1. Opportunities
  2. Department of Homeland Security
  3. US Coast Guard
  4. 70ZL14Q0000006

Replace 13 propane regulators at Fire Island, Babylon, NY

Remove and replace 13 exterior propane regulator assemblies that serve housing boilers at the Coast Guard Station Fire Island housing site in Babylon, NY.

Official title: REMOVE AND REPLACE 13 PROPANE REGULATORS, USCG STA FIRE ISLAND HOUSING, BABYLON, NY 11702-4602

Deadline
Dec 7, 5:00 PM ET
13 days left
Who can bid
Small businesses
Size standard for NAICS 238220: $19 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Babylon, NY
Buyer: Base Boston

What they're buying

Work must be finished within 30 calendar days after award, and quotes are due Monday, December 7, 2026 at 5:00 PM (-05:00).

Top catches

Verify each regulator setpoint
“Verify existing regulator type, inlet pressure, required outlet pressure, connection sizes, and connected boiler load before ordering.” 3_30199PR270000006SOW.docx

You cannot price the right parts until you confirm each regulator's type, inlet and outlet pressure, and boiler load. The photo nameplate is reference only, and its spring range is not the outlet setting.

Piping work capped at 5 feet
“limited to 5 linear feet per assembly, including inlet and outlet piping combined” 3_30199PR270000006SOW.docx

Price only up to 5 linear feet of adjacent piping per assembly, inlet and outlet combined. If damage goes beyond that, stop, notify the COR, and wait for the Contracting Officer before any change to scope or price.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 4 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove and replace 13 exterior propane regulator assemblies, one for one, in their existing locations, keeping the gas service arrangement, capacity and operating pressures.
  • Furnish each assembly with a new listed LP-gas regulator, manual gas shutoff valve, unions or approved disconnects, nipples, adapters, vent protection and mounting hardware.
  • Replace deteriorated adjacent piping only where needed, up to 5 linear feet per assembly, inlet and outlet combined.
  • Perform piping pressure tests, leak checks and purging, verify outlet pressure under load and lockup, then restore service and confirm boiler ignition.
  • Submit regulator product data and verified pressure and capacity information for Government review before ordering.
  • Deliver a location-by-location closeout record, operating instructions, photos, a one-year warranty on materials and workmanship, and remove old equipment and debris.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Verify each regulator setpoint. You cannot price the right parts until you confirm each regulator's type, inlet and outlet pressure, and boiler load. The photo nameplate is reference only, and its spring range is not the outlet setting.
  • Piping work capped at 5 feet. Price only up to 5 linear feet of adjacent piping per assembly, inlet and outlet combined. If damage goes beyond that, stop, notify the COR, and wait for the Contracting Officer before any change to scope or price.
  • Licensed LP-gas technicians required. Your crew must include qualified LP-gas technicians with the required licenses, and you must obtain the permits and inspections. Confirm your staff hold these before you bid.“Work shall be performed by qualified LP-gas technicians holding required licenses.” 3_30199PR270000006SOW.docx
  • Past performance asked under LPTA. The notice does not say how past performance is scored. Include relevant past LP-gas work with references, and price competitively, because price decides the award once offers are technically acceptable.“Evaluation factors: lowest price technically acceptable.” Notice text
  • Labor rates not provided. Service Contract Labor Standards apply, but no wage determination appears in the text you have. A scanned attachment could not be read, so ask the contracting officer for labor rates before you price labor.“Service Contract Labor Standards FAR 52.222-41 applies.” 12_30199PR270000006SF18.docx
  • Site visit strongly advised. The site visit is not mandatory, but photos do not show concealed piping or confirm serviceability. Either visit all 13 locations or add a cost allowance for conditions you cannot see.“A pre-award site visit is strongly encouraged to verify all 13 locations, equipment ratings, piping condition, and access.” 3_30199PR270000006SOW.docx

Key terms

Who can bidSmall businesses only (total set-aside)The SF18 lists NAICS 238220 with size $19M. Confirm you fit that size standard.SAM.gov record
Contract periodComplete work within 30 calendar days after awardThe SF18 also says deliver by 30 days after award.3_30199PR270000006SOW.docx
How they chooseLowest price technically acceptableThe notice also asks for past performance information, with no scoring described.Notice text
How to submitEmail to Beverly.A.Primm@uscg.milInclude price breakdown, parts lead time, parts spec sheets, completed SF18 with UEI, and past performance.Notice text
Questions dueMonday, November 30, 2026 (time not stated)Send questions in writing to Beverly.A.Primm@uscg.mil.Notice text
Contract typeFirm fixed priceThe notice asks for one firm fixed price quote.Notice text
Site visitStrongly encouraged, date not statedThe SOW does not describe it as mandatory.3_30199PR270000006SOW.docx

How to respond

  1. Ask the COR, Kyle Swann at Kyle.D.Swann@uscg.mil, or the contracting officer Beverly.A.Primm@uscg.mil for a site visit date, since none is stated.
  2. Send any written questions to Beverly.A.Primm@uscg.mil by Monday, November 30, 2026. The notice does not state a time.
  3. Complete the SF18 with your price and UEI, and include it with the quote.
  4. Email the full quote to Beverly.A.Primm@uscg.mil by Monday, December 7, 2026, 5:00 PM (-05:00). It must include a firm fixed price, a detailed price breakdown, parts lead time, parts spec sheets, and past performance information.

Attached files

From SAM.gov. Download links open the original files.

  • SF1413REVOCT2023.pdfA federal form whose text did not extract cleanly, so I could not confirm what it asks. Read it and complete any part that applies to you. Read.
  • 12_30199PR270000006SF18.docxThe RFQ quote form (SF18). You must complete it with your price and UEI as part of your quote. Read.
  • 3_30199PR270000006SOW.docxThe statement of work listing the required work, rules and contacts. Read it in full and price from it; you do not fill it in. Read.
  • 12_30199PR270000006RFQCLAUSES.docxThe clauses incorporated into the RFQ, including a representation you make by submitting an offer. Read it, and check the representation before you submit. Read.
  • 7_30199PR270000006WR.pdf Scanned image, not read.

Not stated in what we read

  • Estimated value or budget for the work: Not stated.
  • Labor rates or wage determination for the Service Contract Labor Standards. The scanned file 7_30199PR270000006WR.pdf could not be read, so you must review it yourself.
  • Regulator models, inlet pressures and required outlet pressures for each of the 13 locations.
  • Site visit date, time and how to sign up.
  • Time of day for the November 30, 2026 questions deadline.
  • How past performance is scored and whether it is pass or fail or part of the award decision.

Notice text

Contractor shall furnish all labor, materials, equipment, transportation, and supervision necessary to remove and replace 13 exterior propane regulator assemblies serving housing boilers at USCG STA Fire Island Housing, Babylon, NY 11702-4602 per the attached Scope of Work. Quote should be a firm fixed price quote and should include the lead time for parts and a specification sheet for those parts. It should also include a detailed quote price breakdown. Quote should also include a completed SF18, with price and UEI included. Evaluation factors: lowest price technically acceptable. Please also include past performance information. Questions must be received in writing by 11/30/2026 to Beverly.A.Primm@uscg.mil. Quotes should be sent to Beverly.A.Primm@uscg.mil.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from US Coast Guard by email

Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy