 10 05.pdfSecurity systems specification with operator and maintenance training requirements; read it for pricing. Read in part (pages 1–3 and 44–45 of 45).
- Attachment D- Past Performance Questionnaire.docx Not read: over our length limit.
- Amendment 0008 N4008526R0178.pdfPre-proposal answers on excavation, drawings and the price form; read them and acknowledge it. Read in part (pages 1–4 of 5).
- Amendment 0006 PPI Responses.pdf Not read: over our length limit.
- 01 30 00.pdfAdministrative rules covering insurance per FAR 28.307-2, superintendent qualifications and a meeting within 35 days of award; read it. Read in part (pages 1–3 and 5 of 5).
- 23 07 00.pdfMechanical insulation specification; read only. Read in part (pages 1–3 and 41 of 41).
- Attachment B - PIEE Vendor Access Instructions.pdfStep-by-step PIEE registration guide; complete it if you will submit through PIEE. Read.
- Attachment H -Price Proposal Form.docx Older version, not read.
- P-084 Amendment 0006 - Continuation.pdf Not read: over our length limit.
- Attachment C- Construction Experience Project Data.docxProject data sheet to fill in for each past job you cite as experience. Read.
- NUWC P084 - Specifications.pdfPartial P084 specification with crane installation and testing rules; read only. Read in part (pages 1–3 and 2520–2521 of 2521).
- Attachment G - Individual SB Subcontracting Plan.docx Not read: over our length limit.
- JA ML2681 26R0178 Redacted.pdf Not read: over our length limit.
- P084 - Amendment 006 Drawings.pdf Not read: over our length limit.
- P1016-C-503.pdf Not read: over our length limit.
- Attachment H -Price Proposal Form_Rev 2.pdfPrice schedule you must fill in with lump-sum and unit prices for each line. Read in part (pages 1–3 and 9 of 9).
- P-084 Amendment 0008 - Drawings R1.pdf Not read: over our length limit.
- Attachment J - WD RI20260001 10-1-26.pdf Not read: over our length limit.
- Attachment F-Small Business Participation Commitment.docx Not read: over our length limit.
- P-084 Amendment 0008 - Continuation Doc R1.pdfCover note listing P084 drawing edits, including the price line sheet change to CD102; read it. Read.
- Amendment 0006 N4008526R0178.pdfMoves the due date to 17 Nov 2026, updates the wage determination and explains how to request the CUI security plan; read and acknowledge it. Read.
- 23 22 26.00 20.pdfSteam piping specification with test pressures and a 14 day test notice rule; read only. Read in part (pages 1–3 and 18–19 of 19).
- 32 31 13.53.pdfHigh-security fence specification; read only. Read in part (pages 1–3 and 8–9 of 9).
Not stated in what we read
- Current wage rates: Attachment J (WD RI20260001, 10-1-26) was not included and I could not review it. Amendment 0006 says it replaces the 7-30-2026 version, so you must read and price the newer one.
- Whether performance and payment bonds are required. The Yes or No answer is not readable in the text, and the form lists 10 calendar days after award.
- Total estimated contract value. Only option estimates appear: $539,503 for FF&E and $125,000 for A/V.
- Whether another site visit is offered. The 2 Sep 2026 visit has passed, and the text does not say whether attendance was required.
- The Project Labor Agreement form and the P1016 Construction Security Plan. The plan is CUI and must be requested by email from Demetrice Jenkins.
- Whether a small business subcontracting plan is required. Attachments E, F and G were not included, so you must read them.
Notice text
Project Title/Location: DESIGN-BID-BUILD P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI SOLICITATION NO. N4008526R0178 This acquisition is being solicited on an unrestricted basis with full and open competition. THIS SOLICITATION INCLUDES CMMC LEVEL 1 (SELF) REQUIREMENTS IN ACCORDANCE WITH DFARS 252.204-7025 (DEVIATION 2026-0038) AND 252.204-7021 (DEVIATION 2026-0038). This project is considered a “Large-scale Construction Project” as defined in FAR 22.502 (DEVIATION 2026-O0040).
Accordingly, the requirements of FAR Subpart 22.5 (DEVIATION 2026-O0040) will apply. The Offeror shall submit a signed Project Labor Agreement with their Price Proposal submission, in accordance with FAR Provision 52.222-33 (DEVIATION 2026-O0038) and FAR Clause 52.222-34 (DEVIATION 2026-O0038). Offerors that do not include a signed Project Labor Agreement complying with the terms of FAR 52.222-33 (DEVIATION 2026-O0038) and 52.222-34 (DEVIATION 2026-O0038) shall be considered nonresponsive and ineligible for award.
All correspondence regarding this solicitation shall be directed via email to Demetrice Jenkins at demetrice.jenkins2.civ@us.navy.mil. Description of Work: This design-bid-build project will include the construction of a multi-story steel frame 12,920 SF laboratory and office facility. The facility will support a variety of functions including depot level testing of critical torpedo systems. Construction consists of a steel frame building with a shallow foundation, metal standing seam roof and masonry and metal panel exterior walls.
The project includes all pertinent site preparations and site improvements, including underground stormwater retention system, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking and exterior lighting. For Option 1, P1016 Consolidated RDT&E Systems Facility, this project will include the construction of a multi-story 17,978 SF laboratory facility supported by shallow foundations. The facility will utilize structural steel framing with a standing-seam roof.
Exteriors are planned as a combination of masonry veneer and metal panel siding. Demolition includes removal of Building 1272T, a 548 m2 engineering facility.
As published on SAM.gov.
Contacts
- Demetrice Jenkins, demetrice.jenkins2.civ@us.navy.mil, 7573411973
- Catharine Keeling, catharine.a.keeling.civ@us.navy.mil, 7573410150
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 2:00 PM ET7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of Veterans AffairsHistoric lodge renovation at Fort McPherson, Maxwell, NE
- Department of Veterans AffairsRemodel ENT procedure rooms, Jesse Brown VA, Chicago, IL
- Department of Veterans AffairsFlooring and X-ray electrical work at Bath VA, NY
- Department of the ArmyNotice to Industry - LVN B95 Fire Station Addition
- Department of the ArmyNotice to Industry - LVN B95 Fire Station Addition
- Office of the Assistant Secretary for Administration and ManagementRoof, HVAC and seismic upgrades at Clearfield Job Corps, UT
- Department of the NavySteam plant design-build at NSA Bethesda, MD
- Department of Veterans AffairsReplace flooring and paint in Building 650, Mather, CA
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy