Replace overhead crane at Building 9320, Vandenberg, CA
The Air Force wants the existing indoor crane in Building 9320 at Vandenberg Space Force Base removed and replaced with a 4-ton bridge crane carrying two 2-ton hoists, installed, load tested and turned over.
Official title: Vandenberg Crane Replacement
- Deadline
- Dec 11, 3:00 PM MT
- 15 days left
- Last time
- $131K
- Likely Marine Travelift Inc
- Place
- Lompoc, CA
- Buyer: FA8227 AFSC Ol H Pzim
What they're buying
The work must be finished 36 weeks after award, and only small businesses may bid.
Top catches
“Soliciation deadline has now been extended to 11 December 2026.” Notice text
The attached solicitation says 23 November at 1500 MT, but the update gives 11 December with no time. SAM shows 15:00 MT, so confirm the time in writing with the Contracting Officer, not the ombudsman, before you send your offer. Likely, not stated outright.
“There is currently no nonmanufacturer waiver for the applicable NAICS code for this acquisition.” Vandenberg_Crane_Consolidated_Questions_and_Answers.pdf, page 2
The set-aside applies, and the nonmanufacturer rule (FAR 52.219-33) is listed. The Air Force confirmed no waiver exists for this NAICS code. If you would supply the crane as a reseller rather than the maker, check that you qualify before you bid.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 15 of 17 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove the existing crane, hoists, trolleys, controls and electrical parts not reused. Palletize and stage them in the Building 9320 storage yard, and dispose of waste off base under an approved plan.
- Furnish and install a new under-running single-girder bridge crane rated 4 tons, CMAA Class D, with two 2-ton wire rope hoists on independent trolleys and at least 36 feet of lift.
- Verify the existing runway, building supports and seismic loads with California PE-stamped calculations. Supply new conductor bars and festoon systems; the existing 460 V disconnect is reused.
- Provide pendant and backup radio controls, overload trip set at 2.2 tons per hoist, two upper limits, travel strobe, and trolley bumpers plus an anti-collision device between hoists.
- Run static and dynamic proof-load tests at 125 percent (2.5 tons per hoist; 5.0 tons for the bridge), then NDE on new safety-critical parts. Send the signed test report within 10 days.
- Deliver the CDRL data items, give one-time familiarization training to up to six Government staff, and provide a one-year warranty from final acceptance.
Who supplied it lately
$131K
on a recent contract for the same kind of product: Marine Travelift Inc. It ended Sep 17, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Deadline moved to 11 December. The attached solicitation says 23 November at 1500 MT, but the update gives 11 December with no time. SAM shows 15:00 MT, so confirm the time in writing with the Contracting Officer, not the ombudsman, before you send your offer.
- Nonmanufacturer rule, no waiver. The set-aside applies, and the nonmanufacturer rule (FAR 52.219-33) is listed. The Air Force confirmed no waiver exists for this NAICS code. If you would supply the crane as a reseller rather than the maker, check that you qualify before you bid.
- Lowest price must still meet specs. Only the lowest offer is checked for technical acceptance first, and the next lowest only if it fails. A low price that misses a spec, such as the 4-ton capacity or Class D rating, loses the award. Price every SOW item before you submit.“The contract will be awarded to the firm with the lowest price, which also fully meets all specifications outlined in the SOW.” 15853 - Vandenberg Crane Replacement Combo.docx
- Heavy metals in legacy coatings. Assume the old crane coatings contain lead and chromium. You must provide employee training, exposure monitoring and PPE. The Government's industrial hygiene surveys come only after award, so price these costs as a risk.“Existing coatings on legacy equipment should be assumed to contain heavy metals (lead, chromium) and handled with appropriate industrial safety controls.” Vandenberg_Crane_Consolidated_Questions_and_Answers.pdf, page 8
- RSVP for 2 December site visit. Attendance is optional, but to attend you must email an RSVP by 30 November 2026. Include a scan of government ID, plus vehicle registration, insurance or a rental agreement for any vehicle you bring on base. Put the Notice ID in the subject and copy both contacts.“Please email NLT 30 November 2026 to RSVP to attend the site visit.” Notice text
Key terms
| Who can bid | Small businesses onlyNAICS 333923, size standard 1,250 employees. No nonmanufacturer waiver applies.15853 - Vandenberg Crane Replacement Combo.docx |
|---|---|
| Contract period | 36 weeks after award (ARO)The Q&A says this covers design approvals, fabrication, removal, installation, proof-load testing and final acceptance.15853 - Vandenberg Crane Replacement Combo.docx |
| How they choose | Lowest price technically acceptable (LPTA)The lowest priced offer must also meet every SOW spec. The next lowest offer is checked only if the first fails.15853 - Vandenberg Crane Replacement Combo.docx |
| How to submit | Email to both Air Force contactsThe date in this quoted line is superseded by the update. Include the Notice ID and project title in the subject line.15853 - Vandenberg Crane Replacement Combo.docx |
| Questions due | Closed: 6 November 2026 at 1500 MTQuestions were due by this date. The Government answers are in the consolidated Q&A file.15853 - Vandenberg Crane Replacement Combo.docx |
| Contract type | Commercial item buy, one lotThe notice does not name the pricing type. FOB Destination delivery applies.15853 - Vandenberg Crane Replacement Combo.docx |
| Site visit | 2 December 2026; RSVP by 30 November 2026Attendance is not required to quote. The earlier 28 October visit has passed.Notice text |
How to respond
- Email your offer to hugo.ruano_gutierrez.1@us.af.mil and lauren.reigenborn@us.af.mil, with both addresses on every message and the Notice ID cab0baf7876042839483c358ac7ccfad and project title Vandenberg Crane Replacement in the subject line.
- Include your CAGE code and UEI with the offer, and confirm your SAM registration is current.
- Send the offer by Friday, 11 December 2026 at 15:00 MT. Confirm that time in writing first, since the update did not restate it.
- Page limits and required pricing forms: Not stated. The notice requires compliance with FAR 52.212-1 and 52.212-2.
- If you plan to attend the 2 December site visit, email your RSVP and ID documents by 30 November 2026.
Attached files
From SAM.gov. Download links open the original files.
- Vandenberg_Crane_Consolidated_QnA Addition.docx Could not be read.
- CDRL - A005.pdfDD Form 1423 for the spare parts list due 15 days after award. You prepare and deliver it. Read.
- CDRL - A009.pdfDD Form 1423 for the nondestructive examination plan due 30 days before proof-load testing. You prepare and deliver it. Read.
- CDRL - A012.pdfDD Form 1423 for the site-specific safety plan due 15 days before site work. No site work starts until it is approved. Read.
- CDRL - A002.pdfDD Form 1423 for structural and mechanical drawings and calculations, which must be PE-stamped. You prepare and deliver it after award. Read.
- CDRL - A003.pdfDD Form 1423 for commercial operation and maintenance manuals due 30 days before turnover. You prepare and deliver it after award. Read.
- CDRL - A004.pdfDD Form 1423 for electrical single-line and schematic documents. The first version is due before fabrication. Read.
- 309 MXSG SOW - Vandenburg Crane - Final (10-19-26).docxThe statement of work listing every task, spec and deliverable. Read it in full and price every item; you do not sign it. Read.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9d28dcffc6df40009b7c2eea72858a84/download Could not be read.
- CDRL - A011.pdfDD Form 1423 for the integrated master schedule due 15 days after award and updated monthly. You prepare and deliver it. Read.
- CDRL - A006.pdfDD Form 1423 for manufacturer test reports and certificates due before field installation. You prepare and deliver it. Read.
- CDRL - A010.pdfDD Form 1423 for the preventive maintenance and inspection plan due 30 days before turnover. You prepare and deliver it. Read.
- 15853 - Vandenberg Crane Replacement Combo.docxThe combined synopsis and solicitation with evaluation basis, offer instructions and clauses. Follow it when you submit your offer. Read.
- CDRL - A008.pdfDD Form 1423 for the final test report and crane certification due 10 days after testing. You prepare and deliver it. Read.
- Vandenberg_Crane_Consolidated_Questions_and_Answers.pdfOfficial government answers to industry questions that clarify and sometimes change the SOW. Read all nine pages; nothing to sign. Read.
- CDRL - A001.pdfDD Form 1423 for the crane removal plan due before removal starts. You prepare and deliver it after award, so price it. Read.
- CDRL - A007.pdfDD Form 1423 for the proof-load test plan due 30 days before testing. The Government needs 15 days to approve it. Read.
Not stated in what we read
- The file Vandenberg_Crane_Consolidated_QnA+Addition.docx and one linked SAM.gov file could not be read. You must read both yourself before you price.
- Estimated contract value: Not stated.
- Service Contract Act wage determination: the Q&A says one applies, but none was provided, and the solicitation also lists exemption clauses.
- Existing crane size, runway length, span and clearances: not provided, and the Government will not give drawings before the offer due date.
- Page limits and required pricing forms: Not stated.
- Whether the 36-week schedule can be extended if long-lead hoists run late: the Government will only discuss it if lead time passes 36 weeks.
Notice text
23 November Update: A second site visit is being set up for 2 December 2026. Please email NLT 30 November 2026 to RSVP to attend the site visit. RSVP is required to attend. Site visit attendance is not required to quote on this project. Soliciation deadline has now been extended to 11 December 2026. Please reference this requirement Notice ID and Project Title in subject line of any email correspondance. Please include Hugo Ruano Gutierrez and Lauren Reigenborn in ALL email correspondance.
This requirement includes a site visit on 28 October 2026 and an RSVP is required for attendance. Please RSVP NLT 1500 Mountain Time on 26 October 2026. When RSVPing please provide a scan of official government issued ID such as driver's licesnse or passport and current registration, proof of insurance, or valid rental vehcile agreement as applicable for any vehicle(s) you will be brining on the installation.
As published on SAM.gov.
Contacts
- Hugo Ruano Gutierrez, hugo.ruano_gutierrez.1@us.af.mil, 8015866992
- Lauren Reigenborn, lauren.reigenborn@us.af.mil, 8015862375
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Air Force for the same kind of product (NAICS 333923, product code 3950) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Gantry Crane Repair PartsMarine Travelift Inc · FA910126PB026 | $131,174 | Sep 17, 2026ended | NM |
| 21 Soamxs - Spyder CranesSpydercrane.com, LLC · FA520925P0102 | $242,080 | Mar 8, 2026ended | AZ |
| 36 MXS/MXMFM - Telescopic Boom Lifts With Direct Shipping and Delivery to Andersen AFB GuamMonmouth Solutions, Inc · FA524025P0128 | $322,976 | Dec 22, 2025ended | GU |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 11, 3:00 PM MT15 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 333923, overhead traveling crane, hoist, and monorail system manufacturing, soonest deadline first.
- Defense Logistics AgencyFour fairlead rollers for DLA Distribution
- Department of the NavyTwo hoist blocks for USS Essex, San Diego, CA
- Defense Logistics AgencyTwo middle boom extensions for DLA San Joaquin
- Defense Logistics Agency3 hydraulic power modules for DLA San Joaquin
- Defense Logistics AgencySafe cable assemblies for DLA Cherry Point
- Defense Logistics AgencyNine chain hoists for DLA Distribution
- Department of the ArmyReplace seven low-level cranes at Anniston Army Depot, AL
- Defense Logistics AgencyLuff hoist wire ropes for Portsmouth Naval Shipyard, ME
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy