- Opportunities
- Department of Veterans Affairs
- 36C25226B0014-1
Fire alarm replacement at Tomah VA Medical Center, WI
Replace the campus-wide fire alarm system at the Tomah VA Medical Center in Tomah, Wisconsin, and extend it to out-buildings, over a contract period of 460 calendar days after notice to proceed.
Official title: Z1DA--Upgrade Fire Alarm System Construction 676-22-110
- Deadline
- Dec 1, 10:00 AM CT
- 7 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- $2.59M
- Likely U.S. Vet General Contracting, LLC
- Place
- Tomah, WI
- Buyer: 252-Network Contract Office 12 (36C252)
What they're buying
Only service-disabled veteran-owned small businesses (SDVOSB) may bid, and bids are due by email on Tuesday, December 1, 2026.
Top catches
“Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov” Notice text
Bids must go by email to both contracting officers, with the subject line given in the amendment. Send early to both addresses and keep proof of the time you sent it.
“Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)” SAM.gov record
Only SDVOSB firms can bid on this set-aside. Confirm your status before you spend time pricing, because the notice does not say how status is proven.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 5 of 29 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the campus-wide fire alarm system: all existing devices and wiring, control panels, radio receivers, smoke detectors, pull stations, strobes, relays, sprinkler alarms and microphones.
- Replace the main alarm control stations in the Firehouse (Building 36) and Emergency Dispatch (Building 407).
- Extend the fire alarm system to out-buildings not covered by the current system.
- Install new underground ducts, pullboxes and grounding under the Division 26 sections added by Addendum 001.
- Install voice and data structured cabling under Section 27 15 00, restored by Addendum 002, including fiber and Category 6A cable.
- Deliver spare parts such as 20 smoke detectors, 5 manual pull stations, 5 strobes, 5 bells, 5 speakers and 500 feet of SLC cable, plus a storage cabinet, and record all training sessions on video and audio.
Who did it before
$2.59M
on the contract that likely holds this work now: U.S. Vet General Contracting, LLC. It ends Dec 26, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Email-only bid delivery. Bids must go by email to both contracting officers, with the subject line given in the amendment. Send early to both addresses and keep proof of the time you sent it.
- Veteran-owned set-aside only. Only SDVOSB firms can bid on this set-aside. Confirm your status before you spend time pricing, because the notice does not say how status is proven.
- Pending Amendment A0005 answers. The amendment says answers to more RFIs will come in Amendment A0005, which is not in this notice. Check SAM.gov for A0005 before you price, because those answers may change what you must price.“We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005.” Notice text
- Utility shutdown notice conflicts. The hospital runs 24 hours a day, so shutdowns need written requests and off-hours work. The specifications give 15 working days notice in one place and 10 in another, so plan for the longer period and ask the COR which applies.“All utility shutdowns shall be scheduled 10 working days in advance and occur off-hours (6:00PM to 6:00AM).” S02 - Bid Specifications_20260421.pdf, page 21
- Structured cabling added back. Addendum 002 restored Section 27 15 00, a full voice and data cabling specification with Category 6A and fiber, after Addendum 001 had deleted it. Read that section and price it into your bid.“ADD specification section 27 15 00 back to the BID” S06 - Att 2 Addendum No2_20261104.pdf, page 1
- Alternates listed but not used. The bid schedule says alternate items will not be used, but the specifications still list six alternates that change the scope. Ask the contracting officer which applies before you price the base bid.“Alternate Bid Items noted in the design and specifications will not be used.” S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1
Key terms
| Who can bid | Service-disabled veteran-owned small businesses only (SDVOSB set-aside)Confirm you meet this status before you price the bid.SAM.gov record |
|---|---|
| Contract period | 460 calendar days after notice to proceedIncludes preconstruction, campus work and closeout.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf |
| How they choose | Lowest responsive bid on the base bid; one awardOnly the all-inclusive base bid is scored for award.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| How to submit | By email to Lynn.VanderVelde@va.gov and Ryan.McMillin@va.govUse the subject line given in the amendment. No other delivery method is stated.Notice text |
| Estimated value | Scale given as $5,000,000 to $10,000,000The notice says this range is no longer mandatory and is included only to show scale.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| Contract type | Construction, one all-inclusive base bid price (CLIN 0001)You enter one price for the whole base bid on the bid schedule.S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdf, page 1 |
| Site visit | Visits only by appointment with the CORThe sign-in sheet header says September 25 and 27, 2026, but the entries are dated 8/25 and 8/27. Those dates have passed.S02 - Bid Specifications_20260421.pdf, page 15 |
How to respond
- Check SAM.gov for Amendment A0005 and any later amendment before you finalize your price.
- Enter one all-inclusive price for the base bid on CLIN 0001, the only bid line in the schedule.
- Email the bid to Lynn.VanderVelde@va.gov and Ryan.McMillin@va.gov with the subject 36C25226B0014 BIDS DUE before 10:00 AM local time on Tuesday, December 1, 2026.
- Join the public virtual bid opening at 11:30 AM local time on December 1 by Microsoft Teams or phone; the amendment says you can join 10 minutes early.
- Required forms, signatures, bid guarantee and proof of SDVOSB status: Not stated in the provided text.
Attached files
From SAM.gov. Download links open the original files.
- S06 - Att 1 Updates to Pages 3 and 11 of SOL 36C25226B0014.pdfBid schedule and statement of work pages; you must fill in the CLIN 0001 base bid price and note the 460 day period. Read.
- S02 - PART 3 - FIRE ALARM DEMO PLANS 20260421.pdf Not read: over our length limit.
- S06 - Att 2 Addendum No2_20261104.pdfPre-bid Addendum No. 002 dated November 4, 2026 that restores Section 27 15 00 and changes two-way communication requirements; only pages 1 to 25 and 41 to 52 were provided, so read the full file. Read in part (pages 1–25 and 41–52 of 52).
- S02 - PART 5 - FIRE ALARM DEMO ONE-LINE DIAGRAMS 20260421.pdf Not read: over our length limit.
- S02 - PART 8 - FIRE ALARM NEW ONE-LINE DIAGRAMS 20260421.pdf Not read: over our length limit.
- S02 - PART 4 - FIRE ALARM DEMO PLANS 20260421.pdf Not read: over our length limit.
- S06 - Low Risk Locations - Upgrade Fire Alarm.pdf Not read: over our length limit.
- S06 - Att 1 RFI Response A0005 FINAL 20261104.pdf Scanned image, not read.
- 36C25226B0014 0004.docx Not read: over our length limit.
- S06 - Infection Control 676-22-110 Upgrade Fire Alarm.pdf Not read: over our length limit.
- S02 - PART 1 - GENERAL DRAWINGS 20260421.pdf Not read: over our length limit.
- S06 - Att 2 Addendum No1 676-22-110 Upgrade Fire Alarm System 20260929.pdfPre-bid Addendum No. 001 dated September 29, 2026 that changes drawings and specifications and sets a one-year guaranty period; read it, nothing to sign. Read.
- S02 - Wage Determination WI20260011 Building Mod 1 20260518.pdf Not read: over our length limit.
- S06 - 36C25226B0014 0002.pdf Not read: over our length limit.
- S02 - Bid Specifications_20260421.pdfProject specifications for Divisions 00 to 28 and 31 to 32; only pages 1 to 28 and 662 to 678 were provided, so read the full file. Nothing to sign. Read in part (pages 1–28 and 662–678 of 678).
- S06 - Att 3 RFI Response A0003 Oct 6 2026.pdf Not read: over our length limit.
- S02 - PART 6 - FIRE ALARM NEW PLANS 20260421.pdf Not read: over our length limit.
- S06 - Site Visit Sign-in Aug 25 27-2026.pdfSign-in sheet for the pre-bid site visit; for reference only, since the visit dates have passed. Read.
- S06 - High-Highest Risk Locations - Upgrade Fire Alarm.pdf Not read: over our length limit.
- S06 - RFI Response A0001 Sep 3 2026.pdf Not read: over our length limit.
- S02 - PART 7 - FIRE ALARM NEW PLANS 20260421.pdf Not read: over our length limit.
- S02 - 36C25226B0014.docx Not read: over our length limit.
- S02 - PART 9 - ELECTRICAL DRAWINGS 20260421.pdf Not read: over our length limit.
- 36C25226B0014 0003.docx Not read: over our length limit.
- S06 - Medium Risk Locations - Upgrade Fire Alarm 02.pdf Not read: over our length limit.
- S02 - PART 2 - CIVIL DRAWINGS 20260421.pdf Not read: over our length limit.
- 36C25226B0014 0001.docx Not read: over our length limit.
- 36C25226B0014 0006.docx Not read: over our length limit.
- 36C25226B0014 0005.docx Not read: over our length limit.
Not stated in what we read
- Answers in Amendment A0005 (RFI responses): the attached A0005 file is a scan I could not read, so you must read it on SAM.gov.
- Wage determination WI20260011 is attached on SAM.gov but I could not review it, so you must read it before pricing labor.
- Required bid forms, signatures, bonding, insurance and proof of SDVOSB status are not stated.
- Questions deadline and how to submit questions are not stated.
- Drawings, infection control risk files and most of the 678-page specification were not provided to me, so you must read them.
- Whether any site visit is still needed and how to book one with the COR.
Notice text
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st.
The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004……..
As published on SAM.gov.
Contacts
- Lynn Vander Velde, Contract Specialist, Lynn.VanderVelde@va.gov, 414-844-4800
- Ryan McMillin (414) 844-4839, ryan.mcmillin@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Veterans Affairs for the same kind of work (NAICS 238210, service code Z1DA) in Wisconsin that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Construction Project 676-22-122 Replace Electrical Switchgear at Tomah VAMC, 500 Veterans Street, Tomah WI 54660U.S. Vet General Contracting, LLC · 36C25225C0034 | $2,592,463 | Dec 26, 2026in 1 month | WI |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 10:00 AM CT7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsElectrical life safety upgrade at Brooklyn VA, NY
- Department of Veterans AffairsProximity sensors for automatic doors, Fayetteville VA, NC
- Agricultural Research ServiceElectrical and data wiring for cubicles, Madison, WI
- Forest ServiceNetwork cabling and IT room upgrade, West Yellowstone, MT
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the ArmyConference room and AV repair BPAs at Picatinny, NJ
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy