Rainwater system rehab and two buildings, Volcano, HI
Rehabilitate the rainwater catchment and water treatment system at Hawaii Volcanoes National Park, and replace Buildings 43 and 241, under a 610-calendar-day contract.
Official title: Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
- Deadline
- Nov 27, 4:00 PM HT
- 2 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: DSC Contracting Services Division
What they're buying
Four priced options cover a SAR building, water treatment repairs, a perimeter fence, and ground catchment pavement.
Top catches
“Failure to do so may render the proposal unacceptable.” Sol_140P2026R0091.pdf, page 8
Section B lists a base price and Options A to D, and says a proposal without pricing for all options may be unacceptable. Price the base and all four options, and give a schedule of values for each line item.
“BID GUARANTEE: Submit Standard Form 24, Bid Bond duly executed between the Offeror and the bonding company” Sol_140P2026R0091.pdf, page 57
You must send a bid guarantee with your offer, usually a Standard Form 24 bid bond. Item 12b lists 10 calendar days after award for performance and payment bonds, so line up a surety before the deadline. Likely, not stated outright.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 14 of 31 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Rehabilitate the rainwater catchment system: ground catchment, collection pipes, filtration, storage tanks and equipment, and site pavement.
- Demolish and replace Building 43 with a new pre-engineered metal building.
- Demolish and replace Building 241 with a similar open-air steel-column structure, and remove two small accessory buildings under it.
- Section 106 work on five historic redwood tanks: Historic Structure Report assessment and minor repairs.
- Replace the raw water transfer pump with a redundant pump and new controls, and replace the finished water circulation pump.
- Keep water production at 22,000 gallons per day or more during construction, using NSF-approved materials for drinking water contact.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Price every optional item. Section B lists a base price and Options A to D, and says a proposal without pricing for all options may be unacceptable. Price the base and all four options, and give a schedule of values for each line item.
- Bid bond and performance bonds. You must send a bid guarantee with your offer, usually a Standard Form 24 bid bond. Item 12b lists 10 calendar days after award for performance and payment bonds, so line up a surety before the deadline.
- Delivery date conflicts with end date. The CLIN table shows delivery on 12/21/2028, but the period of performance ends 07/03/2028. Liquidated damages are $1,558 per calendar day of delay, so ask the contracting officer which date governs before you price the schedule.“Delivery: 12/21/2028” Sol_140P2026R0091.pdf, page 3
- SAR building and fence may be options. Section C and the Building 241 scope say the base work includes a new one-story CMU building and fence replacement, but the project specifications and Section B list these as options. Ask which items are in the base price, and price them separately.“Option for constructing a new one-story CMU building (SAR Building) under Building 241.” B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf, page 9
- Keep the park's water running. You must keep water production at 22,000 gallons per day or more during the work. Utility outages are limited to two to four hour windows and need prior approval, so price any bypass or trucked water before you bid.“production rate of 22,000 gallons per day.” B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf, page 13
- Government moves contents first. NPS may need up to eight weeks to move its stored contents after the containers are ready. Demolition under Buildings 43 and 241 cannot start until the contracting officer confirms the area is free, so build that wait into your schedule.“Demolition or other Work requiring cleared areas beneath Buildings 43 and 241 shall not commence until the Contracting Officer confirms the applicable area is available to the Contractor.” B09_Att_(26)_Supplemental-Technical-Addendum_02_0004.xlsx
Key terms
| Who can bid | Open to all firms; no set-asideThe size standard for NAICS 237110 is in Section K, which was not provided.Sol_140P2026R0091.pdf, page 1 |
|---|---|
| Contract period | 610 calendar days after notice to proceedThe solicitation's CLIN table shows 11/01/2026 to 07/03/2028, and a delivery date of 12/21/2028 also appears.Sol_140P2026R0091.pdf, page 3 |
| How they choose | Best value tradeoff; lowest price not automatically requiredPrice is added to the total of all optional CLINs. The Government plans to award without discussions.Sol_140P2026R0091.pdf, page 58 |
| How to submit | Not stated in the pages provided (Item 8 refers to Section L)Volume II is one electronic copy with no hard copies. Section L, which sets the submission address, was not provided.Sol_140P2026R0091.pdf, page 57 |
| Estimated value | Over $25 million (size band only)No exact dollar estimate appears in the provided text.Sol_140P2026R0091.pdf, page 1 |
| Contract type | Firm-fixed-price, lump sum line itemsEach base and option CLIN is priced as a lump sum (LS).Sol_140P2026R0091.pdf, page 8 |
| Site visit | Wednesday, September 30, 2026 (already passed)Whether attendance was required is in Section L, which was not provided.B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdf, page 1 |
How to respond
- Get the complete solicitation from SAM.gov, including Section L, because the submission address and rules are not in the pages provided.
- Send your offer to the address in Section L, which Item 8 points to. Not stated in the provided text.
- Submit Volume II as one electronic copy with no hard copies. Include SF 1442 blocks 14 to 20C, acknowledgment of Amendments 0001 to 0004, Section B prices with a schedule of values for each line item, the SF 24 bid bond, Section K, and the General References form.
- Have an official who can bind your company sign the SF 1442.
- Get the offer in by Friday, November 27, 2026, 16:00 (-10:00 as written).
Attached files
From SAM.gov. Download links open the original files.
- B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdfSite visit agenda and rules. Read only; the visit date has passed. Read.
- B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf Not read: over our length limit.
- B09_Att_(21)_REFERENCE_Redwood-Water-Tank-Drawing_0003.pdf Scanned image, not read.
- Sol_140P2026R0091_Amd_0004.pdfAmendment 0004 sets the current due date of November 27, 2026 and adds attachments 25 and 26. You must acknowledge it with your offer. Read.
- Sol_140P2026R0091_Amd_0003.pdfAmendment 0003 extends the due date to November 20, 2026 and adds attachments 16 to 24. Read only; its date is superseded. Read.
- B09_Att_(24)_REFERENCE_PrePropSiteVisitSignInSheet_0003.pdf Scanned image, not read.
- B09_Att_(23)_REFERENCE_2024TankInspectionReports_0003.pdf Not read: over our length limit.
- Sol_140P2026R0091.pdfSolicitation form and Sections B, E, F, G, M, and the Volume II instructions, in part. You must fill in and sign the SF 1442 offer blocks and price Section B. Read in part (pages 1–12 and 57–61 of 61).
- B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf Not read: over our length limit.
- B08_Att_(12)_GenRefs.docxGeneral References form. You must fill it in and include it with your offer. Read.
- Sol_140P2026R0091_Amd_0001.pdfAmendment 0001 adds site visit information and points to the site walk agenda. Read only. Read.
- B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf Not read: over our length limit.
- B09_Att_(16)_Pre-Proposal_RFI_Responses_0003.pdf Not read: over our length limit.
- B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf Not read: over our length limit.
- B09_Att_(20)_REFERENCE_ElectricalAsBuiltDrawings_0003.pdf Scanned image, not read.
- B09_Att_(18)_Spec-09-65-00_Resilient-Base_0003.pdfResilient base specification. You must price it if you bid the base flooring trim, and the installer must be an NFCA member. Read.
- B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf Not read: over our length limit.
- B09_Att_(17)_A-E-Technical-Addendum_0003.pdfAddendum log of drawing and specification changes. You must price the changes listed. Read.
- B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdfConsultant memo on construction phasing and water supply. Read for sequencing guidance; no form to fill in. Read.
- B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf Not read: over our length limit.
- B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf Not read: over our length limit.
- B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdfProject specifications, pages 1 to 13 and 1031 to 1040. Read for scope, water rules, and equipment terms; you must price to them. Read in part (pages 1–13 and 1031–1040 of 1040).
- B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx Not read: over our length limit.
- B09_Att_(25)_Revised-RFI-102-Response_0004.xlsxRevised government response on moving stored contents. Read only. Read.
- B09_Att_(26)_Supplemental-Technical-Addendum_02_0004.xlsxAmendment 0004 changes on storage containers, relocation time, and sequencing. Read and price. Read.
- Sol_140P2026R0091_Amd_0002.pdfAmendment 0002 extends the due date to November 6, 2026. Read only. Read.
- B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf Not read: over our length limit.
- B09_Att_(19)_Spec-09-67-23_Resinous-Flooring_0003.pdfResinous restroom flooring specification. You must price it and provide product data and samples. Read.
- B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx Not read: over our length limit.
- B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf Not read: over our length limit.
- B09_Att_(22)_REFERENCE_RedwoodTanks2018TripReport_0003.pdf Not read: over our length limit.
Not stated in what we read
- Where and how to submit offers, since Section L was not provided.
- Whether attendance at the September 30, 2026 site visit was required.
- Question deadline for the solicitation (Section L not provided).
- The size standard for NAICS 237110 and any small business status rules (Section K not provided).
- Davis-Bacon wage determination HI20260001 was not reviewed in this summary; you must read it before pricing labor.
- Several technical files were not reviewed here, including the hazardous material survey, geotechnical reports, and the final drawing set; you must read them.
Notice text
Amendment 4. HAVO 326181 Rehabilitate Rainshed & Water Treatment System located at Hawaii Volcanoes National Park, Volcano, Hawaii
As published on SAM.gov.
Contacts
- Villareal, Abigail, abigail_villareal@nps.gov, 303-884-9985
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 27, 4:00 PM HT2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237110, water and sewer line and related structures construction, soonest deadline first.
- Forest ServiceBarn roof, siding and lead paint work, New Meadows, ID
- Indian Health ServiceReplacement septic system at Shelton home, WA
- Federal Aviation AdministrationWastewater plant upgrade at MMAC, Oklahoma City, OK
- US Coast GuardWater plant repairs at USCG station, Hudgins, VA
- Departmental OfficesSeven water turnout buildings in northwest New Mexico
- Department of the ArmySewage lagoon liner repair, Mud Mountain Dam, Enumclaw, WA
- Forest ServiceWaterline replacement at Red Canyon, Daggett County, UT
- Indian Health ServiceSewage lift station replacement at Rosebud, SD
Free · at most one email a morning
Get new notices from National Park Service by email
Each morning we'll send the new solicitations and sources-sought notices from National Park Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy