Electrical breaker and feeder testing at Reno VA, NV
The Reno VA medical center wants triennial testing of its electrical distribution system, plus a coordination study and arc flash analysis, at 975 Kirman Ave, Reno, NV.
Official title: J061--Triennial Circuit Breaker and Feeder Testing
- Deadline
- Dec 4, 12:00 PM PT
- 9 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Reno, NV
- Buyer: 261-Network Contract Office 21 (36C261)
What they're buying
It is a firm-fixed-price total set-aside for service-disabled veteran-owned small businesses (SDVOSB), with most testing on nights and weekends and no contract length stated.
Top catches
“Offers received from entities that are not certified SDVOSBs and listed in the SBA certification database at the time of offer shall not be considered.” 36C26127Q0067_1.docx
Only firms listed as certified SDVOSBs in the SBA database at the time of offer can bid. Check your listing before you spend time on the quote.
“The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.” 36C26127Q0067_1.docx
Sign the VAAR 852.219-75 certificate and return it with your quote. It caps what you pay non-SDVOSB subcontractors at 75% of the VA payment, excluding materials.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 8 of 13 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Test about 11 medium-voltage (MV) switches, 10 MV transformers, 27 low-voltage (LV) transformers, 477 circuit breakers, and 570 feeder cables, using the counts the VA gave from prior testing.
- Test MV cable from vault to vault using very low frequency (VLF) methods. Inspect and photograph every vault and report cable racking and supports.
- Test and exercise every 225 amp and larger breaker. Torque bus and lug connections, megger LV feeders, and clean connections.
- Do protective relay testing. Update one-line drawings, color-coded by emergency branch. Provide a coordination study and arc flash analysis sealed by a professional engineer, with new engraved labels showing room numbers.
- Take standard and infrared photos of each item tested. Save as JPEG files under 4MB each. Do infrared work during normal hours.
- Deliver a PDF final report within 7 days of testing completion. Include cost estimates for repairs and for MV cable replacement by vault. Corrective repairs are not in your scope.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Total SDVOSB set-aside, certified only. Only firms listed as certified SDVOSBs in the SBA database at the time of offer can bid. Check your listing before you spend time on the quote.
- Signed 75% subcontracting certificate required. Sign the VAAR 852.219-75 certificate and return it with your quote. It caps what you pay non-SDVOSB subcontractors at 75% of the VA payment, excluding materials.
- You must run medium-voltage switching. The VA says the vendor is responsible for switching the 25 kV medium-voltage system. Price the switching, isolation, and restoration crews, and plan for VA electricians on low-voltage work.“Vendor should be responsible for the switching of the medium voltage system (25KV).” 36C26127Q0067 0002.docx
- Most testing runs at night. Testing must run from 6 PM to 6 AM, on weekends, and on federal holidays. Price night and weekend crews, and coordinate each outage with the contracting officer's representative (COR) two weeks ahead.“Per SOW 8.6, Electrical Testing shall be performed during Off Hours - 6:00 PM to 6:00 AM, weekends, and federal holidays.” 36C26127Q0067 0002.docx
- Wage determination file not reviewed. The Washoe County wage determination is a scanned file we could not read. Read it on SAM.gov before you price labor.“Wage Determination 2015-5595 Washoe County” 36C26127Q0067_1.docx
- Use the 12-04 deadline, email only. Earlier dates of 11/09 and 11/20 are replaced. Email your quote to alex.arter@va.gov by 12 PM PST on Dec 4, and split emails if they exceed 20MB.“** HOUR & DATE for Receipt of Offers is EXTENDED to: 12-04-2026 12PM PST” 36C26127Q0067 0005.docx
Key terms
| Who can bid | Certified SDVOSBs onlyYour firm must be listed as certified in the SBA database at the time of offer.36C26127Q0067_1.docx |
|---|---|
| How they choose | Price only (per factor table)The clause says price and other factors. The factor table says price only.36C26127Q0067_1.docx |
| How to submit | Email to alex.arter@va.govSplit into several emails if the files exceed 20MB.36C26127Q0067_1.docx |
| Questions due | Nov 16, 2026, 12 PM PST (passed)Closed. Answer 11 in Amendment 0002 gives 11/02 instead, so the dates conflict.36C26127Q0067 0002.docx |
| Contract type | Firm-fixed-price contractOne lump-sum price for one job (item 0001). The VA says it will accept two invoices.36C26127Q0067_1.docx |
| Site visit | Held 11/05/2026; attendance was optionalThe notice gives no later visit date.36C26127Q0067 0004.docx |
How to respond
- Sign the VAAR 852.219-75 limitation certificate and include it with your quote. Include proof of your SDVOSB certification and the signed SF 1449 Block 30 if required.
- Complete the price schedule for item 0001 (one job, lump sum) and acknowledge all five amendments in your quote.
- Email the quote to alex.arter@va.gov by 12 PM PST on Friday, Dec 4, 2026.
- If the files total more than 20MB, split them across several emails.
Attached files
From SAM.gov. Download links open the original files.
- Facility Floor Plan.pdf Scanned image, not read.
- 36C26127Q0067 0001.docxAmendment 0001 (10-14-2026) adds the single-line schematic attachment. Read it and acknowledge it in your quote. Read.
- 36C26127Q0067 0002.docxAmendment 0002 (10-21-2026) holds the VA's questions and answers and changes the quote date. Read it closely and acknowledge it in your quote. Read.
- 36C26127Q0067 0005.docxAmendment 0005 (11-19-2026) moves the quote deadline to 12-04-2026 and closes new RFIs. Read it and acknowledge it in your quote. Read.
- D1014-8 C03 36C26124P0555_TESTING REPORT.pdf Not read: over our length limit.
- 36C26127Q0067_1.docxThe solicitation: SF 1449 cover, statement of work, price schedule, and clauses. You must read it, complete the price schedule, and sign SF 1449 Block 30 if required. Read.
- 36C26127Q0067 0003.docxAmendment 0003 (11-02-2026) adds Attachment F and more questions on drawings, switching, and badging. Read it and acknowledge it in your quote. Read.
- Facility Single Line Diagram.pdf Not read: over our length limit.
- Attachment F- Plans and diagrams REVISED 11-13-23.pdfMedium-voltage and building one-line drawings that show what to test. Read it to plan your test scope. No fill-in is needed. Read.
- C27 - Single-Line Schematics.pdfPartial one-line drawing set (pages 1-3 and 13-15 of 15). Pages 4 to 12 were not provided to us, so read the full file on SAM.gov. Read in part (pages 1–3 and 13–15 of 15).
- 36C26127Q0067 0004.docxAmendment 0004 (11-06-2026) adds the 11/05 site visit log. Read it and acknowledge it in your quote. Read.
- Reno Site Visit 11-05.pdf Scanned image, not read.
- Wage Determination 2015-5595 Washoe County.pdf Scanned image, not read.
Not stated in what we read
- Contract length, end date, and any option years.
- Estimated contract value. The $19 Million on the SF 1449 is likely the size standard, not a budget.
- Payment terms, such as the number of days to pay after acceptance.
- Contents of the Facility Single Line Diagram, the 2024 testing report, the floor plan, and the wage determination. We could not review them, so read them on SAM.gov.
- How long badge and background checks take and who sponsors them. The VA did not answer this question.
- Whether late questions are still accepted now that the question deadline has passed.
Notice text
End of Amendment
As published on SAM.gov.
Contacts
- Alex D Arter, Contract Specialist, alex.arter@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 4, 12:00 PM PT9 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsProximity sensors for automatic doors, Fayetteville VA, NC
- Agricultural Research ServiceElectrical and data wiring for cubicles, Madison, WI
- Forest ServiceNetwork cabling and IT room upgrade, West Yellowstone, MT
- Department of Veterans AffairsElectrical equipment testing at Cleveland VA, OH
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
- Department of the ArmyGenerator power survey for disasters, Pittsburgh, PA
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy