Fire alarm system upgrade at Tomah VA Medical Center, WI
Replace the fire alarm system across the Tomah VA Medical Center campus and extend it to out-buildings, within 460 calendar days after notice to proceed.
Official title: Z1DA--Upgrade Fire Alarm System Construction 676-22-110
- Deadline
- Dec 9, 10:00 AM CT
- 14 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- $2.59M
- Likely U.S. Vet General Contracting, LLC
- Place
- Tomah, WI
- Buyer: 252-Network Contract Office 12 (36C252)
What they're buying
The bid is set aside for service-disabled veteran-owned small businesses, and bids are due by email on Wednesday, December 9, 2026.
Top catches
“Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows:” Pg 2 of Amendment A0007.docx
Your bid goes to two email inboxes, not a portal. Send early, use the subject line 36C25226B0014, and keep proof that the emails arrived, because the notice gives no other delivery method.
“Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)” SAM.gov record
This is a set-aside for service-disabled veteran-owned small businesses, so you must qualify before you spend time pricing. If you bid as a joint venture, the amendment requires printed SBA proof with the bid.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 6 of 30 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the campus fire alarm system: control panels, radio links, smoke and heat detectors, pull stations, strobes, horns, speakers and relays.
- Extend fire alarm coverage to out-buildings not covered now, and replace the main alarm control stations in Building 36 and Building 407.
- Delete and add devices as set by Amendment A0007, then check the plans and one-line diagrams for exceptions.
- Duct smoke detectors at air handlers and smoke dampers, with sampling tubes, plus door holders with monitoring modules and relays.
- Structured voice and data cabling under Section 27 15 00, restored by Addendum 2, to meet TIA Category 6A.
- Spare parts (20 smoke detectors, 5 manual pull stations, 500 feet of SLC cable), operator training, as-built drawings, and a one-year guaranty.
Who did it before
$2.59M
on the contract that likely holds this work now: U.S. Vet General Contracting, LLC. It ends Dec 26, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Bids go by email only. Your bid goes to two email inboxes, not a portal. Send early, use the subject line 36C25226B0014, and keep proof that the emails arrived, because the notice gives no other delivery method.
- Set-aside limits who can bid. This is a set-aside for service-disabled veteran-owned small businesses, so you must qualify before you spend time pricing. If you bid as a joint venture, the amendment requires printed SBA proof with the bid.
- Device list changed by amendment. Amendment A0007 says to delete most smoke detectors, heat detectors and horn strobes, and to check the plans for exceptions. The drawings on file are dated April 21, 2026, and the amendment does not give a revised device count, so ask for one before you price.“Delete all smoke detectors except in:” Pg 2 of Amendment A0007.docx
- Duct detector pricing lacks HVAC data. Duct smoke detectors depend on air handler locations and CFM ratings, and the bidder asked for HVAC plans. The response puts code duty on bidders and does not supply those ratings, so price this risk on purpose or ask in writing before the bid is due.“NFPA requirements for fire alarm for all buildings associated with the bidding process should be known by the bidders.” Pg 2 of Amendment A0007.docx
- Shutdown and interruption lead times. The fire alarm must keep working during the job, and any interruption needs written notice to the COR and the VA Fire Department 15 working days ahead. Utility shutdowns must be done off-hours, 6:00PM to 6:00AM, so build the lead time and night work into your schedule and price.“VA Fire Department shall be notified 15 working days ahead of any interruptions to fire alarm system.” S02 - Bid Specifications_20260421.pdf, page 20
- Alternates listed but not used. The bid schedule says alternates will not be used, but the specifications still list Alternates 1 through 6 with building deletions. Price only the all-inclusive base bid and confirm this with the contracting officer in writing.“Alternate Bid Items noted in the design and specifications will not be used.” S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1
Key terms
| Who can bid | Service-disabled veteran-owned small businesses (set-aside)Joint ventures must include the JV agreement and printed SBA proof with the bid.SAM.gov record |
|---|---|
| Contract period | 460 calendar days after notice to proceedCovers preconstruction, construction and closeout. Campus work is listed at 350 days.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| How they choose | Lowest responsive bid from the responsible bidderOne award on the all-inclusive base bid only.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| How to submit | By email to two VA contracting officers, subject 36C25226B0014Send to Lynn.VanderVelde@va.gov and Ryan.McMillin@va.gov.Pg 2 of Amendment A0007.docx |
| Estimated value | $5,000,000 to $10,000,000 (scale only)The bid schedule says this range helps show scale and is no longer a mandatory element.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| Contract type | Construction, one all-inclusive base bid (CLIN 0001)You enter one price for CLIN 0001. The bid schedule says alternates will not be used.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| Site visit | Pre-bid visit dates have passed; no more visits scheduledThe sign-in sheet is dated 8/25 and 8/27, but the header says September 25 and 27. Visits are by appointment with the COR.S06 - Site Visit Sign-in Aug 25 27-2026.pdf, page 1 |
How to respond
- Email your bid to Lynn.VanderVelde@va.gov and Ryan.McMillin@va.gov, with the subject line 36C25226B0014.
- Include your all-inclusive base bid for CLIN 0001. Required forms, signatures and file formats: Not stated.
- If you bid as a joint venture, include the JV agreement and printed SBA proof with the bid, or the bid is non-responsive.
- Send by 10:00 AM local time on Wednesday, December 9, 2026. The virtual bid opening is at 11:30 AM that day by Microsoft Teams or phone.
Attached files
From SAM.gov. Download links open the original files.
- S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdfUpdated bid schedule and statement of work. You enter your all-inclusive base bid price for CLIN 0001. Read.
- S02 - PART 3 - FIRE ALARM DEMO PLANS 20260421.pdf Not read: over our length limit.
- S06 - Att 2 Addendum No2_20261104.pdfPre-Bid Addendum 002, pages 1-24 and 42-52 only. It restores Section 27 15 00 and changes Section 28 31 00. Read it. Read in part (pages 1–24 and 42–52 of 52).
- S02 - PART 5 - FIRE ALARM DEMO ONE-LINE DIAGRAMS 20260421.pdf Not read: over our length limit.
- S02 - PART 8 - FIRE ALARM NEW ONE-LINE DIAGRAMS 20260421.pdf Not read: over our length limit.
- S02 - PART 4 - FIRE ALARM DEMO PLANS 20260421.pdf Not read: over our length limit.
- S06 - Low Risk Locations - Upgrade Fire Alarm.pdf Not read: over our length limit.
- S06 - Att 1 RFI Response A0005 FINAL 20261104.pdf Scanned image, not read.
- 36C25226B0014 0004.docx Not read: over our length limit.
- S06 - Infection Control 676-22-110 Upgrade Fire Alarm.pdf Not read: over our length limit.
- S02 - PART 1 - GENERAL DRAWINGS 20260421.pdf Not read: over our length limit.
- S06 - Att 2 Addendum No1 676-22-110 Upgrade Fire Alarm System 20260929.pdfPre-Bid Addendum 001 changing drawings and specifications. Read it. You do not sign it. Read.
- S02 - Wage Determination WI20260011 Building Mod 1 20260518.pdf Not read: over our length limit.
- S06 - 36C25226B0014 0002.pdf Not read: over our length limit.
- S02 - Bid Specifications_20260421.pdfProject specifications, pages 1-26 and 663-678 only. Read the full set, including pages not provided here. Read in part (pages 1–26 and 663–678 of 678).
- S06 - Att 3 RFI Response A0003 Oct 6 2026.pdf Not read: over our length limit.
- S02 - PART 6 - FIRE ALARM NEW PLANS 20260421.pdf Not read: over our length limit.
- S06 - Site Visit Sign-in Aug 25 27-2026.pdfPre-bid site visit sign-in sheet. Mostly unreadable, so read it only for reference. Read.
- S06 - High-Highest Risk Locations - Upgrade Fire Alarm.pdf Not read: over our length limit.
- S06 - RFI Response A0001 Sep 3 2026.pdf Not read: over our length limit.
- S02 - PART 7 - FIRE ALARM NEW PLANS 20260421.pdf Not read: over our length limit.
- S02 - 36C25226B0014.docx Not read: over our length limit.
- S02 - PART 9 - ELECTRICAL DRAWINGS 20260421.pdf Not read: over our length limit.
- 36C25226B0014 0003.docx Not read: over our length limit.
- S06 - Medium Risk Locations - Upgrade Fire Alarm 02.pdf Not read: over our length limit.
- S02 - PART 2 - CIVIL DRAWINGS 20260421.pdf Not read: over our length limit.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dad526b27f9c4efca43d3322d860f331/download Could not be read.
- Pg 2 of Amendment A0007.docxAmendment A0007 with RFI responses, the bid email instructions and virtual opening details. Read it, because it changes scope and submission. Read.
- 36C25226B0014 0006.docx Not read: over our length limit.
- 36C25226B0014 0005.docx Not read: over our length limit.
Not stated in what we read
- Davis-Bacon wage rates: Wage Determination WI20260011 Mod 1 was not included, so we could not review it. The Q&A says to use ELEC0014-005 for fire alarm labor, and you must read the wage determination yourself.
- Air handler locations and CFM ratings for duct detectors. The text does not provide HVAC drawings and does not say whether they will be issued.
- Elevator controller makes and models, and which elevators are affected. The VA says it has no list.
- Questions deadline: Not stated. Whether the VA will update drawings or RFI responses before the bid date: Not stated.
- Other amendments and RFI responses (0003 to 0006 files, RFI responses A0001 and A0003, and the scanned A0005). These were left out or could not be read, and you must read them before pricing.
- Full fire alarm plans, one-line diagrams, demolition drawings and infection control files (Parts 1-9 and others) were left out. We could not review them, and you must read them.
Notice text
Amendment 0007 publishes a response to an RFIs and extends out due date.
As published on SAM.gov.
Contacts
- Lynn Vander Velde, Contract Specialist, Lynn.VanderVelde@va.gov, 414-844-4800
- Ryan McMillin (414) 844-4839, ryan.mcmillin@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Veterans Affairs for the same kind of work (NAICS 238210, service code Z1DA) in Wisconsin that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Construction Project 676-22-122 Replace Electrical Switchgear at Tomah VAMC, 500 Veterans Street, Tomah WI 54660U.S. Vet General Contracting, LLC · 36C25225C0034 | $2,592,463 | Dec 26, 2026in 1 month | WI |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 10:00 AM CT14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Agricultural Research ServiceElectrical and data wiring for cubicles, Madison, WI
- Forest ServiceNetwork cabling and IT room upgrade, West Yellowstone, MT
- Department of Veterans AffairsElectrical equipment testing at Cleveland VA, OH
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
- Department of the ArmyGenerator power survey for disasters, Pittsburgh, PA
- Forest ServiceFiber optic conduit at Womble Work Center, Mount Ida, AR
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy