Construction inspection and management support, California
The Bureau of Reclamation is planning a possible labor-hour task order for eight support staff: two materials testing technicians, three construction inspectors and three construction managers, mainly from Redding to the southern San Joaquin Valley in California.
Official title: R--Professional Services for Construction Management Support
- Deadline
- Dec 3, 5:00 PM PT
- 7 days left
- Who can respond
- Any business
- Market research, not a bid
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Reclamation Contracting Activity
What they're buying
The base period is 12 months with one 12-month option, and this sources sought notice is for market research only.
Top catches
“THIS IS NOT A SOLICITATION.” Sources_Sought_Notice-SAM_gov_11_18_2026_1.pdf, page 1
The agency says this is market research only and it is under no obligation to issue a solicitation. Do not expect a bid package now. Send your company details and past projects if you want to be considered, and watch SAM.gov for a solicitation.
“Response deadline: 2026-12-03T17:00:00-08:00” SAM.gov record
This is the deadline for your response to this notice, 17:00 at -08:00 on Thursday, December 3, 2026. Do not confuse it with the January 18, 2027 quote date in the schedule, which belongs to a later solicitation.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Two materials testing technicians (MET) to sample and test earthwork and concrete, with daily reports and a monthly testing summary.
- Three Level IV civil construction inspectors to watch daily work for specification, safety and environmental compliance, with daily reports, weekly reports and at least two captioned photos a day.
- Three construction managers to review submittals, schedules and invoice quantities, prepare responses to requests for information and change requests, and draft contract modifications.
- Attend weekly construction coordination meetings of about one hour, and ad hoc problem meetings with the construction contractor.
- Report non-compliant work to the COR immediately, followed by a written report within four business hours.
- Staff up to 2,500 hours per year per position, on site daily, typically 40 to 50 hours a week, up to 12 hours a day, with weekend work when required.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Not a solicitation yet. The agency says this is market research only and it is under no obligation to issue a solicitation. Do not expect a bid package now. Send your company details and past projects if you want to be considered, and watch SAM.gov for a solicitation.
- Response date is December 3. This is the deadline for your response to this notice, 17:00 at -08:00 on Thursday, December 3, 2026. Do not confuse it with the January 18, 2027 quote date in the schedule, which belongs to a later solicitation.
- Set-aside not yet chosen. The notice lists a total small business set-aside, another contract vehicle, or full and open competition as options. Check your size under NAICS 541330 against the $25.5M size standard before you spend time on a response.“Total Small Business Set-Aside” Sources_Sought_Notice-SAM_gov_11_18_2026_1.pdf, page 1
- Background checks before work starts. Each staff member must be fingerprinted at a USA Access center before work begins. Each must also pass a background investigation that asks for a full Social Security number and other personal details. Plan extra time before named staff can start, since this likely delays the start date.“complete and successfully pass a background investigation.” DRAFT_PWS_-_Construction_Support_Professional_Services_-_CGB_Region_1.pdf, page 11
- Vehicle and equipment may be yours. The government may provide a vehicle only if one is available. You may have to supply a vehicle with a caution strobe, protective gear and a computer. Price these in unless the government confirms it will supply them.“The Contractor may be required to provide the following:” DRAFT_PWS_-_Construction_Support_Professional_Services_-_CGB_Region_1.pdf, page 10
- Long days and weekends. Hours can run to 12 a day with weekend work, and the 2,500-hour figure is an anticipated level of effort, not a cap. Build these hours and any overtime into your labor rates, and check whether your rates cover them.“The typical work week is 40-50 hours and may be up to 12 hours per day.” DRAFT_PWS_-_Construction_Support_Professional_Services_-_CGB_Region_1.pdf, page 10
Key terms
| Who can bid | Set-aside not stated; size standard $25.5MResponses come from interested prime contractors. Confirm your size under NAICS 541330 first.Sources_Sought_Notice-SAM_gov_11_18_2026_1.pdf, page 1 |
|---|---|
| Contract period | Base 12 months, plus one 12-month optionAnticipated period, starting from award. The notice estimates award on March 10, 2027.DRAFT_PWS_-_Construction_Support_Professional_Services_-_CGB_Region_1.pdf, page 10 |
| How to submit | Email to two named DOI contactsNot through SAM.gov. Send to Rosana Yousef-Goarji and Stephanie Lindner.Sources_Sought_Notice-SAM_gov_11_18_2026_1.pdf, page 3 |
| Contract type | Labor-hour task orderYou are reimbursed for actual labor hours worked, not paid a fixed price.DRAFT_PWS_-_Construction_Support_Professional_Services_-_CGB_Region_1.pdf, page 10 |
How to respond
- Gather what the notice asks for: company name and address, CAGE code, UEI, business size under NAICS 541330, and any socioeconomic status.
- Write a short statement of your interest as a prime contractor and your capability, then list up to three relevant projects from the last five years with title, scope, contract amounts at award and close-out, modifications, period, customer, contact, your role and key subcontractors.
- Email the response to Rosana Yousef-Goarji at Rosana_YousefGoarji@ios.doi.gov and Stephanie Lindner at Stephanie_Lindner@ios.doi.gov by Thursday, December 3, 2026, 17:00 (-08:00). File format and page limits: Not stated.
- Do not include proprietary, classified, confidential or sensitive information. The government will not reimburse response costs.
- Watch SAM.gov for a solicitation. The notice dates are preliminary: a solicitation around December 18, 2026, quotes around January 18, 2027, and award around March 10, 2027.
Attached files
From SAM.gov. Download links open the original files.
- Sources_Sought_Notice-SAM_gov_11_18_2026_1.pdfThe sources sought notice is market research, not a solicitation. You read it and respond by email with the information in its section 5. It lists no forms to sign. Read.
- DRAFT_PWS_-_Construction_Support_Professional_Services_-_CGB_Region_1.pdfThis draft performance work statement lists staff, duties, qualifications, hours and deliverables. You read it to price the work. It says staff must sign a non-disclosure statement and a hold harmless vehicle release. Read.
Not stated in what we read
- Estimated contract value or ceiling.
- Final set-aside decision and whether the work will be competed under an existing contract vehicle.
- Whether a solicitation will be issued, and its actual date.
- Basis for award and how proposals will be evaluated.
- Whether a government vehicle, laptop and other equipment will be provided.
- Whether a site visit or pre-bid meeting will be held.
Notice text
The DOI/BOR is preparing for a potential procurement for Professional Services for Construction Management Support. A. The Bureau of Reclamation requires construction management support services for infrastructure projects throughout the California Great Basin Region. This PWS covers the provision of two Materials Engineering Testing (MET) Level III, three Civil Construction Inspectors (CI) Level IV, and three Construction Management Services (CMS) Level IV personnel to support ongoing and future construction projects, including but not limited to: a. Arroyo Canal Fish Screen and Sack Dam Bypass Project, located near Dos Palos CA, b. B.F. Sisk Dam Safety of Dam and Reservoir Expansion Projects, Located near Santa Nella, CA c. Trinity River Fish Hatchery Modernization Design Build Project, located near Lewiston CA.
As published on SAM.gov.
Contacts
- Lindner, Stephanie, stephanie_lindner@ios.doi.gov, 916-591-0194
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 3, 5:00 PM PT7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- Department of the NavyEnvironmental planning for ship homeporting, Norfolk, VA
- Department of the ArmyIntent to Sole Source - Type-C A&E Services for Construction of SFS Facility
- Department of the NavyNetwork lab operation and sustainment for Canadian FMS
- National Aeronautics and Space AdministrationProgram Analysis and Control (PAAC V) Bridge
- National Aeronautics and Space AdministrationMass production process development at NASA Ames, CA
- Department of the NavyGun and weapon systems support at NSWC Dahlgren
- US Special Operations Command (USSOCOM)YT706 engine lifecycle support at Fort Campbell, KY
- Departmental OfficesConstruction oversight for nature center, Wichita, KS
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy