Concrete canal panel repairs near Yuma, Arizona
Replacing damaged concrete lining panels in the MOD, MODE and US Bypass canals near Yuma, Arizona.
Official title: Y--MOD/MODE/US BYPASS CANAL REPAIRS
- Deadline
- Dec 14, 9:00 AM PT
- 19 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Reclamation Contracting Activity
What they're buying
The work covers about 9,915 square feet of new panels, joints, backfill and crack sealing, done during a canal outage planned for March 2027.
Top catches
“Response deadline: 2026-12-14T09:00:00-08:00” SAM.gov record
SAM lists 9:00 a.m. at -08:00, but Form SF-1442 says 1200 local time on the same date. Amendment 0001 says it corrects the time zone. Ask the Contract Specialist to confirm the exact time in writing and deliver before the earliest possible time.
“Failure of a offeror to acknowledge receipt of this amendment may result in rejection of the proposal.” Sol_140RR027R0009_Amd_0001.pdf, page 3
Amendment 0001 changes Section H, the offer time zone and the sign-in sheet. Your offer must acknowledge it before the deadline, or the offer may be rejected.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 11 of 18 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Saw cut, remove and haul away about 9,915 square feet of damaged concrete canal panels, plus debris and vegetation (CLIN 1005 and 1006)
- Furnish and place about 9,915 square feet of new 3-1/2 inch thick, 3,000 psi concrete panels (CLIN 1008)
- Furnish, place and compact about 146 tons of backfill, including subgrade preparation (CLIN 1007)
- Furnish and install about 638 linear feet of groove joints and 1,681 linear feet of Type 2 expansion joints (CLIN 1009 and 1010)
- Seal about 300 linear feet of cracks in existing canal lining (CLIN 1011)
- Traffic control, mobilization, bonds, insurance and material testing, plus optional CLSM fill of about 10 cubic yards (CLIN 1001 to 1004, 1012 and optional 1013)
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline time conflicts. SAM lists 9:00 a.m. at -08:00, but Form SF-1442 says 1200 local time on the same date. Amendment 0001 says it corrects the time zone. Ask the Contract Specialist to confirm the exact time in writing and deliver before the earliest possible time.
- Acknowledge amendment 0001. Amendment 0001 changes Section H, the offer time zone and the sign-in sheet. Your offer must acknowledge it before the deadline, or the offer may be rejected.
- Performance period conflicts. The SOW says 120 calendar days from award, but Form SF-1442 lists 01/18/2027 to 03/17/2027, and the canal outage is March 1 to 18, 2027. Ask the contracting officer which period controls before you build your schedule and price.“Period of Performance: 01/18/2027 to 03/17/2027” Sol_140RR027R0009.pdf, page 3
- Only 14 days inside canals. You get 14 continuous days inside the canals after drawdown, and work in the canals must end the day before reopening. Concrete placed late must reach 500 psi before the outage ends, so plan crews, concrete and curing to fit that window.“The Contractor will be provided 14 continuous days to perform the required work within the canals following completion of the canal water drawdown.” Attachment_03_MMB_Specifications_20260910_1425d.pdf, page 7
- Bid guarantee and bonds required. A bid guarantee is required, and performance and payment bonds are due within 10 days after award for work over $150,000. Confirm with your surety before you bid. The bond forms were not included here, so read them on SAM.gov.“A bid guarantee will be required.” Solicitation_No_140RR027R0009.docx
- Overrun pay rules conflict. The base solicitation says no claim may be made for overruns or underruns, but Amendment 0001 adds an equitable adjustment for quantities outside 85 to 115 percent of the estimate. Ask the contracting officer how extra panels are paid, and do not start added quantities without written CO approval.“No claim shall be made against the Government for overruns or underruns.” Solicitation_No_140RR027R0009.docx
Key terms
| Who can bid | HUBZone small businesses only (100% set-aside)NAICS 237990 size standard is $45M, per the solicitation.Sol_140RR027R0009.pdf, page 1 |
|---|---|
| Contract period | 120 calendar days from award; canal outage March 1 to March 18, 2027Form SF-1442 lists 01/18/2027 to 03/17/2027. See catches.Attachment_01_MMB_SOW_20260910_2197e.pdf, page 2 |
| How they choose | One firm-fixed price contract, likely awarded without discussionsEvaluation rules are in Section M, which was not provided. The table of contents titles M.2 as Quality and Cost/Price Approximately Equal.Solicitation_No_140RR027R0009.docx |
| How to submit | Sealed offer to Boulder City, NV, Attn: Ebonie Foskey-AndersonItem 7 shows 500 Fir Street and Item 8 shows 500 Date Street. Confirm the address before you send.Sol_140RR027R0009.pdf, page 1 |
| Questions due | Tuesday, December 1, 2026, 12:00 p.m. Arizona TimeWritten questions only, by email to ebonie_foskey-anderson@ios.doi.gov, with the RFP number in the subject line.Solicitation_No_140RR027R0009.docx |
| Estimated value | Between $500,000 and $1,000,000This is a magnitude estimate for disclosure. No bid price or budget is stated.Sol_140RR027R0009.pdf, page 1 |
| Contract type | Firm-fixed price construction contract (FAR Part 36 and Part 15)Price schedule has lump sum and unit-priced lines.Solicitation_No_140RR027R0009.docx |
| Site visit | Held November 19, 2026, 9:30 a.m. Arizona Time (already passed)Vendors are urged and expected to inspect the site. The notice does not say the visit was mandatory.Solicitation_No_140RR027R0009.docx |
How to respond
- Confirm the closing time in writing with Ebonie Foskey-Anderson, because SAM shows 09:00 at -08:00 and Form SF-1442 shows 1200 local time.
- Acknowledge Amendment 0001 in your offer or by a separate email that cites solicitation 140RR027R0009 and the amendment number, before the deadline.
- Prepare one original and one copy of your offer on Form SF-1442, with prices for Table 1 and optional Table 2 and a bid guarantee. Section L proposal instructions were not provided, so other required content is not stated.
- Seal the offer with your name and address, solicitation number 140RR027R0009, and the date and time due. Deliver to Bureau of Reclamation, Attn: Ebonie Foskey-Anderson, at the Item 8 address in Boulder City, NV. Electronic submission: Not stated.
- Send any written questions by email to ebonie_foskey-anderson@ios.doi.gov by December 1, 2026, at 12:00 p.m. Arizona Time, with the RFP number in the subject line.
Attached files
From SAM.gov. Download links open the original files.
- Attachment_03_MMB_Specifications_20260910_1425d.pdfTechnical specifications for general requirements and earthwork; page 30 was not provided, so read the full file on SAM.gov. Read in part (pages 1–29 and 31–47 of 47).
- Attachment_01_MMB_SOW_20260910_2197e.pdfStatement of work for the canal repairs, including schedule, outage dates and rules you must follow when pricing; read only. Read.
- Attachment_12_-_Past_Performance_Questionnaire.pdf Not read: over our length limit.
- Attachment_11_-_Bid_Bond_SF24-23a.pdf Not read: over our length limit.
- Solicitation_No_140RR027R0009.docxSolicitation text covering the foreword, price schedule, contract clauses and bonding; only the start was provided, so read the full file. Read in part.
- Attachment_09_-_Payment_Bond_SF25A-23a.pdf Not read: over our length limit.
- Sol_140RR027R0009.pdfForm SF-1442 cover with the deadline, price schedule and offer page; you must complete the price and offer sections. Read.
- Attachment_04_MMB_Drawings_Set_20260910_675c8.pdf Scanned image, not read.
- Solicitation_No__140RR027R0009_TABLE_OF_CONTENTS_0001.pdfTable of contents for the solicitation; read only. Read.
- Attachment_05_-_LC-045_Form_E_WasteDiversionTable.pdfBlank waste diversion table you must fill in and send within 14 days after disposal work ends. Read.
- Attachment_10_-_Performance_Bond_SF25-23a.pdf Not read: over our length limit.
- Attachment_07_Wage_Determination.pdf Not read: over our length limit.
- Attachment_02_MMB_SOW_Appendix_1_20260910_db389.pdfTable of each panel location with estimated damage and repair size; read for pricing, and quantities must be field verified. Read.
- Attachment_06_-_LC-035_HazMaterialAuthorization.pdf Not read: over our length limit.
- 140RR027R0009_Sign_in_Sheet_0001.pdfSign-in sheet from the November 19, 2026 site visit; read only, and no action is needed. Read.
- Attachment_08_-_DI-137_Release_of_Claims.pdfBlank release of claims form you must sign and return before final payment. Read.
- Solicitation_No_140RR027R0009_Section_H_0001.pdfSection H clause H.3 on variation in estimated quantity, added by Amendment 0001; read it when pricing quantities. Read.
- Sol_140RR027R0009_Amd_0001.pdfAmendment 0001 changing the time zone, adding H.3 and attaching the sign-in sheet; you must acknowledge it. Read.
Not stated in what we read
- Estimated price or budget beyond the magnitude range, which is not stated.
- Section L proposal instructions and Section M evaluation factors, which were not provided.
- Bid guarantee amount and performance and payment bond amounts, which are not stated in the text provided.
- Wage determination (Attachment_07_Wage_Determination.pdf), which was not included; you must read it for labor rates.
- Whether electronic or email submission of offers is accepted, which is not stated.
- Drawings (Attachment_04, scanned) and the hazardous materials authorization (Attachment_06) could not be reviewed; you must read them on SAM.gov.
Notice text
MOD/MODE/US BYPASS CANAL REPAIRS
As published on SAM.gov.
Contacts
- Foskey-Anderson, Ebonie, efoskeyanderson@usbr.gov, 7022938149
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 14, 9:00 AM PT19 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237990, other heavy and civil engineering construction, soonest deadline first.
- Department of Veterans AffairsStormwater upgrades at Crown Hill cemetery, Indianapolis, IN
- Bureau of Indian Affairs96-inch culvert replacement on BIA Route 3, Cibecue, AZ
- Department of the ArmyNew baseball stadium at USAF Academy, Colorado Springs, CO
- Department of the ArmyLock and dam rehabilitation, Chicago, Illinois
- Department of the ArmyDredge containment repairs, Savannah and Brunswick, GA
- Departmental OfficesWater recirculation pipeline and pump, Pixley refuge, CA
- Department of the ArmyMaintenance dredging task orders, South Atlantic region
- Department of Veterans AffairsPhase 1 cemetery construction, Albuquerque, NM
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy