1. Opportunities
  2. Department of Health and Human Services
  3. Indian Health Service
  4. 75H70127R00007

Replace sewer lift station at Rosebud Hospital, SD

Replace the sewer lift station that serves the Rosebud Hospital quarters and tribal program buildings in Rosebud, SD, with a new wet well, dry well, chopper pumps, force main connection and control system.

Official title: Rosebud Lift Station Construction

Deadline
Dec 1, 5:00 PM ET
5 days left
Who can bid
Not stated
The notice names no set-aside
Last time
$741K
Likely Bethel Construction LLC
Place
Rosebud, SD
Buyer: Div of Engineering Svcs - Seattle

What they're buying

The fixed-price job runs 240 calendar days from notice to proceed, and offers are due Tuesday, December 1, 2026.

Top catches

Submission contact conflicts
“The Contract Specialist and point of contact for this action is changed from Daniel Cotto to Robert Miller.” Notice text

Amendment A01 changes the point of contact to Robert Miller, but the RFP still says to submit offers to daniel.cotto@ihs.gov. The amendment names no new submission address, so ask the CO in writing which address to use before you send.

Deadline time zone unclear
“Response deadline: 2026-12-01T17:00:00-05:00” SAM.gov record

SAM lists 5:00 PM Eastern. The RFP cover form says local time, and its hour is unreadable, so the governing time zone is not clear. Ask the CO to confirm and plan to send well before the listed time.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 6 of 16 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove and demolish the existing lift station (wet well, dry well, pumps and piping) after the new station takes the full sanitary flow.
  • Build a new lift station with a wet well, a dry well, chopper pumps and a force main connection.
  • Install a new control system to monitor flow into the station and the status of the equipment.
  • Connect to the upstream manholes and gravity sewer, and to the force main.
  • Schedule A items in Section 01270: sewer main, 4-inch force main, gate valve, air/vacuum release valve manhole, chain link fence, concrete access road, site power and a telephone line. Quantities are approximate.
  • Abandon the old lift station: pump out and dispose of contents, remove components and fill voids.

Who did it before

$741K

on the contract that likely holds this work now: Bethel Construction LLC. It ended Jun 1, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Submission contact conflicts. Amendment A01 changes the point of contact to Robert Miller, but the RFP still says to submit offers to daniel.cotto@ihs.gov. The amendment names no new submission address, so ask the CO in writing which address to use before you send.
  • Deadline time zone unclear. SAM lists 5:00 PM Eastern. The RFP cover form says local time, and its hour is unreadable, so the governing time zone is not clear. Ask the CO to confirm and plan to send well before the listed time.
  • Site visit date has passed. The site visit and preproposal conference were set for 11/02/2026, which is before today. The RFP says offerors are urged and expected to inspect the site, so ask the CO how to see it before you price.“An organized site visit is scheduled for 11:00 AM Central Time, 11/02/2026.” B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 52
  • Equal products rules conflict. Section H.16 says equivalents are not reviewed during the solicitation, but Section M says alternatives may be proposed in your offer. If you plan an equal pump or part, ask the CO in writing before you bid.“Proposed equivalents will not be reviewed during the solicitation period.” B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 20
  • Pump type and scope conflict. The notice calls for chopper pumps, but the Section 01270 lift station item lists submersible sewage pumps. Section 01100 also describes about 20 feet of sewer main and 123 feet of force main, which does not match full replacement. Ask the CO which pump type and scope to price.“submersible sewage pumps and guide rails” J03 Tech Specs RLSC.pdf, page 5
  • TERO fee and permits. The SOW says TERO typically charges a fee of 4% on the total contract price, plus a $250 annual work permit for each non-local employee. Price these as costs, and ask TERO for current rules, since the SOW says the Tribe may change them.“Typical requirements of TERO include a fee of 4% on the total contract price” J01 SOW Rosebud Lift Station Construction.docx

Key terms

Who can bidOpen to all sizes; not set aside for small businessYou self-certify size status under NAICS 237110, size standard $45 million, and your SAM record must be current before the due date.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 57
Contract period240 calendar days from notice to proceedStart work within 10 calendar days after notice to proceed. Evaluation uses 03/01/2027 as a sample notice date only.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 10
How they chooseLowest priced offer rated acceptableOne sentence also calls the process best value, which conflicts with LPTA. A HUBZone price preference also applies.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 59
How to submitEmail PDF files; each file 8 MB or lessVolume II (price) goes in a separate email. The address is unclear after the amendment.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 53
Questions duePassed: 7 days before the due date, about 11/24/2026Late questions may be answered only at the Government's discretion.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 52
Estimated valueFunds currently estimated at $850,000.00This is the funding available for award, not a published cost estimate.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 59
Contract typeFirm-fixed-price, lump sumQuantities are approximate. You must verify them and price the whole job.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 5
Site visitScheduled 11/02/2026, already passedThe site visit and online preproposal conference were on that date. Ask the CO how to see the site.B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf, page 52

How to respond

  1. Email your offer as PDF files to the address the CO confirms. The RFP names daniel.cotto@ihs.gov, and amendment A01 names Robert.Miller2@ihs.gov as the contact.
  2. Send Volume II (price) as a separate email marked as Volume II. Keep each file under 8 MB and put 75H70127R00007 Rosebud Lift Station Construction and 'email X of X' in each subject line.
  3. Complete SF-1442 blocks 14 to 20c with your lump sum price in block 17. Acknowledge amendment A01 in block 19, and attach the J08 schedule and a copy of the bid bond (20 percent of bid price or $3 million, whichever is less).
  4. In Volume I, include a technical narrative, a summary schedule using 03/01/2027 as the notice date, and at least one sewage lift station replacement from the last five years. The optional experience form says six years, so check the window.
  5. Do not contact anyone named in the attachments. Send all questions in writing to the Contracting Officer, since the question deadline has passed.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Liquidated damages amount or daily rate: the pages provided refer to damages but do not state an amount.
  • How sewage flow will be kept running during the switch to the new station: the text does not say.
  • Whether performance and payment bonds are required: the SF-1442 block 12a checkbox is not clearly marked.
  • Pay rates for labor: the wage determination (J10) was not included, so you must read it yourself before pricing labor.
  • TERO terms in RFP clause H.50 and RFP pages 23-50 were not provided, so the full TERO terms are unknown.
  • The plans (J02), price schedule (J08), calculation sheet (J09), payroll form (J11), optional past performance questionnaire, and site files J04-J07 were not reviewed. You must read them.

Notice text

Amendment A01: 1. The purpose of this solicitation amendment A01 is to update the Contract Specialist. 2. The Contract Specialist and point of contact for this action is changed from Daniel Cotto to Robert Miller. 3. Robert Miller's contact information is Robert.Miller2@ihs.gov, 325-518-0521. 4. All other terms and conditions remain unchanged. The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units.

The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.

This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished.

The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements.

The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Indian Health Service for the same kind of work (NAICS 237110, service code Y1ND) in South Dakota that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

ContractObligatedEndsState
Crow Creek Community Sewer RenovationBethel Construction LLC · 75H70125C00011$741,402Jun 1, 2026endedSD

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Indian Health Service by email

Each morning we'll send the new solicitations and sources-sought notices from Indian Health Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy