Two water tower repairs at VA Illiana, Danville, IL
You would repair and upgrade two water towers, North Water Tower 71 and South Water Tower 94, at the VA Illiana Healthcare System in Danville, IL.
Official title: Z1DA--550-26-121 FY27 NRM Emergent Repairs North Water Tower 71 & South Water Tower 94 CON
- Deadline
- Jan 6, 2027, 1:00 PM CT
- 42 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $2.17M
- Likely Troop Contracting Inc
- Place
- Danville, IL
- Buyer: 252-Network Contract Office 12 (36C252)
What they're buying
The work covers foundation and soil shoring, ladder and fall-protection fixes and an interior epoxy coating, and must finish within 135 calendar days after notice to proceed.
Top catches
“This procurement is a 100% set-aside for CVE Verified Service-Disable Veteran-Owned Small Business Firm (SDVOSB)” S02 Solicitation 36C25227B0008_1.docx
The SAM.gov record leaves the set-aside blank, but the solicitation says the buy is 100 percent SDVOSB. If you are not CVE verified and listed in the SBA database, you are not eligible to bid.
“Bid Opening will occur on January 6, 2026, at 1:00PM CST.” S02 Solicitation 36C25227B0008_1.docx
The bid opening line says January 6, 2026, but the due date is January 6, 2027. Ask the contracting officer in writing to confirm the date and time before you plan travel to Milwaukee.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 3 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- North Water Tower 71: upgrade and repair per plans and specifications, including excavation and soil shoring for foundation repairs and correction of OSHA deficiencies from a VA assessment.
- South Water Tower 94 base bid tasks 1 to 17: thermometer, 24-inch riser manway with davit arm and lock, confined space sign, overflow screen and a safety grill over the riser opening.
- Ladders and fall protection: cable-type ladder safety devices on four ladders, a new interior bowl ladder with standoffs every 10 feet, a roof access ladder replacement and cable routing to remove the climbing hazard.
- Interior coating: abrasive blast to SSPC-SP10 and SP7, spot prime, strip weld seams and apply an epoxy liner to 8 to 10 mils dry film thickness.
- Balcony weep holes, windage rod adjustment for 100 mph winds, two warning signs on the fence, and a water test for human consumption.
- Earthwork and fence: shoring to at least 5 feet below excavation, about 2,500 square yards of subgrade replacement, removal and return of the existing chain link fence and restoration of ground to original condition.
Who did it before
$2.17M
on the contract that likely holds this work now: Troop Contracting Inc. It ended Jun 30, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Set-aside conflict across records. The SAM.gov record leaves the set-aside blank, but the solicitation says the buy is 100 percent SDVOSB. If you are not CVE verified and listed in the SBA database, you are not eligible to bid.
- Bid opening year conflicts with due date. The bid opening line says January 6, 2026, but the due date is January 6, 2027. Ask the contracting officer in writing to confirm the date and time before you plan travel to Milwaukee.
- Email bids are not accepted. Send a sealed hard copy by mail or hand-deliver it to the Milwaukee, WI office. Allow mail time so the bid arrives before the due date.“No email bid submissions will be considered, only in person hard copy and mailed bid submissions will be accepted.” S02 Solicitation 36C25227B0008_1.docx
- Missing certification makes bid non-responsive. A bid without the signed VAAR 852.219-75 certification is rejected before award. The package also needs the bid bond on Standard Form 24 and the other listed forms.“If certification is not included, bid will be considered non-responsive and cannot be considered for award.” S02 Solicitation 36C25227B0008_1.docx
- Price about 2,500 square yards of replacement. Your lump sum must cover roughly 2,500 square yards of unstable subgrade replacement. The specs also require a Professional Geotechnical Engineer on the job and underpinning done by a contractor the COR has prequalified.“Bids shall be based on replacing approximately 2,500 square yards, with an average depth of 6 inches” Attachment 3 - 550-26-121 Bid Documents Project Manual - Specifications.pdf, page 263
- Site visit may be required. The solicitation calls this both a site visit and a pre-bid conference and does not say attendance is required. The specs say the staging area is set at the pre-bid meeting, so plan to attend on December 8 and ask whether it is mandatory.“December 8, 2026, at 10:00AM CST” S02 Solicitation 36C25227B0008_1.docx
Key terms
| Who can bid | CVE-verified service-disabled veteran-owned small businesses only, per the solicitationThe SAM.gov record leaves the set-aside as Not stated.S02 Solicitation 36C25227B0008_1.docx |
|---|---|
| Contract period | 135 calendar days after notice to proceedWork cannot start until required submittals and the CPM schedule are approved.S02 Solicitation 36C25227B0008_1.docx |
| How they choose | Lowest responsive bid from a responsible bidderSingle award on the base bid only.S02 Solicitation 36C25227B0008_1.docx |
| How to submit | Sealed hard copy, in person or by mail, to Milwaukee, WIEmail bids are not accepted.S02 Solicitation 36C25227B0008_1.docx |
| Questions due | Tuesday, December 15, 2026, 3:30 PM CSTQuestions must be in writing to the contracting officer, Amber Jendrzejek. Telephone inquiries are not accepted.S02 Solicitation 36C25227B0008_1.docx |
| Estimated value | Between $1,000,000 and $2,000,000Given as a project magnitude range, not an official estimate.S02 Solicitation 36C25227B0008_1.docx |
| Contract type | Firm-fixed-price, all-inclusive lump sum base bidThe bid schedule asks for one lump sum price for the base bid.S02 Solicitation 36C25227B0008_1.docx |
| Site visit | December 8, 2026, 10:00 AM CST, Bldg. 102, Room 102GCalled a site visit and also a pre-bid conference. Whether attendance is mandatory is not stated.S02 Solicitation 36C25227B0008_1.docx |
How to respond
- Complete the SF 1442 offer page, the bid schedule with your all-inclusive lump sum base bid, and sign the VAAR 852.219-75 limitations on subcontracting certificate.
- Include a bid bond on Standard Form 24 under FAR 52.228-1, plus FAR 52.209-13(b)(1) or (2) and FAR 52.229-11(d), all properly completed.
- Seal the bid package, mark it with the solicitation number 36C25227B0008 and send it to ATTN: Amber Jendrzejek, Great Lakes Acquisition Center, 115 S. 84th Street, Suite 101, Milwaukee, WI 53214-1476, so it arrives by the due date.
- Send any written questions to Amber.Jendrzejek@va.gov by 3:30 PM on December 15, 2026, with the subject line RFI- 36C25227B0008-[YOUR COMPANY NAME].
Attached files
From SAM.gov. Download links open the original files.
- Attachment 1 - 550-26-121 SOW.pdfStatement of work listing the north tower scope and the 17 south tower tasks. You must read it and price the work it describes. Read.
- Attachment 2 - 550-26-121 Bid Documents Drawing Set.pdf Not read: over our length limit.
- S02 Solicitation 36C25227B0008_1.docxSolicitation form with the bid schedule, bid instructions and clauses. Only the start was provided. You must fill in and sign the offer forms and submit the required certifications. Read in part.
- Attachment 3 - 550-26-121 Bid Documents Project Manual - Specifications.pdfProject specifications. Pages 1 to 29 and 261 to 276 were provided, and pages 30 to 260 were not. You must read the full specifications on SAM.gov. Read in part (pages 1–29 and 261–276 of 276).
- Attachment 4 - Wage Determination 550-26-121CON.pdf Not read: over our length limit.
Not stated in what we read
- I could not review the wage determination (Attachment 4) or the drawing set (Attachment 2). You must read both on SAM.gov before pricing labor.
- Whether the December 8 site visit or pre-bid meeting is mandatory. The text of provision 52.236-27 was not provided.
- Bid guarantee amount and the performance and payment bond terms. The bid bond checkbox and the bond day count are not marked.
- Liquidated damages, payment schedule, retainage and any penalties. Not stated in the provided text.
- Current contractor, government estimate and any site-specific constraints. Not stated in the provided text.
- Terms in the cut-off part of the solicitation and specification pages 30 to 260, which were not provided.
Notice text
550-26-121 Emergent Repairs North Water Tower 71 & South Water Tower 94 CON
As published on SAM.gov.
Contacts
- Amber Jendrzejek, Contract Specialist, Amber.Jendrzejek@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Veterans Affairs for the same kind of work (NAICS 237110, service code Z1DA) in Illinois that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Construct Campus Water Softening Plant Project 550-20-103Troop Contracting Inc · 36C25222C0013 | $2,167,322 | Jun 30, 2026ended | IL |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 6, 2027, 1:00 PM CT42 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237110, water and sewer line and related structures construction, soonest deadline first.
- National Park ServiceRainwater system rehab and two buildings, Volcano, HI
- Forest ServiceBarn roof, siding and lead paint work, New Meadows, ID
- Indian Health ServiceReplacement septic system at Shelton home, WA
- Federal Aviation AdministrationWastewater plant upgrade at MMAC, Oklahoma City, OK
- US Coast GuardWater plant repairs at USCG station, Hudgins, VA
- Departmental OfficesSeven water turnout buildings in northwest New Mexico
- Department of the ArmySewage lagoon liner repair, Mud Mountain Dam, Enumclaw, WA
- Forest ServiceWaterline replacement at Red Canyon, Daggett County, UT
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy