1. Opportunities
  2. Department of Transportation
  3. Federal Highway Administration
  4. 6982AF27B000005

Three bridges and road work, Arches National Park, UT

Construct three 100-foot concrete bridges, raise and realign part of Delicate Arch Road, and repave it in Arches National Park near Moab, Utah.

Official title: UT NP ARCH 100(2) Bridges on Delicate Arch Road

Deadline
Dec 3, 2:00 PM MT
7 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
$23.9M
Likely S & L Landscaping & Excavation Inc
Place
Moab, UT
Buyer: 6982AF Central Federal Lands Divisi

What they're buying

Bids are due Thursday, December 3, 2026, and the notice gives an anticipated completion of December 2028.

Top catches

Bid due date conflicts in amendment
“local time on 11/10/26 (date).” Amendment A003.pdf, page 2

Amendment A003 shows four dates in the bid due field: 11/19/26, 11/10/26, 12-1-26 and 12/3/26. The SAM.gov record shows 2026-12-03 at 14:00 with a -07:00 offset, so confirm the exact date and time in writing before you ship. Likely, not stated outright.

Paper bid and original bond only
“Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.” 6982AF27B000005.pdf, page 4

Electronic bids are not accepted, and a copied or faxed bid bond makes your bid non-responsive. Send a printed bid with an original, signed and sealed bond early enough to arrive before the deadline.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 37 of 125 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Three 100-foot concrete bridges at Salt Valley Wash, Salt Wash and Winter Camp Wash, with 752 cubic yards of Class A structural concrete (notice text figure)
  • Raise the road profile at each wash and realign the road north of the existing crossing at Salt Valley Wash
  • Drilled shafts: 750 linear feet of 24-inch and 890 linear feet of 30-inch, plus 138,000 pounds of epoxy-coated reinforcing steel and 642 linear feet of steel bridge railing (notice text figures)
  • Riprap, aggregate and asphalt: 1,725 cubic yards of Class 3 riprap, 5,140 tons of roadway aggregate and 8,300 tons of asphalt with a 4-inch overlay (notice text figures)
  • Pavement removal or full depth reclamation on the other road sections and parking areas, with 3,921 linear feet of colored concrete curb and 1,290 linear feet of guardrail (notice text figures)
  • Traffic control with 5,800 hours of flagger time, and at least 22 feet of roadway width for two-way traffic

Who did it before

$23.9M

on the contract that likely holds this work now: S & L Landscaping & Excavation Inc. It ends Dec 31, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Bid due date conflicts in amendment. Amendment A003 shows four dates in the bid due field: 11/19/26, 11/10/26, 12-1-26 and 12/3/26. The SAM.gov record shows 2026-12-03 at 14:00 with a -07:00 offset, so confirm the exact date and time in writing before you ship.
  • Paper bid and original bond only. Electronic bids are not accepted, and a copied or faxed bid bond makes your bid non-responsive. Send a printed bid with an original, signed and sealed bond early enough to arrive before the deadline.
  • Every option must be priced. To be eligible for award, you must price every item in Schedule A, Option X and Option Y, even though the options may not be awarded. Leaving out any line is likely to make your bid ineligible.“To be eligible for award of contract, the offeror shall submit prices for each item necessary to complete all contract work in Schedule A, Option X and Option Y.” 6982AF27B000005.pdf, page 13
  • No ground work before April 2027. No ground disturbance may start until April 1, 2027. Nesting bird surveys apply from March 1 to August 30, and Wolfe Ranch parking lot work is limited to June 1 to August 31 if Option Y is awarded. Plan crews and equipment around these limits.“Perform no ground disturbing activities until April 1, 2027.” Amendment A003.pdf, page 5
  • Fill and borrow quantities disagree. The notice text, bid schedule and earthwork summaries give different fill quantities. The Option X summary also estimates borrow material, but the bid schedule has no borrow pay item. Questions closed November 2, so price this risk yourself or decide not to bid.“Estimated Quantity of Unclassified Borrow Required” ARCH 100(2) DAR Earthwork Summary Option X.pdf, page 1
  • Archeology permit and monitors first. You must obtain an Archeological Resource Protection Act permit and provide qualified monitors, with documents to the contracting officer at least 90 days before monitoring starts. Hot work permits and night work notices also apply, so build this lead time and monitor cost into your schedule and price.“Apply for, obtain and provide a copy of an Archeological Resource Protection Act (ARPA) Permit.” Amendment A003.pdf, page 4

Key terms

Who can bidOpen to all firms; no set-asideNAICS 237310; small business size standard is $45 million in average annual receipts.SAM.gov record
Contract periodNot stated; no ground work before April 1, 2027Notice lists an anticipated completion of December 2028. The bid pages point to SCR 108.01 for the completion date.Amendment A003.pdf, page 5
How they chooseLowest responsive, responsible bidder, if funds are availableSchedule A and the options are evaluated together; which options are awarded depends on funds. A 10% price factor is stated, with unclear wording.6982AF27B000005.pdf, page 14
How to submitPrinted sealed bid only, delivered to Lakewood, COBid changes may be emailed to cflcontracts@dot.gov before the deadline.6982AF27B000005.pdf, page 4
Questions dueClosed at 4 p.m. on November 2, 2026Answers are posted on SAM.gov. Check there before you bid.6982AF27B000005.pdf, page 7
Estimated value$10,000,000 to $20,000,000 (estimated price range)The notice text gives the same range. This is not a bid amount.6982AF27B000005.pdf, page 12
Contract typeUnit-price construction contract with a base schedule and two optionsSchedule A, Option X and Option Y each have unit prices and some lump sum items.6982AF27B000005.pdf, page 13
Site visitNot mandatory; held Thursday, October 8The visit date has passed. Check SAM.gov for posted materials.6982AF27B000005.pdf, page 9

How to respond

  1. Confirm the due date and time with Laura Slauter, Contract Specialist, because Amendment A003 lists several dates for the bid due field.
  2. Complete the SF-1442 (pages A-1 and A-2), the bid schedules for Schedule A, Option X and Option Y (pages A-7 to A-17), and the other forms listed on pages A-i and A-ii. List Amendments A001, A002 and A003 in Item 19, and keep your bid valid for 60 calendar days after the due date.
  3. Attach an original bid bond with original signatures and a corporate seal, as described in the Bid Guarantee provisions (pages B-1 to B-4). Photocopies and faxed copies are not accepted.
  4. Mail or deliver the printed, sealed bid to Federal Highway Administration, Central Federal Lands Division Office, 12300 W. Dakota Avenue, Suite 167, Lakewood, CO 80228, attention Laura Slauter. Mark the outer envelope with your company name, solicitation number 6982AF27B000005, and the date and time.
  5. Send any change to your bid by email to cflcontracts@dot.gov before the deadline. Electronic bids are not accepted.

Attached files

From SAM.gov. Download links open the original files.

109 more files from a ZIP archive, 32 read
  • Alignment Reports/ARCH 100(2) DAR Horizontal Alignment Report.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) DAR Vertical Alignment Report.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) SVB Horizontal Alignment.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) SVB Vertical Alignment.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) SVWB Horizontal Alignment Report.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) SVWB Vertical Alignment Report.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) WCB Horizontal Alignment.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) WCB Vertical Alignment.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) WOLFE Horizontal Alignment.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) WOLFE Vertical Alignment.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) WRAP Horizontal Alignment Report.pdf Scanned image, not read.
  • Alignment Reports/ARCH 100(2) WRAP Vertical Alignment Report.pdf Scanned image, not read.
  • Alignment Reports/UT ARCH 100(2) DAR Horizontal Alignment Report.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) DAR Vertical Alignment Report.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) SVB Horizontal Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) WCB Horizontal Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) WCB Vertical Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) WOLFE Horizontal Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) WOLFE Vertical Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) WRAP Horizontal Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2) WRAP Vertical Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2)-SVB Vertical Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2)-SVWB Horizontal Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2)-SVWB Vertical Alignment.xlsx Read.
  • Alignment Reports/UT ARCH 100(2)-SVWB.xml Could not be read.
  • Alignment Reports/UT ARCH 100(2)-WCB.xml Could not be read.
  • Alignment Reports/UT NP ARCH 100(2) SWB.xml Could not be read.
  • Alignment Reports/UT NP ARCH 100(2)-BL (WOLFE).xml Could not be read.
  • Alignment Reports/UT NP ARCH 100(2)-BL3 (DAR).xml Could not be read.
  • Alignment Reports/UT NP ARCH 100(2)-WRAPL.xml Could not be read.
  • StakingReports/Channel Grading/UT ARCH 100(2) SVB Staking Notes.pdf Scanned image, not read.
  • StakingReports/Channel Grading/UT ARCH 100(2) SVB Staking Notes.xlsx Read.
  • StakingReports/Channel Grading/UT ARCH 100(2) SVWB Staking Notes.pdf Scanned image, not read.
  • StakingReports/Channel Grading/UT ARCH 100(2) SVWB Staking Notes.xlsx Read.
  • StakingReports/Channel Grading/UT ARCH 100(2) WCB Staking Notes.pdf Scanned image, not read.
  • StakingReports/Channel Grading/UT ARCH 100(2) WCB Staking Notes.xlsx Read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 11 00 - 16 40 Blue Tops Cross Section.pdf Scanned image, not read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 11 00 - 16 40 Blue Tops Cross Section.xlsx Read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 11 00 - 16 40 Finished Surface.xlsx Read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 11 00 - 16 40 Finshed Surface.pdf Scanned image, not read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 11 00 - 16 40 Subgrade Cross Section.pdf Scanned image, not read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 11 00 - 16 40 Subgrade Cross Section.xlsx Read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 17 40 - 29 36 Blue Tops Cross Section.pdf Scanned image, not read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 17 40 - 29 36 Blue Tops Cross Section.xlsx Read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 17 40 - 29 36 Finished Surface Cross Section.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 17 40 - 29 36 Finished Surface.xlsx Read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 17 40 - 29 36 Subgrade Cross Section.pdf Scanned image, not read.
  • StakingReports/DAR/DAR Option X/ARCH 100(2) DAR 17 40 - 29 36 Subgrade Cross Section.xlsx Read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 29 36 - 31 18 Blue Tops.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 29 36 - 31 18 Blue Tops.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 29 36 - 31 18 Finished Surface Cross Section.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 29 36 - 31 18 Finished Surface.xlsx Read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 29 36 - 31 18 Subgrade Surface Cross Section.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 29 36 - 31 18 Subgrade Surface.xlsx Read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 32 18 - 37 50 Blue Tops.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 32 18 - 37 50 Blue Tops.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 32 18 - 37 50 Finished Surface Cross Section.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 32 18 - 37 50 Finished Surface.xlsx Read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 32 18 - 37 50 Subgrade Surface.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 32 18 - 37 50 Subgrade Surface.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 38 50 - 47 00 Blue Tops.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 38 50 - 47 00 Blue Tops.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 38 50 - 47 00 Finished Surface.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 38 50 - 47 00 Finished Surface.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 38 50 - 47 00 Subgrade Surface.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 38 50 - 47 00 Subgrade Surface.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 47 00 - 81 50 Blue Tops.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 47 00 - 81 50 Blue Tops.xlsx Older version, not read.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 47 00 - 81 50 Finished Surface.pdf Not read: over our length limit.
  • StakingReports/DAR/DAR Schedule A/ARCH 100(2) DAR 47 00 - 81 50 Finished Surface.xlsx Older version, not read.
  • StakingReports/Wolfe/UT ARCH 100(2) WOLFE Blue Tops Staking Notes.pdf Not read: over our length limit.
  • StakingReports/Wolfe/UT ARCH 100(2) WOLFE Blue Tops Staking Notes.xlsx Older version, not read.
  • StakingReports/Wolfe/UT ARCH 100(2) WOLFE Finished Grade Staking Notes.pdf Not read: over our length limit.
  • StakingReports/Wolfe/UT ARCH 100(2) WOLFE Finshed Grade Staking Notes.xlsx Read.
  • StakingReports/WRAP/ARCH 100(2) WRAP Blue Tops.pdf Not read: over our length limit.
  • StakingReports/WRAP/ARCH 100(2) WRAP Blue Tops.xlsx Older version, not read.
  • StakingReports/WRAP/ARCH 100(2) WRAP Finished Surface.pdf Not read: over our length limit.
  • StakingReports/WRAP/ARCH 100(2) WRAP Finished Surface.xlsx Older version, not read.
  • StakingReports/WRAP/ARCH 100(2) WRAP Subgrade Surface.pdf Not read: over our length limit.
  • StakingReports/WRAP/ARCH 100(2) WRAP Subgrade Surface.xlsx Older version, not read.
  • StakingReports/Template Point ID sheet 1.pdfTemplate point diagrams for road cross sections; read it if you plan survey work. Read.
  • StakingReports/Template Point ID sheet 2.pdfMore template point diagrams for road cross sections; read it if you plan survey work. Read.
  • StakingReports/Template_Point_Identification FLH Web.pdf Not read: over our length limit.
  • Superelevation/ARCH 100(2) DAR Superelevation data.pdf Scanned image, not read.
  • Superelevation/ARCH 100(2) DAR Superelevation data.xlsx Read.
  • Superelevation/ARCH 100(2) WOLFE Superelevation data.pdf Scanned image, not read.
  • Superelevation/ARCH 100(2) WOLFE Superelevation data.xlsx Read.
  • Surfaces/DXF/Channel Grading DXF.bak Could not be read.
  • Surfaces/DXF/Channel Grading DXF.dxf Could not be read.
  • Surfaces/DXF/DAR DXF.bak Could not be read.
  • Surfaces/DXF/DAR DXF.dxf Could not be read.
  • Surfaces/DXF/WOLFE DXF.bak Could not be read.
  • Surfaces/DXF/WOLFE DXF.dxf Could not be read.
  • Surfaces/DXF/WRAP DXF.bak Could not be read.
  • Surfaces/DXF/WRAP DXF.dxf Could not be read.
  • Surfaces/3R Section.UT NP ARCH 100(2) Blue Tops.xml Could not be read.
  • Surfaces/DAR Blue Tops 4R.xml Could not be read.
  • Surfaces/DAR Finished Surface 4R.xml Could not be read.
  • Surfaces/DAR Subgrade 4R.xml Could not be read.
  • Surfaces/SVB Surface.xml Could not be read.
  • Surfaces/SVW-Surface.xml Could not be read.
  • Surfaces/UT_ARCH_100(2)_Delicate_Arch_Existing_Ground.xml Could not be read.
  • Surfaces/Winter Camp Wash.xml Could not be read.
  • Surfaces/WOLFE - Blue.xml Could not be read.
  • Surfaces/WOLFE Finished Surface.xml Could not be read.
  • Surfaces/WRAP Finished Surface.xml Could not be read.
  • ARCH 100(2) DAR Earthwork Summary Option X.pdfThe government estimate of cut, fill and borrow for Option X; read it for planning and sign nothing. Read.
  • ARCH 100(2) DAR Earthwork Summary Schedule A.pdfThe government estimate of cut, fill and borrow for Schedule A; read it for planning and sign nothing. Read.
  • electronic-file-disclaimer.docAn FHWA disclaimer that the electronic working files are not guaranteed and are not contract documents; read it before you use any file. Read.

Download the archive from SAM.gov.

Not stated in what we read

  • The project plans could not be read, and the geotechnical report, hydraulics report and several surface and staking files were left out. Read them on SAM.gov before you price.
  • The construction wage rates (Davis-Bacon section D) are not in the pages provided.
  • The bid guarantee amount, insurance minimums and bond amounts are not stated in the text provided.
  • The current award date and whether funds are available. The notice schedule (award November 2026) is older than the bid date.
  • The holiday work limits (Table 108-2) and road closure windows (Table 156-1) are not in the pages provided.
  • The source of borrow fill and how borrow is paid, since the earthwork summary estimates borrow but the bid schedule has no borrow pay item.

Notice text

PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch.

Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations.

SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing.

The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Federal Highway Administration for the same kind of work (NAICS 237310, service code Y1LB) in Utah that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Federal Highway Administration by email

Each morning we'll send the new solicitations and sources-sought notices from Federal Highway Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy