- Opportunities
- Department of Veterans Affairs
- 36C25626R0084_1
Water tank, pumps and pipes, North Little Rock, AR
The VA is buying an upgrade to the water supply at the Eugene J. Towbin VA campus in North Little Rock, AR, including a new storage tank, a new pump house with pumps and controls, and replacement water pipe.
Official title: Y1DZ--598-22-115 Site Utility Infrastructure-NLR
- Deadline
- Jan 15, 2027, 4:00 PM CT
- 51 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- North Little Rock, AR
- Buyer: 256-Network Contract Office 16 (36C256)
What they're buying
Work lasts 720 calendar days after notice to proceed, and only verified service-disabled veteran-owned small businesses can bid.
Top catches
“(hour) local time 01-05-2027” SOLICITATION_36C25626R0084_1.pdf, page 1
The solicitation form lists January 5, 2027 at 4 PM Central, but Amendment 0001 and the SAM record say January 15, 2027. Plan for January 15 but confirm it in the amendment on SAM.gov, which we could not review.
“The new tank connects to the existing 250,000-gallon tower with new piping, a pump house, pumps, controls, chlorination, and remote monitoring for full integration and redundancy.” SOLICITATION_36C25626R0084_1.pdf, page 5
The statement of work says the existing 250,000-gallon tower is demolished, while the solicitation says the new tank connects to that tower. The specification also calls for 304 stainless steel pipe, while the solicitation says copper or PVC, so ask the contracting officer which is correct before you price the job.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 4 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish the existing 250,000-gallon elevated water tower, including below-grade supports and piping vaults, in the phasing schedule
- Build a new elevated water storage tank with supporting structure, piping and appurtenances
- Build a new pump house with a triplex booster station of three 30 HP pumps rated 300 GPM each, controls, emergency generator, fence and cameras
- Replace failing water pipe, loop the supply lines, and add backflow preventers on fire protection lines
- Pressure test, disinfect and hyper-chlorinate new piping; provide a written testing and commissioning plan
- Provide a 30-hour OSHA superintendent full time on site, OSHA 10-hour training for all workers, and weekly progress meetings
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Two different offer deadlines. The solicitation form lists January 5, 2027 at 4 PM Central, but Amendment 0001 and the SAM record say January 15, 2027. Plan for January 15 but confirm it in the amendment on SAM.gov, which we could not review.
- Tower demolition conflicts with description. The statement of work says the existing 250,000-gallon tower is demolished, while the solicitation says the new tank connects to that tower. The specification also calls for 304 stainless steel pipe, while the solicitation says copper or PVC, so ask the contracting officer which is correct before you price the job.
- Key plans and wage rates not reviewed. Attachment C (water plans) could not be read, and Attachment D (Davis-Bacon wage determination) was left out for length. You must read both before pricing labor and layout, because we could not review them.“The applicable Davis Bacon WD for this solicitation is incorporated as an attachment to this solicitation.” SOLICITATION_36C25626R0084_1.pdf, page 9
- Pre-award forms and SDVOSB status. Only SDVOSBs verified in VetCert at offer and at award can win. Your offer must also include the EMR form, three years of OSHA 300 and 300A logs, VETS-4212 proof for 2025, and the VAAR 852.219-75 certificate, and the EMR form says an EMR above 1.0 disqualifies you.“Offerors shall provide Experience Modification Rate (EMR). See Attachment F.” SOLICITATION_36C25626R0084_1.pdf, page 15
- Bid bond and performance bonds. The bid guarantee is 20 percent of your offer, up to $3,000,000, on form SF24, and the winner must post performance and payment bonds for 100 percent of the award within 10 days. Attachment E, the bid bond form, was not included, so confirm your surety can meet this before you bid.“a Payment Bond, SF 25A, each in the penal sum of 100% of the award amount.” SOLICITATION_36C25626R0084_1.pdf, page 7
- Site visit and RFI dates moved. Amendment 0001 sets the site visit for 12/08/2026 with no time, replacing December 1 at 1:00 PM CT, and moves RFIs to 12/18/2026 from 12/11/2026. Only one site visit will be held with no make-up visits, so confirm the time on SAM.gov.“Site Visit date: 12/08/2026.” Notice text
Key terms
| Who can bid | Verified SDVOSBs only100% set-aside. Must be verified in VetCert at offer submission and at award.Notice text |
|---|---|
| Contract period | 720 calendar days after notice to proceedSolicitation assumes notice to proceed within 30 days after award.Notice text |
| How they choose | Best-value tradeoff; past performance is weighted above priceAward may be made without discussions. The government may pick a higher-priced offer.SOLICITATION_36C25626R0084_1.pdf, page 11 |
| How to submit | Email to julius.jones@va.govOne email only, 15MB limit, with Volume I and Volume II as two attachments.SOLICITATION_36C25626R0084_1.pdf, page 10 |
| Questions due | 12/18/2026 (per Amendment 0001)Solicitation had said 12/11/2026 at 12:00 PM CT. Questions go by email only; no phone calls.Notice text |
| Estimated value | Between $20,000,000 and $50,000,000This is the construction magnitude range. No exact estimate is given.SOLICITATION_36C25626R0084_1.pdf, page 1 |
| Contract type | Firm-fixed-price construction contractPerformance and payment bonds are required, and the specification sets a one-year warranty.SOLICITATION_36C25626R0084_1.pdf, page 16 |
| Site visit | 12/08/2026 (time not stated in amendment)Solicitation had set Tuesday, December 1, 2026 at 1:00 PM CT. Attendance was not mandatory.Notice text |
How to respond
- Read Amendment 0001 (36C25626R0084+0001.pdf) on SAM.gov first. We could not review it, so confirm the January 15, 2027 deadline and the 12/08/2026 site visit there.
- Email RFI questions in Microsoft Word format to Julius.Jones@va.gov and Kaitlyn.West1@va.gov by 12/18/2026. Use the subject line: Company Name, RFI #1, 36C25626R0084 and Project Title. The amendment does not state a time.
- Confirm your SDVOSB verification in VetCert and your active SAM registration, and complete the Reps and Certs.
- Prepare Volume I (past performance, 20 pages plus cover, 12 pt, 8.5 x 11 in) and Volume II with the signed SF1442, a price breakdown by division, the SF24 bid bond, VETS-4212 proof, the EMR form, OSHA logs, and the VAAR 852.219-75 certificate.
- Send one email with both volumes as two attachments, under 15MB, to julius.jones@va.gov by 4:00 PM Central Time on January 15, 2027. Faxed submissions are not accepted.
Attached files
From SAM.gov. Download links open the original files.
- 36C25626R0084 0001.pdf Not read: over our length limit.
- Attachment D_Wage Determination AR20260032 05.18.26.pdf Not read: over our length limit.
- Attachment B_NLR VA Specifications.pdfTechnical specifications for the water pipe, pump station and chlorine analyzer. Only pages 1-28 and 1149-1160 were provided, so you must read the full file yourself. Read in part (pages 1–28 and 1149–1160 of 1160).
- Attachment C_WATER PLANS.pdf Could not be read.
- Attachment A_598-22-115 Upgrade Replace Site Utility Infrastructure-Statement of Work.pdfThe statement of work listing scope, phasing, security, outage rules and warranty. You must read and price it; no form to sign. Read.
- Attachment F_EMR Form.pdfA pre-award safety form asking for OSHA 300 data for 2022 to 2025, your NAICS code, safety program owner and EMR. You must complete it and submit it with your proposal. Read.
- Attachment E_Standard Form 24 - Bid Bond.pdf Not read: over our length limit.
- SOLICITATION_36C25626R0084_1.pdfThe solicitation with the SF1442 offer form, submission rules, basis for award and clauses. You must complete and sign the offer page and submit Volume II. Read in part (pages 1–22 and 58–69 of 69).
Not stated in what we read
- Start time of the 12/08/2026 site visit, and whether attendance is required. The amendment gives only the date.
- Question cut-off date. The amendment says it will be listed in the RFP, which was not fully provided.
- Exact estimated value. Only a range of $20,000,000 to $50,000,000 is given.
- Contents of Attachment C (water plans) and Attachment D (wage rates). Neither could be reviewed here.
- Payment terms, liquidated damages and price escalation. Solicitation clauses on pages 23-57 were not provided.
- Personnel vetting and credentialing requirements under VAAR 852.204-72. That clause was not provided.
Notice text
11/19/2026, Amendment 0001: The purpose of this amendment is to advise all offerors of the following changes to the solicitation regarding date extensions: Site Visit date: 12/08/2026. RFIs due date: 12/18/2026. Proposal due date: extended to 01/15/2027. See attached PDF, 36C25626R0084 0001. No other changes were made via this amendment. _____________________________________________________________________________________________________ This procurement will be issued as a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) through RFP procedures under FAR 15.
The Central Arkansas Veterans Healthcare System (CAVHS) has a requirement Upgrade/Replace Site Utility Infrastructure, Project #598-22-115. The period of performance is 720 calendar days after issuance of the Notice to Proceed. Location of the work is at the Eugene J. Towbin (EJT) VA Healthcare Center, 2200 Fort Roots Drive, North Little Rock, AR 72114. The point of contact for this notice is Contract Specialist, Julius Jones at Julius.Jones@va.gov.Telephone requests will NOT be accepted.
237110 – Water and Sewer Line and Related Structures Construction. is applicable to the RFP and the Small Business Size Standard is $45M. Interested offerors are asked to first read over the RFP and all its associated attachments/documents in their entirety prior to forwarding any questions to the Contracting Officer. A cut-off time/date for receipt of questions will be established and listed in the RFP, as well as a time/date for the scheduled Site Visit.
Only one Site Visit will be conducted and no requests for additional Site visits or make-up Site Visits will be granted. Amendments to the RFP will not be mailed but will be posted at the SAM.gov website. Offerors are responsible for obtaining the RFP (and associated documents/attachments) from the SAM.gov website and for acknowledging all amendments to the RFP. It is the responsibility of all interested offerors to check the SAM.gov website as necessary for any Amendments to the RFP (to include the day bids are due).
In accordance with VAAR 819.7003 Eligibility, at the time of submission of a proposal, the offeror must represent to the Contracting Officer that it is a SDVOSB concern, that it is a small business concern under the NAICS Code assigned to the acquisition, and that it is verified for eligibility in the Small Business Association website (Veteran Small Business Certification (VetCert)) and have the Veterans Small Business Certification. SDVOSB concerns must also be registered in the System for Award Management (SAM) database at www.sam.gov. OFFERORS ARE ADVISED TO CHECK THE SITE FREQUENTLY AS THEY ARE RESPONSIBLE FOR OBTAINING AMENDMENTS TO THE SOLICITATION NOTICE.
In accordance with FAR Overhaul 5.101(c)(4)(v), equitable adjustments for change orders will be reviewed per FAR 36 and 43.
As published on SAM.gov.
Contacts
- Julius Jones, Contract Specialist, Julius.Jones@va.gov, 501-257-1044
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 15, 2027, 4:00 PM CT51 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237110, water and sewer line and related structures construction, soonest deadline first.
- National Park ServiceRainwater system rehab and two buildings, Volcano, HI
- Forest ServiceBarn roof, siding and lead paint work, New Meadows, ID
- Indian Health ServiceReplacement septic system at Shelton home, WA
- Federal Aviation AdministrationWastewater plant upgrade at MMAC, Oklahoma City, OK
- US Coast GuardWater plant repairs at USCG station, Hudgins, VA
- Departmental OfficesSeven water turnout buildings in northwest New Mexico
- Department of the ArmySewage lagoon liner repair, Mud Mountain Dam, Enumclaw, WA
- Forest ServiceWaterline replacement at Red Canyon, Daggett County, UT
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy