Booster pump station and tank near Bloomfield, NM
You would build a pre-engineered concrete booster pump station and install a secondary regulation tank at Regulation Tank No. 3, with piping, electrical work, SCADA equipment and erosion control, about 26 miles south of Bloomfield, New Mexico.
Official title: Y--NGWSP Cutter Lateral Reach 21 Booster Plant
- Deadline
- Jan 25, 2027, 10:00 AM MT
- 61 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237110: $45 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Upper Colorado Regional Office
What they're buying
The work runs from 04/05/2027 to 05/22/2028 under a firm fixed price contract.
Top catches
“The amount of the bid guarantee shall be 20 percent of the bid price or $2 million, whichever is less.” 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf, page 77
The bid guarantee is 20 percent of your bid price or $2 million, whichever is less. Arrange a bid bond or another accepted form before the due date, because award requires proof of it; this text is from an earlier version, so confirm the amount in the current solicitation.
“The offeror shall fill out the Price Schedule in total in order to be considered for award.” Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf, page 81
You must fill in all 64 price lines (CLINs 1 through 64), or your offer will not be considered for award. The contracting officer estimates the mobilization line should not exceed 5 percent of your total price.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 11 of 15 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Pre-engineered concrete booster pump station with foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing and pipe connections (Price Schedule A).
- Secondary regulation tank (500,000 gallons per the site tour slides) at Regulation Tank No. 3, with foundation, piping, valving, electrical work and cathodic protection (Price Schedule B).
- Erosion and scour control: retaining wall, swale, runoff channel, site regrading, riprap and erosion control blanket.
- Gravel surfacing at the booster plant and replacement gravel surfacing at Regulation Tank No. 3 (Schedule B lists 390 cubic yards).
- SCADA equipment and radio communications system at both sites.
- Full-time survey support by a registered professional land surveyor, with quantity survey notes and as-built drawings submitted with each monthly invoice.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Bid guarantee required. The bid guarantee is 20 percent of your bid price or $2 million, whichever is less. Arrange a bid bond or another accepted form before the due date, because award requires proof of it; this text is from an earlier version, so confirm the amount in the current solicitation.
- Price every line or lose award. You must fill in all 64 price lines (CLINs 1 through 64), or your offer will not be considered for award. The contracting officer estimates the mobilization line should not exceed 5 percent of your total price.
- Two different bid addresses. Standard Form 1442 says to deliver offers to the Salt Lake City regional office, but the solicitation preface lists a Farmington, NM office for email, mail and hand delivery. Confirm with the contract specialist which place counts before the due date, and do not rely on one address alone.“Salt Lake City UT 84138” Sol_140RR027B0004.pdf, page 1
- Questions due November 30. Questions must be in writing to the contracting officer and contract specialist, and no verbal questions were taken at the site tour. Send any gaps in scope, price schedule or tax handling by the deadline, since answers come only by amendment by December 17, 2026.“Questions Due: November 30, 2026, at 1 p.m. MST.” Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf, page 4
- Weekday daylight work only. Work is allowed only from sunrise to sunset, Monday through Friday, unless the COR approves otherwise. Weekend or holiday work needs written notice 14 working days ahead, and water shutdowns are limited to 24 hours unless approved, so build these limits into your crew and shutdown plan.“Allowable work hours are sunrise to sunset, Monday through Friday, unless otherwise approved by COR.” Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026_Final_654_pg.pdf, page 21
- Schedule dates do not match. The notice says work starts within 21 days and finishes within 393 calendar days after award, yet a fixed period runs to 05/22/2028. From 04/05/2027, 393 days ends about 05/02/2028, so ask which end date governs before you plan crews and costs.“Period of Performance: 04/05/2027 to 05/22/2028” Sol_140RR027B0004_Amd_0002.pdf, page 2
Key terms
| Who can bid | Small businesses only (total small business set-aside)The notice does not give the size standard, so check it yourself for NAICS 237110.SAM.gov record |
|---|---|
| Contract period | 04/05/2027 to 05/22/2028The notice also says 393 calendar days after award, and the two do not line up.Sol_140RR027B0004_Amd_0002.pdf, page 2 |
| How they choose | Lowest priced responsible bidder that complies with the solicitationRanked on total bid price before taxes, and prices must also be balanced and fair and reasonable.Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf, page 82 |
| How to submit | Email, mail or hand delivery to Philoma Singer, Farmington, NMThe SF-1442 cover names a Salt Lake City address instead. See the catch on bid addresses.Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf, page 2 |
| Questions due | Monday, November 30, 2026, 1 p.m. MSTQuestions must be in writing. Answers will be posted by amendment on SAM.gov by December 17, 2026.Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf, page 4 |
| Estimated value | Between $10,000,000 and $25,000,000 (project size)This is a disclosed size range for the project, not a contract price or government estimate.Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf, page 2 |
| Contract type | Firm fixed price construction with lump-sum and unit-price linesThe price schedules have 64 lines, and quantities are estimates used for comparison only.Sol_140RR027B0004.pdf, page 3 |
| Site visit | November 12, 2026, 9 a.m. (already passed)Moved by Amendment 0001 to the Cutter Lateral Water Treatment Plant in Bloomfield, NM. The notice does not say attendance was mandatory.Sol_140RR027B0004_Amd_0001.pdf, page 2 |
How to respond
- Send written questions to Tyler Spencer (tyler_spencer@ios.doi.gov) and Philoma Singer (philoma_singer@ios.doi.gov) by Monday, November 30, 2026, at 1 p.m. MST, since verbal questions are not taken.
- Complete and sign the SF-1442 offer section, fill in all 64 price lines, and include a bid guarantee of 20 percent of the bid price or $2 million, whichever is less, after confirming the amount in the current version.
- Send one original and one copy in a sealed envelope marked with your name and address, solicitation number 140RR027B0004, and the due date and time. The notice lists Salt Lake City (SF-1442 Item 8), Farmington by mail or hand delivery, and email to philoma_singer@ios.doi.gov; confirm the place with the contract specialist first.
- Make sure your bid is received by Monday, January 25, 2027, at 10:00 a.m. MST, because the notice makes confirming receipt your responsibility.
- List Amendments 0001 and 0002 in Item 19 of the offer form, as the amendments require acknowledgment of receipt.
Attached files
From SAM.gov. Download links open the original files.
- SITE_TOUR_AGENDA_Reach_21_Booster_Site_0002.pdfAgenda for the November 12, 2026 pre-bid site tour; for information only, and you do not fill it in. Read.
- Attachment_4_-_NM20260046_Building_-_wage_determination_-_4_pages.pdf Not read: over our length limit.
- Attachment_3_-_NM20260040_Heavy_-_wage_determination_-_4_pages.pdf Not read: over our length limit.
- 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdfEarlier partial version of the solicitation from November 4; the November 16 version supersedes it, so read this only for comparison. Read in part (pages 1–8 and 77–82 of 82).
- Sol_140RR027B0004.pdfThe SF-1442 cover and offer form; you must complete the offer block, prices and acknowledgments and sign it. Read.
- Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026_Final_654_pg.pdfPart of the 654-page specifications (pages 1-25 and 625-654 were provided); read the sections that apply to your scope, and you do not sign it. Read in part (pages 1–25 and 625–654 of 654).
- Attachment_5_-_Construction_Contract_Administration.pdfA short notice pointing to an Interior website on contract change policy; for information only. Read.
- Attachment_2_-_00_00_02_100__DRAWINGS_34x22_20261027_rev_Final_97_pg.pdf Not read: over our length limit.
- Sol_140RR027B0004_Amd_0002.pdfAmendment adding question dates, an updated clause and site visit materials; you must acknowledge it on your offer. Read.
- Reach_21_Booster_Site_Visit_meet_up_location_change_4Nov26_0001.pdfEmail confirming the new site visit meeting location; for information only. Read.
- Sol_140RR027B0004_Amd_0001.pdfAmendment changing the site visit location and correcting the solicitation number; you must acknowledge it on your offer. Read.
- NGWSP_-_Reach_21_DZ_Booster_PP_Prebid__Site_Visit_-_November_12_2026_0002.pdfSlides from the November 12 site tour; for information only and not a contract document. Read.
- Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdfCurrent partial version of the solicitation; read it closely, since pages 9-77 were not provided, and fill in the forms your offer requires. Read in part (pages 1–8 and 78–82 of 82).
- 140R4027B0004_NGWSP_R21_CL_Booster_Plant_solicitation_2Nov26.pdfEarlier partial version of the solicitation with the wrong solicitation number in its file name; superseded, so read it only for comparison. Read in part (pages 1–8 and 77–82 of 82).
- CL_Reach_21_Booster_Plant_Site_Tour_Attendance_0002.pdf Scanned image, not read.
Not stated in what we read
- Wage determinations for heavy and building work (Attachments 3 and 4) were not included, so the minimum labor rates are unknown. Read them before you price labor.
- Drawings (Attachment 2, 97 pages) were not included, so you cannot check layouts or quantities against them. You must read them before pricing.
- The liquidated damages amount per day under FAR 52.211-12 is not in the pages provided.
- Whether performance and payment bonds are required is not clear, because the check box on the SF-1442 does not show in the extracted text.
- The limit on subcontracting under FAR 52.219-14 is not in the pages provided, and it matters for a small business that uses subcontractors.
- Pages 26 to 624 of the specifications, pages 9 to 76 of the solicitation, and page 77 of the current version were not provided, so those terms are unchecked.
Notice text
EO 14398 NGWSP Cutter Lateral Reach 21 Booster Plant
As published on SAM.gov.
Contacts
- Singer, Philoma, philoma_singer@ios.doi.gov, 5053245033
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 17, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 25, 2027, 10:00 AM MT61 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237110, water and sewer line and related structures construction, soonest deadline first.
- National Park ServiceRainwater system rehab and two buildings, Volcano, HI
- Forest ServiceBarn roof, siding and lead paint work, New Meadows, ID
- Indian Health ServiceReplacement septic system at Shelton home, WA
- Federal Aviation AdministrationWastewater plant upgrade at MMAC, Oklahoma City, OK
- US Coast GuardWater plant repairs at USCG station, Hudgins, VA
- Departmental OfficesSeven water turnout buildings in northwest New Mexico
- Department of the ArmySewage lagoon liner repair, Mud Mountain Dam, Enumclaw, WA
- Forest ServiceWaterline replacement at Red Canyon, Daggett County, UT
Free · at most one email a morning
Get new notices from Bureau of Reclamation by email
Each morning we'll send the new solicitations and sources-sought notices from Bureau of Reclamation, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy