- Opportunities
- Department of Agriculture
- Forest Service
- 12445527Q0008
Well pump replacement at Whiteface Campground, Makinen, MN
Replace the submersible pump, pressure tank, hydrant, well casing and wiring at the loop 3 well at Whiteface Campground in Makinen, MN, for a firm fixed price.
Official title: Whiteface Campground Well Replacement
- Deadline
- Dec 14, 12:00 PM CT
- 19 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237110: $45 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Makinen, MN
- Buyer: USDA-FS, Csa East 13
What they're buying
Work must be complete by June 25, 2027, though the SF-1442 cover page also says 90 calendar days after award.
Top catches
“(hour) local time” Sol_12445527Q0008.pdf, page 1
SAM.gov says noon at UTC-06:00, but the SF-1442 says only 1200 local time at an Atlanta, Georgia address. Get the time zone confirmed in writing by November 30 and send your quote before 11:00 AM Central to be safe.
“The SF-1442 cover indicates a 90-calendar-day performance period, while the detailed terms require completion by June 25, 2027.” Q_and_A-12445527Q0008.xlsx
The cover page allows 90 calendar days after award, but the detailed terms require completion by June 25, 2027. Ask which controls, and check that your schedule meets the earlier date.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 5 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the submersible well pump on the loop 3 well, rated at least 10 gallons per minute, 3/4 horsepower and 240 volts, with a flow control valve.
- Install a buried Amtrol Well-X-Tol WX-202-UG pressure tank, precharged to 30-35 lbs, with Baker Water Systems pump controls and a pressure switch.
- Replace the Woodford S4H frost-free hydrant (7 foot bury depth) and the water line, using Schedule 80 PVC well piping and 160 psi polyethylene pipe.
- Extend the well casing by welding so it stands 12 to 18 inches above grade. It now stands about 8 inches.
- Replace wiring from the new pump to the control box. Reuse the wiring from the box to the panel only if it is in good condition.
- Hydrostatic test and disinfect the system, backfill and grade the site, remove old equipment and debris, and deliver the old hydrant to the Forest Service.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline time zone unclear. SAM.gov says noon at UTC-06:00, but the SF-1442 says only 1200 local time at an Atlanta, Georgia address. Get the time zone confirmed in writing by November 30 and send your quote before 11:00 AM Central to be safe.
- Performance period conflicts. The cover page allows 90 calendar days after award, but the detailed terms require completion by June 25, 2027. Ask which controls, and check that your schedule meets the earlier date.
- Well contractor must be licensed. Only a Minnesota-licensed water well contractor may do the well alteration and repair. If your firm is not one, you need a licensed contractor on the job, and you should confirm the arrangement is allowed before you bid.“It is required that all water well alteration/repair work be performed by a water well contractor who is licensed in Minnesota.” Att 02_SOW and Specs_261026.pdf, page 3
- Price every line or be rejected. Quotes without pricing for all items, including the options for the pitless adapters and the loop 4 well, may be treated as non-responsive. Price every line on the Schedule of Items before you submit.“to be considered responsive, contractors must submit pricing for all items.” Sol_12445527Q0008.pdf, page 10
- Payment protection cost included. Above $35,000 you must provide the payment protection required by clause 52.228-13, and its cost must be in your price. The government will not raise the price to cover it, and the SF-1442 says no bonds are required, so ask which applies.“If the total award price exceeds $35,000.00, Alternative payment Protections will be required IAW 52.228-13.” Att 01_Schedule of Items_261105.docx
- Loop 4 pump size conflicts. The old loop 4 well log reports a yield of 1.5 GPM, but the specification requires a pump of at least 10 GPM. Ask the contracting officer in writing how to price the loop 4 pump before you finalize the option price.“The historical well log reports a yield of 1.5 GPM, while the specifications require a pump capable of at least 10 GPM.” Q_and_A-12445527Q0008.xlsx
Key terms
| Who can bid | Small businesses only (total small business set-aside)Size standard is $45,000,000.00 for NAICS 237110. Your SAM.gov registration must be active.Notice text |
|---|---|
| Contract period | Complete by June 25, 2027 (cover page also says 90 days after award)Loop 3 must stay open for public use from May 1 to October 1. The two terms conflict.Sol_12445527Q0008.pdf, page 4 |
| How they choose | Lowest priced responsible quoter who is responsive and whose quote is fair, reasonable and realisticOne firm fixed price purchase order is expected. The standard FAR evaluation clause does not apply.Sol_12445527Q0008.pdf, page 10 |
| How to submit | Email your quote to paul.boucher@usda.gov. Email only; hard copies are not accepted.Include the signed Schedule of Items, signed SF-1442 blocks 14 to 20C, amendment acknowledgments and any missing representations.Sol_12445527Q0008.pdf, page 11 |
| Questions due | Monday, November 30, 2026, 3:00 PM Central timeSend by email to paul.boucher@usda.gov with the solicitation name and number in the subject line.Sol_12445527Q0008.pdf, page 11 |
| Estimated value | Government estimates $25,000.00 to $100,000.00 for all base and options combinedThis is a magnitude estimate only. Funding is not stated.Sol_12445527Q0008.pdf, page 10 |
| Contract type | Firm fixed price purchase order with lump sum line items and a single awardCommercial construction RFQ. Payment protection applies if the award exceeds $35,000.Sol_12445527Q0008.pdf, page 10 |
| Site visit | Strongly expected, but not stated as mandatoryNo site contact or access rules are stated. Bidder questions 4 and 8 asked about this.Sol_12445527Q0008.pdf, page 10 |
How to respond
- Confirm your SAM.gov registration is fully active, not ID Assigned, and that your firm meets the $45,000,000 size standard for NAICS 237110.
- Email any remaining questions to paul.boucher@usda.gov by Monday, November 30, 2026, 3:00 PM Central time, with 12445527Q0008 in the subject line.
- Price all four lines on the Schedule of Items (0001 base, 0002 and 1002 pitless adapters, 1001 loop 4 well), then sign, date and add your UEI.
- Complete and sign SF-1442 blocks 14 to 20C, list any amendments you received, add any required representations not already in SAM, and email everything to paul.boucher@usda.gov.
- Send the email before Monday, December 14, 2026, 12:00 PM (-06:00 on SAM.gov). Hard copies are not accepted, and your prices must stay firm for 45 calendar days after the due date.
Attached files
From SAM.gov. Download links open the original files.
- Att 03_Wage Rates_260730.pdfThe St. Louis County, Minnesota construction wage determination. Read it and use these labor rates and fringes when you price crews. You do not sign it. Read.
- Att 01_Schedule of Items_261105.docxThe price form. You must price all four lines, then sign, date and add your UEI. Read.
- Sol_12445527Q0008.pdfThe solicitation and SF-1442 offer form with the clauses. You must complete and sign the offer section on page 2 and read the clauses. Read.
- Q_and_A-12445527Q0008.xlsxBidder questions submitted so far. Read it. The text we reviewed shows questions but no answers. Read.
- Att 02_SOW and Specs_261026.pdfThe work specifications and drawings references. Read it in full before pricing. You do not sign it. Read.
Not stated in what we read
- Answers to the bidder questions. The Q&A file lists the questions but shows no answers in the text we reviewed.
- The confirmed time zone for the noon deadline.
- Which performance period controls: 90 days after award or completion by June 25, 2027.
- Whether a prime contractor may subcontract the licensed well work, and whether its onsite representative can come from a subcontractor.
- Whether the loop 4 pump can be sized to the actual well yield, and whether funding covers the loop 4 option.
- The site visit contact, access rules, and whether any amendments have been issued.
Notice text
This is a solicitation for commercial construction in accordance with RFO parts 12 and 36. Solicitation number 12445527Q0008 is issued as a Request for Quotation (RFQ) for the upgrading of well equipment, including: submersible pump, buried pressure tank, frost-free hydrant, control box, pressure switch, pitless adapter, electrical wiring and extending the well casing. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110 Water and Sewer Line and Related Structures Construction. The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
As published on SAM.gov.
Contacts
- BOUCHER, PAUL A, paul.boucher@usda.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 14, 12:00 PM CT19 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237110, water and sewer line and related structures construction, soonest deadline first.
- National Park ServiceRainwater system rehab and two buildings, Volcano, HI
- Forest ServiceBarn roof, siding and lead paint work, New Meadows, ID
- Indian Health ServiceReplacement septic system at Shelton home, WA
- Federal Aviation AdministrationWastewater plant upgrade at MMAC, Oklahoma City, OK
- US Coast GuardWater plant repairs at USCG station, Hudgins, VA
- Departmental OfficesSeven water turnout buildings in northwest New Mexico
- Department of the ArmySewage lagoon liner repair, Mud Mountain Dam, Enumclaw, WA
- Forest ServiceWaterline replacement at Red Canyon, Daggett County, UT
Free · at most one email a morning
Get new notices from Forest Service by email
Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy