1. Opportunities
  2. Department of Homeland Security
  3. US Coast Guard
  4. 31040RFQ270000084

Switchgear service and battery swap, Portsmouth, VA

You would clean, inspect and service the main switchgear at USCG Base Portsmouth, replace four 12-volt control batteries and check the DC charger.

Official title: Provide service for main switch gear cleaning, visual inspection, breaker servicing, battery replacement and DC control power maintenance located at USCG Base Portsmouth

Deadline
Dec 8, 5:00 PM ET
13 days left
Who can bid
Small businesses
Size standard for NAICS 811310: $12.5 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Portsmouth, VA
Buyer: Base Portsmouth

What they're buying

It is a firm-fixed price order open only to small businesses, to be done within 15 working days after award.

Top catches

Lockout work conflict
“A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.” Statement of Work (SOW).pdf, page 5

Section 1.1 says you apply facility-approved lockout protocols, but section 5.1 says contractors do not perform lockout and tagout here. Ask the QAE who performs it and when, and price any Facilities Division coordination.

Wage determination not readable
“This statement is for information only: it is not a wage determination” FAR Clauses and Deviations Services.pdf, page 10

The wage determination file is a scanned image, so we could not review it and you must read it yourself. The only labor rate in the text is a WG-10 electrician at 29.45 dollars plus 5.92 dollars in health and welfare, which the clause says is for information only, so price labor from the wage determination.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 4 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Vacuum and clean switchgear exterior panels, louvers, filters, doors, interior compartments, breaker frames, arc chutes and busbar supports.
  • Rack out the 1200A main breaker, three 1200A feeder breakers and one 1200A generator breaker, then inspect stabs, contacts, arc chutes and charging mechanisms.
  • Provide an inspection report to the USCG.
  • Remove four 12V 32A control batteries, recycle them with recycling manifests, then supply and install four new OEM-equivalent 12V 32A batteries with cleaning, anti-corrosion treatment and torque checks.
  • Energize the battery charger, check DC output polarity, measure voltages, and test charger alarms and trip and close control voltage.
  • Furnish all labor, certified technicians, PPE, tools, materials and equipment. Travel is included in the price.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Lockout work conflict. Section 1.1 says you apply facility-approved lockout protocols, but section 5.1 says contractors do not perform lockout and tagout here. Ask the QAE who performs it and when, and price any Facilities Division coordination.
  • Wage determination not readable. The wage determination file is a scanned image, so we could not review it and you must read it yourself. The only labor rate in the text is a WG-10 electrician at 29.45 dollars plus 5.92 dollars in health and welfare, which the clause says is for information only, so price labor from the wage determination.
  • Quote needs a technical approach. The lowest price that is technically acceptable wins, so a low price with a weak or missing technical approach can be rejected. Your quote must show how you will meet every SOW requirement.“Quoters shall submit a technical approach that demonstrates their ability to complete all project requirements as outlined in the Statement of Work” FAR Clauses and Deviations Services.pdf, page 23
  • Real ID and base access rules. The notice says visitors must show a Real ID or passport, but the SOW accepts other credentials such as a state enhanced license or DoD ID. Base access also requires full name, date of birth and last four of SSN, and an employee list five days before work starts.“All visitors must complete a visitor access request form in accordance with Base security policy and present a valid Real ID or Passport as a method of identification.” Notice text
  • Site visit must be booked early. The SOW requires site visits to be booked at least three days ahead, so for December 2 that means by about November 29. The notice gives Nate Chappell at 757-483-8792, but the SOW lists Nathan Chappell at (206)815-2176, so call and confirm the right number.“All site visits are to be pre-arranged a minimum of three (03) days in advance.” Statement of Work (SOW).pdf, page 3
  • Fifteen-day window and pre-start paperwork. You have at most 15 working days after award to finish. Before work starts you need written safety and environmental programs reviewed by base staff, the employee list, and a start date notice, so plan these before award.“The period of performance for this contract must not exceed 15 working days after contract award or as negotiated with Contracting Officer and Facilities Engineering.” Statement of Work (SOW).pdf, page 4

Key terms

Who can bidSmall businesses only (100% set-aside)NAICS 811310, small business size standard of 12.5 million dollars.Notice text
Contract periodUp to 15 working days after awardOr as negotiated with the Contracting Officer and Facilities Engineering.Statement of Work (SOW).pdf, page 4
How they chooseLowest price technically acceptableTwo factors: technical capability and price. Award goes to the lowest price quote that passes the technical review.FAR Clauses and Deviations Services.pdf, page 25
How to submitEmail your quote on the SF-18 to two USCG addressesSend to Jamie.C.Bridges@uscg.mil and keven.d.weaver@uscg.mil.Notice text
Questions dueThursday, December 3, 2026, 5:00 PM eastern standard timeWritten questions by email only. No oral questions are accepted.Notice text
Contract typeFirm-fixed price orderTravel is not a separate line item. It must be included in your price.Notice text
Site visitWednesday, December 2, 2026, 10:00 AM eastern standard timeStrongly encouraged in the notice. Book ahead with the listed contacts.Notice text

How to respond

  1. Email your quote on the SF-18 to Jamie.C.Bridges@uscg.mil and keven.d.weaver@uscg.mil by 5:00 PM eastern standard time on Tuesday, December 8, 2026.
  2. Put solicitation number 31040RFQ270000084, your UEI labeled Unique Entity Identifier, and your name and address on the cover page.
  3. Include a technical approach that shows how you will meet every SOW task, plus a signed statement that you agree to the solicitation terms.
  4. State that your prices are firm for 60 calendar days, and complete the SF-18 price, signature and date fields.
  5. Send any written questions to the Contracting Officer and Contract Specialist by email by 5:00 PM eastern standard time on Thursday, December 3, 2026. Oral questions are not accepted.

Attached files

From SAM.gov. Download links open the original files.

  • Wage rate determination.pdf Scanned image, not read.
  • SF-18 RFQ Base Portsmouth.pdfThis is the request for quotation form; you must fill in your price, name, address, signature and date, then email it back. Read.
  • Statement of Work (SOW).pdfThis defines the tasks, schedule, security and safety rules; you must read it and price every item, and there is no form to sign. Read.
  • Poster SCA Poster.pdfThis is a Department of Labor notice of employee rights under the Service Contract Act; read it only, since it does not need your signature. Read.
  • FAR Clauses and Deviations Services.pdfThese are the clauses and provisions that set contract terms, evaluation and SAM requirements; read them and complete any representations that apply. Read.

Not stated in what we read

  • Estimated value of the order, which the notice does not state.
  • Contents of the wage determination, which could not be read here.
  • Minimum insurance amounts, since the HSAR 3052.228-70 clause refers to amounts that are not written in the text.
  • Who performs lockout and tagout, and how long the Facilities Division will take to set it up.
  • Exact quantities beyond the listed breakers and four batteries, since the notice asks bidders to field verify quantities.
  • Whether any option periods exist, since the text describes one order and lists no options.

Notice text

Provide service for main switch gear cleaning, visual inspection, breaker servicing, battery replacement and DC control power maintenance located at USCG Base Portsmouth. The work consists of providing all labor, materials, and equipment, as required, to complete all work as described in the provided Statement of Work (SOW). This procurement is 100% set-aside for Small Businesses using NAICS code of 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance and a small business size standard of 12.5 million dollars.

The Government contemplates award of a Firm-Fixed Price order resulting from this solicitation. See 52.212-2 for evaluation criteria. All quotes must be submitted by 5:00 PM eastern standard time on 12/08/2026 via email to Jamie.C.Bridges@uscg.mil and keven.d.weaver@uscg.mil. Quotes shall be submitted via the SF-18. Questions about this solicitation must be submitted in writing to the Contracting Officer and Contract Specialist at the email addresses listed above no oral questions will be accepted.

All potential quoters are strongly encouraged to visit the site to field verify any/all quantities before submitting quotes. A site visit will be held on 12/02/2026 at 1000 eastern standard time located at: USCG Base Portsmouth 4000 Coast Guard Blvd Portsmouth, VA 23703-2199 Interested parties must arrange site visits with Nate Chappell at 757-483-8792, Nathan.C.Chappell@uscg.mil and Hayden Heyer 757-375-1183, Gary.H.Heyer@uscg.mil. All visitors must complete a visitor access request form in accordance with Base security policy and present a valid Real ID or Passport as a method of identification.

Full name, date of birth, and last 4 of SSN must also be provided. Visitors with a valid Military ID or RAPIDGate pass will not be required to complete the access form. The final date and time for questions is 5:00 PM eastern standard time on 12/3/2026. There was not an incumbent.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from US Coast Guard by email

Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy