Waterline replacement at Red Canyon, Daggett County, UT

The Forest Service wants a contractor to replace about 4,450 to 4,475 feet of old asbestos cement water pipe with 4-inch HDPE pipe in the Red Canyon area of the Ashley National Forest, Daggett County, Utah, including two air-vacuum valves, drains and service connections.

Official title: Ross Springs Waterline Replacement

Deadline
Dec 1, 3:00 PM MT
6 days left
Who can bid
Small businesses
Size standard for NAICS 237110: $45 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
UT
Buyer: Ashley National Forest

What they're buying

Work must finish within 90 days after notice to proceed.

Top catches

Deadline conflicts across documents
“11/21/2026” C04a SF-1442 1240LT27Q0022.pdf, page 1

The SF-1442 cover page shows 11/21/2026 at 1500 local time, a date that has already passed. The SAM.gov record shows Tuesday, December 1, 2026 at 3:00 PM (-07:00), so confirm the date in writing with the contracting officer before you plan to submit.

Do not disturb asbestos line
“Contractor shall not disturb the existing waterline due to hazmat issues.” Prebid Meeting for Ross Springs waterline Clarifications.docx

The clarifications say you must not disturb the asbestos waterline, but they also say you must lift and bed live pipe lying on rocks from Sta 45+36.5 to 55+30. Ask in writing how this should be done and who pays for any asbestos handling.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 5 of 7 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Install 4-inch HDPE water main, about 4,450 linear feet per the plans (4,475 per the Schedule of Items), mostly shallow bury or laid on cleared ground under imported fill.
  • Cover about 1,150 linear feet of existing pipeline with imported fill from a government source.
  • Set 2 combination air-vacuum valves in utility boxes; the Schedule of Items lists 48-inch concrete boxes.
  • Install valves, daylight drains, pumpout drains, curb boxes, and a 20-foot 5-inch steel pipe sleeve under the road crossing, and connect to existing laterals and services.
  • Place 1,250 cubic yards of select borrow from the government source stockpile near the Red Canyon Duplex.
  • Stake the pipe centerline for the COR's approval (surveying is not a separate pay item), and install 3 grounded and 8 non-grounded locating system access points.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline conflicts across documents. The SF-1442 cover page shows 11/21/2026 at 1500 local time, a date that has already passed. The SAM.gov record shows Tuesday, December 1, 2026 at 3:00 PM (-07:00), so confirm the date in writing with the contracting officer before you plan to submit.
  • Do not disturb asbestos line. The clarifications say you must not disturb the asbestos waterline, but they also say you must lift and bed live pipe lying on rocks from Sta 45+36.5 to 55+30. Ask in writing how this should be done and who pays for any asbestos handling.
  • HVAC wording in experience test. The experience test asks for two past projects in the last five years and mentions HVAC work, which does not match a waterline job. Ask in writing whether waterline projects count, and send your two closest matches, because weak information can make your quote unacceptable.“Projects should demonstrate experience performing HVAC installation” C04b 1240LT27Q0022.pdf, page 14
  • Bid guarantee and full bonds. The notice requires a payment bond for 100 percent of the price and performance bonds within 15 days after award, and it may require a bid guarantee of up to 20 percent. Ask your surety now whether you can get these bonds before you quote.“The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.” C04b 1240LT27Q0022.pdf, page 17
  • Pipe length differs by 25 feet. The notice text and plans say 4450 linear feet, but the solicitation and its Schedule of Items say 4475. Ask the contracting officer which quantity your unit prices will be paid on, and price the work to that figure.“Installation of 4475 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.” C04b 1240LT27Q0022.pdf, page 1
  • Domestic pipe and valves only. The Buy American clause is marked, and the list of allowed foreign materials says None, so HDPE pipe, valves and boxes likely must be domestic. Get written domestic-origin confirmation from your suppliers before you price, since a foreign item could make your quote noncompliant.“The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.” C04b 1240LT27Q0022.pdf, page 8

Key terms

Who can bidSmall businesses only (total set-aside)NAICS 237110. The size standard is written as $45 with no unit.SAM.gov record
Contract period90 days from notice to proceedStart within 15 calendar days after award. Bonds are due within 15 days after award.C04b 1240LT27Q0022.pdf, page 12
How they chooseLowest price among technically acceptable quotesTechnical part is pass or fail. There are no trade-offs between price and non-price factors.C04b 1240LT27Q0022.pdf, page 13
How to submitEmail to derrick.dodson@usda.govThe form also mentions an original and one copy in sealed envelopes. Confirm how to deliver.C04a SF-1442 1240LT27Q0022.pdf, page 1
Contract typeFirm fixed price, single awardYou must price every line item on the Schedule of Items.C04b 1240LT27Q0022.pdf, page 12
Site visitNo official site visit; visit encouragedA pre-bid meeting was held 11/18/2026, and its notes are attached.C04b 1240LT27Q0022.pdf, page 12

How to respond

  1. Confirm the due date in writing with Derrick Dodson, the contracting officer, because the SF-1442 shows 11/21/2026 at 1500 local time while the SAM.gov record shows 2026-12-01 at 15:00 (-07:00).
  2. Complete the offer block on page 2 of the SF-1442: name, address, phone, an acceptance period of at least 60 calendar days in item 17, the amendment acknowledgment, and your signature in item 20.
  3. Price every line on the Schedule of Items, including mobilization, removal and the lump-sum items, because a missing price can get your quote excluded.
  4. Send the completed SF-1442 and your technical quote (two past projects, staffing and schedule, equipment, and a statement of any exceptions) to derrick.dodson@usda.gov. The form also refers to an original and one copy in sealed envelopes, so ask how the offer must be delivered.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • We could not review two attachments on SAM.gov, and the Statement of Work (C04c) named in the solicitation is not among the files we read. You must read those yourself.
  • The estimated contract value is not stated, and the Schedule of Items shows no total.
  • The deadline for written questions is not stated.
  • Who hauls and places the 1,250 cubic yards of government borrow, and how far it is from the stockpile, is not stated.
  • Whether an offer (bid) guarantee applies is unclear, because item 13b of the SF-1442 does not show which box is checked.
  • The DR 9 pipe specification mentioned in the clarifications is not in the files we could read.

Notice text

This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Forest Service by email

Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy