Water main extension at White Horse Hill, St. Michael, ND
Install a new water main extension at White Horse Hill National Game Preserve in St. Michael, North Dakota, including pipe, a water meter and vault, valves, and horizontal drilling under a lake.
Official title: Y--White Horse Hill National Game Preserve Water Main
- Deadline
- Dec 9, 2:00 PM ET
- 14 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237110: $45 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: FWS Contracting Activity
What they're buying
The amended work period is May 15 to August 15, 2027, under a firm-fixed-price, small-business set-aside contract.
Top catches
“Response Due Date: By 2:00 PM EST on Thursday, December 3, 2026.” Notice_to_Offerors.pdf, page 2
The amendment moved the due date to December 9, but the Notice to Offerors still says December 3. Confirm the date with the contracting officer in writing and send your offer well before the earlier date to avoid a late rejection.
“completed three (3) projects within the project magnitude, of similar nature (to include water main extension work) and complexity that are federal or state projects.” Sol_140FGA26R0044.pdf, page 74
To be rated technically acceptable, you must show three completed federal or state projects of similar nature, including water main extension work, within the project size range. Without them, your price will not be used for award, so check your record before you price the job.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 6 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Install new 3-inch water main pipe (PVC and SDR 9 HDPE) connected to the existing system, with gate valves, air/vacuum release valves, and a gate valve box.
- Horizontal directional drilling: 1,375 linear feet under the lake, 250 linear feet under the gate, and 50 linear feet inside steel casing; an optional 400 linear feet is also shown.
- Water meter, meter setter, and remote register on a treated wood post, plus a concrete valve vault.
- Precast concrete manholes with cast iron frames and covers, and two spare insulated covers for Spirit Lake Water Resource Management.
- Earthwork and gravel surfacing: clearing, excavation, fill, compaction to 95 percent, gravel surfacing, and erosion blankets on slopes over 20 percent.
- Testing and records: leakage and hydrostatic tests, disinfection, tracer wire, a drilling log, and as-built plan and profile drawings.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Due date moved to December 9. The amendment moved the due date to December 9, but the Notice to Offerors still says December 3. Confirm the date with the contracting officer in writing and send your offer well before the earlier date to avoid a late rejection.
- Three past water projects required. To be rated technically acceptable, you must show three completed federal or state projects of similar nature, including water main extension work, within the project size range. Without them, your price will not be used for award, so check your record before you price the job.
- Bid bond plus two bonds after award. The notice requires a bid bond and, because of the project magnitude, both payment and performance bonds. Those bonds are due within 10 calendar days after award, so ask a surety about capacity and cost before you submit.“Due to the project magnitude, both payment and performance bonds will be required.” Notice_to_Offerors.pdf, page 2
- Price form needs a breakdown. You must fill in the price schedule as one lump sum and also send a price breakdown by division and subdivision, or your offer is treated as incomplete. The schedule's only line also names Prairie’s Edge Wildlife Drive-South Loop, so confirm with the contracting officer that this is the right form for this job.“offeror MUST also submit their proposal pricing broken down based on divisions and subdivisions.” Price_Schedule.pdf, page 1
- Lake drill length and pipe size open. The lake crossing is 1,375 feet of 3-inch HDPE, and a question in the Q&A says experts advise a limit of 800 to 1,000 feet for this pipe. The answer does not approve a larger pipe or fusible PVC, so ask the contracting officer in writing before you price the crossing.“SDR9 250 PSI HDPE that is under the lake at 1,375 LF” Questions_and_Answers_Amendment_1_0001.pdf, page 1
- Completion window conflicts. Section F says work must be complete within 60 days after notice to proceed, but the SF 1442 says 90 days. The amended work period runs May 15 to August 15, 2027, so confirm which limit applies before you plan crews and equipment.“complete the entire work ready for use not later than 60 days after the date the contractor receives the notice to proceed.” Sol_140FGA26R0044.pdf, page 9
Key terms
| Who can bid | Small businesses onlyTotal small business set-aside; you must be registered in SAM.Sol_140FGA26R0044.pdf, page 68 |
|---|---|
| Contract period | May 15, 2027 to August 15, 2027Replaces January 4 to April 4, 2027 in the original solicitation.Sol_140FGA26R0044_Amd_0001.pdf, page 2 |
| How they choose | Lowest price technically acceptable (LPTA)The lowest priced offer is checked first; if it is acceptable, it wins.Sol_140FGA26R0044.pdf, page 73 |
| How to submit | Email to Samantha_LaGue@ios.doi.govPut solicitation 140FGA26R0044 in the subject line; email is the stated method.Sol_140FGA26R0044.pdf, page 68 |
| Questions due | Tuesday, November 17, 2026, 2:00 PM ESTThis date has already passed as of November 21, 2026.Notice_to_Offerors.pdf, page 1 |
| Estimated value | $250,000 to $500,000 (project magnitude)The notice gives a range, not an exact estimate.Notice_to_Offerors.pdf, page 1 |
| Contract type | Firm-fixed priceThe government contemplates a firm-fixed-price award.Sol_140FGA26R0044.pdf, page 69 |
| Site visit | Thursday, November 12, 2026, 11:00 AM local timeAlready held; the Q&A says to contact the contracting officer if you missed it.Sol_140FGA26R0044.pdf, page 71 |
How to respond
- Email your offer to Samantha_LaGue@ios.doi.gov before 2:00 PM EST on Wednesday, December 9, 2026, with 140FGA26R0044 in the subject line.
- Include the completed SF 1442 (blocks 14 to 20C), the Price Schedule as a lump sum, and a price breakdown by division and subdivision.
- Attach acknowledgments of Amendment 0001 and up to three recent, relevant federal or state projects, with water main extension work among them.
- Format: 8 1/2 by 11 inch pages, type no smaller than 12 pitch, a 1-inch border, and no elaborate formats or bindings. State whether your SAM representations are already current.
- Include a bid bond with your offer. Where to send the bid bond is Not stated.
Attached files
From SAM.gov. Download links open the original files.
- Drawings.pdf Not read: over our length limit.
- Questions_and_Answers_Amendment_1_0001.pdfQuestions and answers released with Amendment 1; read the open answers on lake crossing pipe size before you price. Read.
- Notice_to_Offerors.pdfCover notice listing bonds, questions and response dates, and wage rate references; read it for bonding rules, but its December 3 response date is superseded. Read.
- DOL_Wage_Determination.pdf Not read: over our length limit.
- Sol_140FGA26R0044_Amd_0001.pdfAmendment 0001 changes the due date and work period and answers questions; you must acknowledge it with your offer. Read.
- SOW.pdfStatement of work with construction specifications; only parts were included, and you must price the work it describes after reading it in full. Read in part (pages 1–28 and 61–78 of 78).
- Price_Schedule.pdfPrice form with one lump-sum base item; you must fill it in and attach the breakdown. Read.
- Sol_140FGA26R0044.pdfSolicitation form and contract terms; you must complete the offer blocks, and Sections L and M set the submission and evaluation rules. Only parts were included for review. Read in part (pages 1–28 and 62–75 of 75).
Not stated in what we read
- The government estimate or exact award amount; the notice gives only a $250,000 to $500,000 project magnitude.
- The size standard for NAICS 237110 and whether your company qualifies under it.
- Whether 4-inch HDPE or fusible PVC can replace the 3-inch HDPE under the lake; the Q&A answer is not final.
- The bid bond amount; the notice requires a bid bond but does not state the amount.
- Contents of Drawings.pdf and DOL_Wage_Determination.pdf, which we could not review; you must read them on SAM.gov, including wage decision ND20260046.
- Whether you can get a second site visit; the Q&A invites requests, but no new date is given.
Notice text
EO 14398 - White Horse Hill National Game Preserve Water Main Extension
As published on SAM.gov.
Contacts
- Lague, Samantha, samantha_lague@fws.gov, 4132538349
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 2:00 PM ET14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237110, water and sewer line and related structures construction, soonest deadline first.
- National Park ServiceRainwater system rehab and two buildings, Volcano, HI
- Forest ServiceBarn roof, siding and lead paint work, New Meadows, ID
- Indian Health ServiceReplacement septic system at Shelton home, WA
- Federal Aviation AdministrationWastewater plant upgrade at MMAC, Oklahoma City, OK
- US Coast GuardWater plant repairs at USCG station, Hudgins, VA
- Departmental OfficesSeven water turnout buildings in northwest New Mexico
- Department of the ArmySewage lagoon liner repair, Mud Mountain Dam, Enumclaw, WA
- Forest ServiceWaterline replacement at Red Canyon, Daggett County, UT
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy